Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

22-0360 Civil Issue G

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

    N




                                                                          /
                                                                      /
                                                                 /
                                                            /
                                                                                                       /

                                                                                                           /
                                                       /




                                                                                                               /

                                                                                                                   /
                                                   /




                                                                                                                         /
                                               /
                                           /
                                       /




                                                                               GROUND FLOOR FFL39.50
                                                                                 BASEMENT FFL36.50




                       Surface Analysis: Elevation Ranges
                                  Minimum Elevation        Maximum Elevation
              Number      Color
                                        (m)                      (m)

                  1                    -4.720                    -4.500

                  2                    -4.500                    -4.000




                                                                                                                                                                                         T
                  3                    -4.000                    -3.500




                                                                                                                                                                                  EE
                                                                                                                                                                                TR
                  4                    -3.500                    -3.000




                                                                                                                                                                           NS
                  5                    -3.000                    -2.500




                                                                                                                                                                  SO
                                                                                                                                                                ER
                  6                    -2.500                    -2.000




                                                                                                                                                              ND
                                                                                                                                                           HE
                  7                    -2.000                    -1.500

                  8                    -1.500                    -1.000

                  9                    -1.000                    -0.500

                  10                   -0.500                        0.000

                  11                   0.000                         0.500

                  12                   0.500                         1.000

                  13                   1.000                         1.200


              PRELIMINARY BULK EARTHWORK VOLUMES
              CUT 1,147m³
              FILL   27m³
              SPOIL : 1,120m³

              NOTE:
              1. NO ALLOWANCE FOR TOPSOIL STRIP/RE-SPREAD
              2. NO ALLOWANCE FOR DRIVEWAY/BUILDING SLAB PAVEMENT THICKNESS
                                                                                                                        PLAN
              3. SOLID FILL (ZERO BULKING FACTOR)                                                                  SCALE A1 - 1 : 100
              4. EXCLUDES ALL BAD GROUND REPLACEMENT                                                                     A3 - 1 : 200

                                                                                                                                                   Issue   Made By   Date       Description
                                                                                                                                                                                                                 PROPOSED RESIDENCE                                                                                                                                                    Scale : AS SHOWN   NOTES:
                                                                                                                                                     F     M.T.      20/02/23   For Operational Works Approval
                                                                                                                                        REVISION




0       1     2           4        6           8           10m                                                                                       G     M.T.      22/06/23   For Operational Works Approval
                                                                                                                                                                                                                 at No.3 HENDERSON STREET SUNSHINE BEACH                                                                                                                               Job No.: 22-0360   1. Do not scale drawings.
                                                                                                                                                                                                                                                                                                                                                                                                          2. Scale is correct at A3.
                                                                                                                                                                                                                 Client: JMML DEVELOPMENTS
                                                                                                                                                                                                                                                                                                                                                                                       Dwg No.: C04       3. Check and verify all dimensions
SCALE 1:100                                            @A1                                                                                                                                                       Designed By : B.J. WINNING BEngTech (Civil), MEngPrac (Civil), MIEAust Drawn By : MT   Date : 16/05/22                                                                                     prior to commencement of work.
                                                                                                                                                                                                                 Certified By : B.R. CROMAR BEng(Civil), MEIAust, CPEng, RPEQ, NER                      Date : 16/05/22   Ph: (07) 5444 5578   Email: [email protected]   CUT FILL PLAN
Log in to download the original file

22-0360 Civil Issue G.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.