2019-06-17 General Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
AGENDA
General Committee
Meeting
Monday, 17 June 2019
commencing at 10am
Council Chambers, 9 Pelican Street, Tewantin
Committee: Crs Frank Wilkie (Chair), Jess Glasgow, Ingrid Jackson,
Joe Jurisevic, Frank Pardon, Brian Stockwell, Tony Wellington
“Noosa Shire – different by nature”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 19 sections
Section 2
GENERAL COMMITTEE MEETING AGENDA 17 JUNE 2019
TABLE OF CONTENTS
ITEM PAGE
ATTENDANCE & APOLOGIES -
PRESENTATIONS -
ITEMS REFERRED FROM PLANNING & ENVIRONMENT COMMITTEE -
1 MCU18/0158 - DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF
USE FOR RETAIL BUSINESS TYPE 2 – SHOP AND SALON AND
RECONFIGURATION OF A LOT (BOUNDARY REALIGNMENT) AT 34 ELM
STREET, COOROY
(Planning & Environment Committee Agenda, 11 June 2019, Item 3, Page 35)
Reason for referral – Significance of the issue
2 MCU18/0015 - DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF
USE (2 DETACHED HOUSES AND 12 MULTIPLE HOUSING - TYPE 4
CONVENTIONAL) AND RECONFIGURATION OF A LOT (1 INTO 4 LOTS PLUS
EASEMENT) AT 27 ATTUNGA HEIGHTS, NOOSA HEADS
(Planning & Environment Committee Agenda, 11 June 2019, Item 4, Page 60)
Reason for referral – Significance of the issue
3 OPW17/0555 PLANNING & ENVIRONMENT COURT APPEAL NO 2760 OF
2018, DEVELOPMENT PERMIT FOR OPERATIONAL WORKS FOR SIGNAGE
AT 4-24 GIBSON RD, NOOSAVILLE
(Planning & Environment Committee Agenda, 11 June 2019, Item 6, Page 105)
Reason for referral – Significance of the issue
4 NOOSA ENVIRONMENT STRATEGY & IMPLEMENTATION PLAN
(Planning & Environment Committee Agenda, 11 June 2019, Item 7, Page 119)
Reason for referral – Significance of the issue
5 ENVIRONMENT LEVY LAND ACQUISITION PROGRAM – UPDATE
(Planning & Environment Committee Agenda, 11 June 2019, Item 8, Page 123)
Reason for referral – For further consideration
ITEMS REFERRED FROM SERVICES & ORGANISATION COMMITTEE -
6 2019 COMMUNITY SATISFACTION SURVEY RESULTS
(Services & Organisation Committee Agenda, 11 June 2019, Item 19, Page 102)
Reason for referral – Significance of the issue
REPORTS DIRECT TO GENERAL COMMITTEE 3
7 PLANNING & ENVIRONMENT COURT APPEAL NO. 2881 OF 2018 -
ENFORCEMENT NOTICE ISSUED TO NOOSA AIRFIELD, LAKE WEYBA DVE &
EENIE CREEK RD, NOOSAVILLE 3
8 FINANCIAL PERFORMANCE REPORT - MAY 2019 11
CLOSED SESSION -
Page 2 of 20
Section 3
GENERAL COMMITTEE MEETING AGENDA 17 JUNE 2019
REPORTS DIRECT TO GENERAL COMMITTEE
7 PLANNING & ENVIRONMENT COURT APPEAL NO. 2881 OF 2018 - ENFORCEMENT
NOTICE ISSUED TO NOOSA AIRFIELD, LAKE WEYBA DVE & EENIE CREEK RD,
NOOSAVILLE
DOCUMENT INFORM AT ION
Author Manager Development Assessment, Kerri Coyle
Environment & Sustainable Development Department
Index ECM/ Application/ COM18/0263
Attachments 1. Mediation Agreement
2. Area to Revegetate
EXECUTIVE SUMMARY
Not applicable.
RECOMMENDATION
That Council note the report by the Manager Development Assessment to the General
Committee Meeting dated 17 June 2019 and agree to resolve the appeal on the basis of the
Mediation Agreement included as Attachment 1 & the Area to Revegetate included as
Attachment 2 to this report.
REPORT
A report was considered by the Planning & Environment Committee Meeting on 11 September
2018 regarding a Planning & Environment Court Appeal lodged against an Enforcement Notice
issued to Noosa Airfield due to unauthorised filling and vegetation clearing undertaken.
Significant uncontrolled fill material (concrete and earth) as well as builder’s demolition materials
had been placed into the manmade waterway at a number of locations. Vegetation had also
been removed from Lot 2 RP160983 (the lot adjacent the airfield) on the south-eastern side of
the access driveway.
Under the Noosa Plan filling where involving more than 100m3 or more of material requires a
Development Permit for Operational Works. Filling where involving less than 100m3 of material
also requires a Development Permit for Operational Works where the filling does not meet
Column 2 of Table 14-52 of the Earthworks Code which includes the following requirement:
S6.1 The fill material is solid clean earth, free of putrescibles or refuse material, vegetation,
acid sulphate soils, building or construction material or other material or contaminants.
The fill is estimated to exceed 100m3 and is not solid clean earth. Council records indicate that
no Development Permit for Operational Works has been obtained for the filling.
Under the Noosa Plan, the area on Lot 2 RP160983 on the south eastern side of the access
driveway, which has been cleared of vegetation, is identified by the Noosa Plan’s Biodiversity
Overlay as being a Riparian Buffer and Environmental Enhancement area. Clearing vegetation
within the Riparian Buffer and/or the Environmental Enhancement Area requires a Development
Permit for Operational Works.
Council records indicate that no Development Permit for Operational Works has been obtained to
clear vegetation.
Page 3 of 20
Section 4
GENERAL COMMITTEE MEETING AGENDA 17 JUNE 2019
Therefore, the filling and vegetation clearing was undertaken in breach of the Noosa Plan and
contrary to the Planning Act 2016.
The map below depicts the area where the fill was dumped and vegetation cleared.
Council resolved at the Ordinary Meeting of 20 September 2018 to continue enforcement against
Noosa Airfield to address the current breaches of The Noosa Plan.
In accordance with the Planning & Environment Court’s directions, mediation was attended by
Council officers and Noosa Airfield with the court registrar on 23 April 2019. At the mediation the
unlawful works were discussed with Noosa Airfield and Noosa Airfield was again requested to
undertake the actions outlined in the Enforcement Notice, including removal of unclean fill
material and ecological rehabilitation of the area cleared of vegetation.
Noosa Airfield agreed at mediation to undertake the required restitution works including the
following:
Remove the concrete and fill material from locations 1, 2 and 3 within 90 days of the signed
agreement subject to necessary extension if circumstances dictate (i.e. such as the site
being inaccessible due to wet weather). Locations 1, 2 and 3 are identified in the plan
attached to the Mediation Agreement included as Attachment 1.
Provide certification by a suitably qualified person with respect to any material proposed to
be retained on site for maintenance purposes, that is, clean fill.
Submit a revegetation plan for the area to be rehabilitated for Council approval and within a
further 90 days of the Council approval undertake the works required by the revegetation
plan.
The agreement reached at mediation is set out in Attachment 1, with the area to be rehabilitated
included as Attachment 2. Notably the area to be rehabilitated was only provided on 31 May
2019 with Noosa Airfield previously seeking to maintain an area clear of vegetation for a future
car park.
Page 4 of 20
Section 5
GENERAL COMMITTEE MEETING AGENDA 17 JUNE 2019
The area to be rehabilitated is generally reflective of the area cleared of vegetation, with this area
not previously being fully vegetated.
Notably as previously reported to Council in September 2018 “…the original town planning
consent for the use expired many years ago and that a subsequent rezoning approval in 1994 to
Special Facilities was never completed despite correspondence by Council at the time noting the
Council’s concerns in this regard.
The present use of the land for airfield purposes involving the landing and take-off of aircraft and
associated facilities being housing, servicing, maintenance and repair of aircraft is therefore
unlawful.”
While this land use issue has been brought to the attention of Noosa Airfield some time ago,
Noosa Airfield have not provided any response to this issue and declined to discuss the matter at
mediation. This outstanding issue will therefore be further progressed separately to this appeal
with Council’s solicitor given the owners stated intentions to construct a car park, the potential
significant impacts of the airfield with previous complaints received from residents about the site
being used as a helicopter training base and the sensitive environmental setting in which the
airfield is located.
It is therefore recommended that Council resolve the appeal on the basis of the Mediation
Agreement reached with Noosa Airfield by Council officers.
Previous Council Consideration
Ordinary Meeting Minutes, 20 September 2018, Item 6, Page 8
That Council note the report by the Manager Development Assessment to the Planning &
Environment Committee Meeting dated 11 September 2018 regarding Planning & Environment
Court Appeal No. 2881 of 2018 and agree to continue enforcement against Noosa Airfield to
address the current breaches of The Noosa Plan.
Finance & Risk
The total costs to date for the appeal against the Enforcement Notice have not been collated at
this stage but include preparation of material and submission to the court including full
statements from Council’s development assessment officers involved in the investigation.
Council’s planning solicitor for the matter advises the following “I strongly recommend that
Council accept the agreement which, I consider, is a very good outcome bearing in mind the
issues in dispute”. Were Council not to accept this agreement the matter is likely to proceed to
trial with no certainty for the likely outcome.
Consultation
External Consultation - Community & Stakeholder
Wakefield Sykes
Internal Consultation
Nil
Page 5 of 20
Section 6
GENERAL COMMITTEE MEETING AGENDA 17 JUNE 2019
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer Director Director
Executive Support Community Development Financial Services
Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
Executive Services x Environment & Sustainable Development Infrastructure Services
Director Director Director
Community Engagement Building & Plumbing Services Asset Management
Customer Service x Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 6 of 20
Section 7
GENERAL COMMITTEE MEETING AGENDA 17 JUNE 2019
ATTACHMENT 1
Page 7 of 20
GENERAL COMMITTEE MEETING AGENDA 17 JUNE 2019
ATTACHMENT 1
In the Planning and Environment Court No. 2881 of 2018
Held at: Brisbane
Between: NOOSA AIRFIELD PTY LTD Appellant
And: NOOSA SHIRE COUNCIL Respondent
MEDIATION AGREEMENT
The parties agree to resolve the appeal on the following basis:
1. The Appellant will remove:
(a) concrete and other builders waste from Location 1;
(b) concrete fill material and rubble adjacent to causeway in Location 2; and
(c) concrete and other builders waste in Location 3 and adjacent access way.
As shown on attached plan (Attachment A)
2. The Appellant will provide certification from a suitably qualified person that any material to be
retained on-site, for the purpose of the maintenance of the landing strip, is clean fill.
3. The Appellant will undertake the removal of fill (as per Point 1 above) and provide the
certification as per Point 2 within 90 days of this agreement. If the Appellant requires
additional time to complete the works due to circumstances beyond their control, it will
contact Council to seek an extension. Council will not unreasonably refuse to grant an
extension request.
4. By 4pm 26 April 2019, the Appellant will prepare and submit a dimensioned plan showing the
proposed vegetation rehabilitation areas and future car parking area in Location 3. This plan
does not imply any approval of the car parking area by the Council.
5. At the next available Council meeting, Council officers will recommend to Full Council that the
appeal be resolved on the basis of Points 1 to 4 above.
6. Subject to approval of the Full Council to the proposed works in Points 1 to 4 above, within:
a) 90 days of the Full Council approval, the Appellant will submit to Council for approval a
Revegetation Plan for Location 3 detailing the revegetation, species type and
maintenance regime. The maintenance regime being no less than 3 years. The Council
will not unreasonably withhold approval of the Revegetation Plan.
b) 90 days of the approval of the Revegetation Plan the Appellant will undertake the
works required by that Revegetation Plan.
Subject to Council approval in Point 5 above, the appeal will be dismissed and the parties agree to
bear their own costs.
Page 7 of 20Section 8
GENERAL COMMITTEE MEETING AGENDA 17 JUNE 2019
Page 8 of 20
GENERAL COMMITTEE MEETING AGENDA 17 JUNE 2019
el Do
Dated 23 April 2019
tn Ak %
Registrar ADR ~
7]
fis
A f; if o “Ay
Representative for the Appellant
7 for —igcoaae”
Page 8 of 20Section 9
GENERAL COMMITTEE MEETING AGENDA 17 JUNE 2019
Page 9 of 20
2.24 q)
S : rc
Local Ries ‘ LocetionZ Leceion 3 =
=
Vv v ¥ 4
| a a ee ae Seas Sr m
RELIG A Shih ie LO SCN ER AP RRS Mec ERO US OO SRDS eA NS ek feeb Sie rae Sc BUC ae aR, aad dae aap MERE RP. yy. be: SEN
epee) MATS ka SANDS > RU SL RANE NRL US a hc ERE Catia Mieco n Ge Sh Me eS Se. ee
Be Or Sanaa or i eaten ee NA CORRE NGS Mea ecreti ESCM a RRS eR MNCL Mato OM iting. RAM a ON mea =
Bea 7 aah te. PRPS a Singhs TER OR TED E at a WICRIN TES WG) Sera rR a SK Ny Oe ET tees
ie bf ’ sy sO yen See Re = Shas Le eal Bie Regn 9 be Saad fae tals fs Mette. 3 > Ta 7 7 m
| A OR i ae ole ae hE ian ba at Pig gee Me ed ee Ga A ae ape ae eae
i PN EN ee i ORE a ee ee a Sy Se 2 la m
Sore hametiayetS ~ Si So Re A ae ae ere 7 Ra ae 2 a ee as Be f —|
‘Go EE ay SERRE ck Se RN Ee RM kee Seamer RA ag in r =
aa Mi fet Fy Ceara) Pe eee , . ba En SR ta ar a =
x Tt ae COUR i AY Satan WE Re es a ES oe eT pas iS Nie ed ae
= Mage Cees nt Liat <P ha | Ph Le vanes A pe eae i$; Cn Se Q
ee Re vehi = al a dae ee ero Meet bo J J pote: ee ao eee e
a aS ; ao) dae “ad ft ee a4 a iS tee eee 5 :
agen ra ae > Mae a RO A eS Soa a aaa Nasa 2 . >
> ty re : re Mabe eR tic 4 Cetin Sia oe Rate Ft @ ee
Se o j y pe See a a ek. Meek bs Rag eRe y 2
nk Par Sete hie lye iii ee ER eK eo en) m
be ED AP ge A ee es ae de a ee z
ee a Be a ES) Sg RS IO Bia ey es OE he
eS 1 pt Ss pg, ee | NR | Bae Bees ior Crs ads sie AN 5 oO
ae: r he ea Py, Bin he FP ae Fan Pe Le z ee nen 2 See .
tite en? Seite. ONS hs ae ee ee a >
a a |. . “he a ry ey eked a ee i E ~
a a : PR. ee Fee erg, a ke
eg a atl ges Re ee Tay Py, Ekg En Seek Py, ales 7 Po
ey paises ss & wee F Sa SERN AL Ar ON . ;
a ce ; Re . Ls ‘ 5 fa tater ae
aa a8 ats ont ( os Ad vl Rot ee ,
“Cies p! 2 ips pase: aes Oss € ee SL ah ee as
Peis Fn ‘ Sec * | y SS i SP ke iar ees Fo ty oe “af pi ‘i
Be as a ote eal Pa Se ae i a “a )
Ora - ara, Lees on sim j AN i f intl | oa
SS gar ge a oS REY a pao Say ae
Die eee, ae i s. SE a e s Fs Pe eee Ps ai hong ode aR
OES PR at ba Ge i pM eS gM eae NS Ei 1
CNR Ses iy ae hah ed aa se ee ae he pie “ Re ne ee
Seg it nha, ae . es Lia pe Mages oe Ae £e bres)
a be Soa SS Gee, i Pik ae
be SNe es 5 ee ule Rat Mes 2 Mary EB oe
PENG tot gee sae oe ee ee
Ren a Ae Seed Ps : aa eS ARBRE
fab Te PAN Seg ea a cae ee SY og AeA a ee
Se ee Ag a ete. Rs Pa pe eerie} eM te
See So Oe <P Gr oe Ok Svea ES ne
hg RC ne hE eae aa ee ee. PF of Pe Fae er ak Hees
PAG eee Eye ae Be SS Drs, he on. = ee se a Beenie, “a
Mie wea oy Se? Ot Ve ENR gre Ee ia Borcastici: towel
: fg ee ie Gee SF oS ee se ye Meek
Bis Pee eee ee See See eee Ege ice oe ctl
—
> | ~
© | c
2 X Zz
co} m
°
=~ ow Document Set 1D; 20573602 Page 2-132 8
XN Version: 1, Version Date: 02/05/2018 * : —
oSection 10
ATTACHMENT 2
Page 10 of 20
| ATTACHMENT 2
I
|
||
|
, 19, [he clearing that has been undertaken on the subject site, Involving
; i
| clearing of just over half a hectare (5.225 sqm) :
eS F
ro
la® , nee " 4
1a rs
ILS e ps S ace” :
of: ir 7) az S| ‘ 3
: # f rf : % ret 2 ;
eo Le es : op
- ns w SS has * ¥ s .
ae by ae oe Fa
a ™ , fw op | SY Lal “8 » Fi. 2 |
~~ a a 4 ee Ber 100% of this area between
a 4 a , = a nee NAE South Eastern Boundary and |
: cs we te ‘ a oe bs spenecess carriageway (Approx 5225 sqm) ie
ae 2 re 2, ee S65 ees
, > 5 KC + y , a i : z
= eh y
po : A a z
ut lar = ere
» » ~ 4S aa <a y Pe Ps
ue 4 wx. om ach
re j 7 “ake Cae if n PY
. — . 4. Les f :
é 5 ar { vi ‘ *.
“4 a! Py a
* Note 1 - Paragraph 19 above , comes direct from affidavit 18.04.2019, Conor Patrick Neville (5,225 sq m).
‘om usin | Linke & Linke Surveys |
NOT'TOSGALE Checked S.oats eargen tas OREN TO-REVEGETALE REHABILITATION PLAN
am Horiz Datum MGA94 | Job No. noosacpk300519 Plot Date 30/5/2019 A Se iow aun nn
To —C(CsSSSOSSCSCSCSC‘C*zr Vertical Datum NA Surveyed by - Date Fax +612 91303278 ; Drawing No. [Rev
al Figvisae Contourinterval NA | Approvalfor issue S.Coates Date 30/5/2019. — Noosa Airfield = LUNAF/RVG/001 ‘A
Page 10 of 20Section 11
GENERAL COMMITTEE MEETING AGENDA 17 JUNE 2019
8 FINANCIAL PERFORMANCE REPORT - MAY 2019
DOCUMENT INFORM AT ION
Author Manager Financial Services, Trent Grauf
Corporate Services Department
Index ECM/ Subject/ 22.09 – Monthly Financial Performance Report
Attachments 1. Statement of Income and Expenditure (Profit & Loss and Capital)
2. Statement of Financial Position
3. Statement of Cash Flows
EXECUTIVE SUMMARY
Overall year to date operating financial performance to May 2019 is positive, with operating
revenue continuing to track above budget and operating expenditure below budget. Capital
expenditure is tracking slightly below budget, with capital revenue above target.
YTD Financial Performance Summary
Budget Actual Variance Variance Status
$m $m $m %
Operating Revenue $93.8 $95.4 $1.6 1.7% On Track
Operating Expense $83.5 $82.3 $1.2 1.5% On Track
Operating Position $10.3 $13.1 $2.8 27.7%
Capital Revenue $5.2 $7.9 $2.6 50.1% Above Budget
Capital Expenditure* $24.4 $22.7 $1.7 7.0% Below Budget
* Reflects constructed assets and intangibles only (excludes contributed)
Financial statements including Statement of Operating Profit & Loss, Summary of Capital
Financial Performance, Statement of Financial Position (balance sheet) and Statement of Cash
Flows are included as attachments for information of Council.
Figure 1: Actual Performance Compared to Budget
$120
YTD Budget ($m)
$100 YTD Actual ($m)
$80
$60
$40
$20
$-
Operating Revenue Operating Expenditure
Page 11 of 20
Section 12
GENERAL COMMITTEE MEETING AGENDA 17 JUNE 2019
RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 17 June 2019 outlining May 2019 year to date financial performance against
budget.
REPORT
Operating Revenue (YTD Benchmark 92%)
Council has received 100% ($95.4 million) of its operating revenue budget ($95.1 million).
Commentary on each revenue category is provided below.
Category Summary Comments
Rates and $66.5 million (102%) of the Overall, rates and levies earned are in line with
Levies annual budget of $65.2 YTD budget.
million has been earned
Fees and $6.8 million (106%) of the Development related fees $393k above YTD
Charges $6.3 million annual budget budget (122% or $1.6 million of $1.4 million
has been earned budget earned) – offset by additional salary and
development appeal legal costs above YTD
budget
Building and plumbing application/ search fees
$104k above YTD budget (100% or $1.8 million of
$1.8 million budget earned)
Waste temporary bin collection services $53k
above YTD budget (458% or $66k of $14k budget
earned)
Community land use permits $65k above YTD
budget (117% or $438k of $375k budget earned)
Local laws fees $101k above YTD budget (103%
or $1.4 million of $1.3 million budget earned)
Waste management temporary bin services $55k
above YTD budget (306% or $75k of $25k budget
earned)
Sale of Goods $8.9 million (96%) of the $9.3 Eumundi Road landfill disposal charges and
and Services million budget has been recyclable sales $227k above YTD budget (100%
received or $3.0 million of $3.0 million budget earned)
Holiday parks $39k above YTD budget (87% or
$2.9 million of $3.1 million budget earned) – offset
by additional operating costs and commission
Noosa Leisure Centre $58k above YTD budget
(102% or $549K of $536k budget earned)
Interest $4.6 million (99%) of the $4.6 Investment revenue $172k above YTD budget
Received million annual budget has (96% or $1.6 million of $1.7 million budget earned)
been earned Interest on overdue rates and charges $43k above
YTD budget (102% or $468k of $458k budget
earned)
Dividend and On track Nil
Tax
Other $2.3 million (106%) of the Works Operations internal plant hire recoveries
Revenue $2.2 million budget has been $510k above YTD budget (188% or $1.0M of
earned $540k budget earned) – offset by internal hire
charges
Page 12 of 20
Section 13
GENERAL COMMITTEE MEETING AGENDA 17 JUNE 2019
Category Summary Comments
Waste Management internal recoveries for landfill
disposal $54k above YTD budget (362% or $72k
of $20k budget earned)
Local Laws SPER penalty recoveries $24k above
YTD budget (109% or $166k of $152k budget
earned)
Operating $4.1 million (99%) of the $4.2 Operating grants are in line with budget
Grants, million budget has been expectations at this stage.
Subsidies received
Figure 2: Operating Revenue Position by Type (Excluding Rates)
$10.0
YTD Budget ($m)
$9.0
YTD Actual ($m)
$8.0
$7.0
$6.0
$5.0
$4.0
$3.0
$2.0
$1.0
$0.0
Income
Other
Charges
Grants
Goods &
Dividend
Services
Sales of
Rental
Interest
Fees &
& Tax
Operating Expenditure (YTD Benchmark 92%)
Actual operating expenditure is currently 88% ($82.3 million) of full year budget ($93.7 million).
Detailed commentary for each expenditure category is provided below.
Category Summary Comments
Employee $27.7 million (86%) of the Under expenditure for permanent staff salaries and
Costs annual budget of $32.1 wages ($2.4 million) partially offset by casual staff,
million has been expended external labour hire ($932k), sick / other leave
($611), allowances, overtime and penalty rates
($178k).
Staff training underspend of $38k YTD (noting that
a further $55k is committed to suppliers for future
training)
Materials and $34.6 million (82%) of the Waste management contract services $249k below
Services $42.3 million annual budget YTD budget (87% or $7.1 million of $8.1 million
has been expended. budget spent) – waste collection and landfill
operation
Fleet costs for fuel and tyres $158k below YTD
budget (68% or $447k of $660k budget spent)
Maintenance of Council buildings and amenities
$131k below YTD budget due to timing of
scheduled work (71% or $594k of $836k budget
spent)
Page 13 of 20
Section 14
GENERAL COMMITTEE MEETING AGENDA 17 JUNE 2019
Category Summary Comments
Community Development grants $73k below
budget due to timing of grant allocations (88% or
$864k of $984k budget spent)
Cemetery operations $61k below YTD budget
(57% or $100k of $177k budget spent)
Environmental Health costs for vector control $50k
below YTD (61% or $79k of $128k budget spent)
Maintenance of Council leased properties $48k
below YTD budget (77% or $1.6 million of $2.1
million budget spent) – relating to the timing of
community building refurbishment works
Holiday Parks operating costs and commissions
$60k above YTD budget (98% or $1.3M of $1.3M
budget spent) – offset by additional revenue
Noosa Community Support programs $77k above
YTD budget (104% or $667k of $666k budget
spent)
Development assessment legal appeals costs
$169k above YTD budget (102% or $1.0M of
$878k budget spent)
Finance Costs On track Nil
Depreciation On track Nil
Other On track Nil
Expenses
Figure 3: Operating Expenditure Position by Type
$40
YTD Budget ($m)
$35
YTD Actual ($m)
$30
$25
$20
$15
$10
$5
$0
Materials
Finance Costs
Depreciation
Employees
Other
Capital Revenue
YTD capital revenue of $7.9 million received comprises cash contributions from developers ($2.1
million), capital grants ($2.7 million) and contributed assets ($3.1 million). Note that the timing of
capital grant receipts are generally dependent on the timing of grant conditions and also capital
delivery performance, and that the timing of the receipt of developer contributions (both cash and
contributed) is unpredictable.
Page 14 of 20
Section 15
GENERAL COMMITTEE MEETING AGENDA 17 JUNE 2019
Figure 4: Capital Revenue by Type
$3.5
YTD Budget ($m)
$3.0 YTD Actual ($m)
$2.5
$2.0
$1.5
$1.0
$0.5
$0.0
Subsidies
Contributions
Contributed
Grants /
Assets
Cash
Capital Expenditure Program
Actual capital expenditure (excluding commitments) is $22.7 million (YTD budget $24.4 million).
Detailed discussion of progress in the delivery of the capital works program is provided via a
separate report by the Infrastructure Services Department.
Figure 5: Capital Program Delivery Performance
$25.0
YTD Budget ($m)
YTD Actual ($m)
$20.0
$15.0
$10.0
$5.0
$0.0
Capital works Other capital
Cash Management and Investment Performance
Total cash on hand at the end of May 2019 was $68.0 million. Included in this balance are funds
held in trust and for restricted purposes (e.g. unexpended levy and grant funds) and monies
committed for funding capital projects during the year. The cash balance will progressively
reduce over the next quarter, aligning to budget forecasts by year end, as operational and capital
expenditure outstrips expected revenue.
Page 15 of 20
Section 16
GENERAL COMMITTEE MEETING AGENDA 17 JUNE 2019
The pie charts following present the mix of cash held at May 2019 by agency (graph on the left)
and by credit risk rating (graph on the right). All funds have been invested in accordance with the
Investment Policy and in consideration of the principles of ethical investment, preservation of
capital, return on investment and counterparty thresholds.
Figure 6: Closing Cash Held by Agency and Credit Rating
Bendigo A3
Suncorp 6% (Bendigo)
A1
3% 6%
(Suncorp)
NAB
3%
9%
A1 +
CBA (CBA + NAB +
9% Wpac)…
A1 +
(QTC)
73%
QTC
73%
The following chart monitors the year-to-date trend on total cash and the agencies invested.
During May, $2 million was drawn down from deposit with QTC and was utilised to fund operating
and capital expenditure requirements. All other investments were stable as sufficient working
cash was available to fund Council’s requirements for the month.
Figure 7: Year to Date Trend of Cash Invested by Agency
90,000,000
80,000,000
70,000,000
60,000,000
50,000,000
40,000,000
30,000,000
20,000,000
10,000,000
-
Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19
Bendigo TD Westpac TD NAB TD Suncorp TD CBA TD QTC CBA Operating
Council has also adopted, at the Ordinary Meeting on 16 May 2019, to undertake an early loan
repayment on 28 June 2019 to reduce old loan borrowings by $10 million. This repayment will
also reduce closing cash balances, and is not reflected in the budget and attached financial
statements.
Page 16 of 20
Section 17
GENERAL COMMITTEE MEETING AGENDA 17 JUNE 2019
Actual interest revenue for May was $151k with a weighted average yield of 2.6%, which reflects
a positive return compared to the industry benchmark (Bloomberg AusBond Bank Bill Index) of
2.0%.
Previous Council Consideration
Nil.
Finance
As above.
Risks & Opportunities
Council’s risk register includes a number of risks that could impact on ongoing financial
sustainability. Effective budget management and reporting is an important risk mitigation tool.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.
Departments/Sections Consulted:
x Chief Executive Officer x Community Services X Corporate Services
Executive Officer Director x Director
Executive Support Community Development x Financial Services
Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
x Executive Services x Environment & Sustainable Development x Infrastructure Services
Director Director Director
Community Engagement Building & Plumbing Services Asset Management
Customer Service Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 17 of 20
Section 18
Page 18 of 20
Noosa Council ATTACHMENT 1
Statement of Income and Expenditure
For the Year Ended 30 June 2019
As at 31 May 2019
Current Current
Budget Budget Actual Variance Annual
2019 YTD YTD YTD Budget
($'000) ($000) ($'000) ($'000) %
Profit and Loss Statement
Revenue
Recurrent Revenue
Rates, levies and charges 65,251 66,470 66,454 (16) 102%
Fees and charges 6,391 5,997 6,757 760 106%
Dividend income 1,600 669 669 - 42%
Interest received 4,642 4,394 4,610 215 99%
Tax equivalents 1,450 1,450 1,441 (9) 99%
Sale of Goods and major services 9,316 8,550 8,914 364 96%
Sale of contract and recoverable works 23 - 3 3 14%
Rental & lease income 1,292 1,209 1,225 16 95%
Other income 924 842 1,124 282 122%
Grants, subsidies, contributions and donations 4,235 4,187 4,185 (3) 99%
95,123 93,769 95,382 1,613 100%
Expenses
Recurrent Expenses
Employee benefits 32,106 28,131 27,737 (394) 86%
Materials and services 42,290 35,446 34,590 (856) 82%
Finance costs 2,309 2,109 2,082 (27) 90%
Depreciation and amortisation 16,864 17,659 17,672 13 105%
Other expenses 154 147 172 25 112%
93,723 83,492 82,254 (1,238) 88%
Operating Result 1,400 10,277 13,128 2,851
Summary of Capital Revenue and Expenditure
Capital Revenue
Capital contributions and donations 4,043 3,599 5,212 1,613 129%
Grants, subsidies, contributions and donations 3,375 2,513 2,695 182 80%
Other capital revenue - - - -
Total Capital Revenue 7,419 6,111 7,907 1,796
Capital Expenditure
Contributed assets 2,000 2,000 3,072 1,072 154%
Constructed assets 28,391 24,413 22,697 (1,716) 80%
Other capital expenses - - 2,324 2,324
Total Capital Expenditure 30,391 26,413 28,093 1,680
Page 18 of 20Section 19
Page 19 of 20
Noosa Council ATTACHMENT 2
Statement of Financial Position
For the Year Ended 30 June 2019
As at 31 May 2019
Current Actual Actual
Budget YTD Full Year
2019 2019 2018
($000) ($000) ($000)
Current Assets
Cash and cash equivalents 53,496 68,002 64,193
Trade and other receivables 8,795 6,929 6,979
Inventories 330 219 225
Other current assets 490 3,860 4,115
63,111 79,010 75,512
Non Current Assets held for sale - - -
Total Current Assets 63,111 79,010 75,512
Non Current Assets
Trade and other receivables 54,025 49,218 49,218
Other non current Assets - - -
Investments 73,332 60,978 60,978
Investment property 4,405 4,167 4,167
Property, plant and equipment 895,127 871,459 866,604
Intangible assets 7,027 5,648 5,048
Total Non Current Assets 1,033,916 991,470 986,014
Total Assets 1,097,027 1,070,481 1,061,526
Current Liabilities
Trade and other payables 4,747 4,916 11,679
Borrowings 3,621 475 3,969
Provisions 4,061 4,998 4,648
Other 665 727 697
Total Current Liabilities 13,094 11,115 20,993
Non Current Liabilities
Trade and other payables - - -
Borrowings 31,674 32,171 32,171
Provisions 10,686 9,858 9,738
Total Non Current Liabilities 42,360 42,029 41,909
Total Liabilities 55,454 53,145 62,902
Net Community Assets 1,041,573 1,017,336 998,624
Community Equity
Asset Revaluation Surplus 58,039 41,740 41,740
Retained Surplus / (Defeciency) - - -
Shire Capital 983,534 956,885 961,335
Current Year Net Earnings - 18,712 (4,450)
Total Community Equity 1,041,573 1,017,336 998,624
Page 19 of 20Section 20
Page 20 of 20
Noosa Council ATTACHMENT 3
Statement of Cash Flows
For the Year Ended 30 June 2019
As at 31 May 2019
Current Budget Actual Actual
2019 2019 2018
($'000) ($'000) ($'000)
Cash flows from operating activities
Cash Flows from Operating Activities
Receipts from Customers 81,990 87,511 87,075
Payments to Suppliers and Employees (81,752) (72,615) (77,033)
238 14,896 10,042
Receipts:
Investment and Interest Revenue Received 4,641 4,610 4,701
Rental Income 1,293 1,225 1,301
Non Capital Grants and Contributions 4,286 4,185 6,052
Income Tax Equivalent Received 1,200 1,441 3,067
Income from Equity Investments 1,850 669 30
Payments:
Borrowing Costs - - -
Interest Expense (355) (287) (131)
Net Cash Inflow/(Outflow) from Operating Activities 13,152 26,739 25,062
Cash Flows from Investing Activities
Receipts:
Proceeds of Sale of Property, Plant and Equipment (32) 375 154
Grants, Subsidies, Contributions and Donations 5,419 7,907 6,369
Payments:
Payments of Property, Plant and Equipment (26,026) (24,880) (26,981)
Payments for Intangible Assets (2,365) (1,042) (1,874)
Net Cash Inflow/(Outflow) from Investing Activities (23,004) (17,640) (22,332)
Cash Flows from Financing Activities
Receipts:
Proceeds from Borrowings 2,475 - 1,165
Payments:
Repayment of Borrowings (3,320) (5,289) (5,165)
Net Cash Inflow/(Outflow) from Financing Activities (845) (5,289) (4,000)
Net Increase/(Decrease) in Cash and Cash Equivalents held (10,697) 3,809 (1,270)
Cash and Cash Equivalents at the beginning of the reporting period 64,193 64,193 65,463
Cash and Cash Equivalents at the end of the reporting period 53,496 68,002 64,193
Page 20 of 20