Original source · versioned page text
22-0360 Civil Issue G
N
/
/
/
/
/
/
/
/
/
/
/
/
/
/
GROUND FLOOR FFL39.50
BASEMENT FFL36.50
Surface Analysis: Elevation Ranges
Minimum Elevation Maximum Elevation
Number Color
(m) (m)
1 -4.720 -4.500
2 -4.500 -4.000
T
3 -4.000 -3.500
EE
TR
4 -3.500 -3.000
NS
5 -3.000 -2.500
SO
ER
6 -2.500 -2.000
ND
HE
7 -2.000 -1.500
8 -1.500 -1.000
9 -1.000 -0.500
10 -0.500 0.000
11 0.000 0.500
12 0.500 1.000
13 1.000 1.200
PRELIMINARY BULK EARTHWORK VOLUMES
CUT 1,147m³
FILL 27m³
SPOIL : 1,120m³
NOTE:
1. NO ALLOWANCE FOR TOPSOIL STRIP/RE-SPREAD
2. NO ALLOWANCE FOR DRIVEWAY/BUILDING SLAB PAVEMENT THICKNESS
PLAN
3. SOLID FILL (ZERO BULKING FACTOR) SCALE A1 - 1 : 100
4. EXCLUDES ALL BAD GROUND REPLACEMENT A3 - 1 : 200
Issue Made By Date Description
PROPOSED RESIDENCE Scale : AS SHOWN NOTES:
F M.T. 20/02/23 For Operational Works Approval
REVISION
0 1 2 4 6 8 10m G M.T. 22/06/23 For Operational Works Approval
at No.3 HENDERSON STREET SUNSHINE BEACH Job No.: 22-0360 1. Do not scale drawings.
2. Scale is correct at A3.
Client: JMML DEVELOPMENTS
Dwg No.: C04 3. Check and verify all dimensions
SCALE 1:100 @A1 Designed By : B.J. WINNING BEngTech (Civil), MEngPrac (Civil), MIEAust Drawn By : MT Date : 16/05/22 prior to commencement of work.
Certified By : B.R. CROMAR BEng(Civil), MEIAust, CPEng, RPEQ, NER Date : 16/05/22 Ph: (07) 5444 5578 Email: [email protected] CUT FILL PLAN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.