Original source · versioned page text
11. Transport Code
External Works and Infrastructure Table 9.4.7.3 Criteria for assessable development (part)
Performance outcomes Acceptable Outcomes
External Works and Infrastructure
PO14 AO14 Complies.
Development is provided with external works— Where not already existing, the following The David Low Way frontage is fully
infrastructure components are provided constructed. The infrastructure
1. along the full extent of the frontage of the site at the frontage of the site— components outlined in the acceptable
to an appropriate standard having regard to outcomes will be provided to the
the specified function of the road; and 1. full width sealed road; development where not already existing
2. provided beyond the site’s frontage if required. 2. concrete kerb and channel (e.g. the proposed 1.8m wide footpath).
where appropriate; Refer to the Engineering Report in
3. forming and grading to footpaths; Appendix E.
4. vehicular kerb and footpath
crossings;
5. a constructed bikeway;
6. a constructed footpath;
7. a constructed carriageway;
8. required alterations to public
utility mains, services or
installations;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.