Original source · versioned page text
2019-08-12 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 49 of 68
Upgrade, New and Expansion Projects
Item Description Grants Selma le) AY Ta ea General Rates ae)
Cemeteries Cooroy Cemetery Plant & Equipment Shed $60,000 $60,000
Commercial Land & Property Peregian Beach 5 Rufous St Redevelopment Stage 3 Construction $1,613,636 $1,759,109 $3,372,746
Holiday Parks Noosa North Shore Beachfront Campground Redevelopment $2,456,544 $2,456,544
Parks & Playgrounds Cooran Pioneer Park Facilities Upgrade $65,000 $65,000
Parks & Playgrounds Cooroy Hinterland Playground $836,631 -$515,104 $321,527
Parks & Playgrounds Lake Macdonald Botanic Garden Shade House $200,000 $167,602 $367,602
Parks & Playgrounds Peregian Beach Town Square Upgrade Planning & Design $13,890 $13,890
Pathways & Boardwalks Noosaville Sea Eagle Drive & Shire Drive Pathway Upgrades $54,000 $120,000 $174,000
Pathways & Boardwalks Tewantin, Hilton Terrace CNLGGP Shared Pathway $18,074 $18,074
Sealed Roads Network Boreen Point Tewah St Gravel Road Seal $250,000 $250,000
Sealed Roads Network Boreen Point, Hector Street Road widening and K&C $97,000 $97,000
Sealed Roads Network Pomona, Ambulance Street Sealing of Gravel Section $200,000 $200,000
Stormwater Drainage Noosaville Project Ave Stormwater Drainage Easement Upgrade $250,000 $250,000
Transport and Infrastructure Management Beckman's Road Interchange Upgrade $50,000 $50,000
Transport and Infrastructure Management Transport Strategy, Walking & Cycling Strategy and CNLG Grant Applications $100,000 $200,000 $350,000 $650,000
Waste Management Eumundi Rd Landfill Recyclables Sales Shed & Education Room $45,000 $45,000
Waste Management Noosa Heads "The Woods" Bin Storage Enclosure $100,000 $100,000
Waste Management Noosaville Eumundi Rd Transfer Station Sealing of Gravel Road $135,000 $135,000
Waste Management Noosaville Eumundi Road Landfill Design Stormwater Controls for Cell 2.3 $228,020 $228,020
Asset Management Asset Management Systems Implementation $250,000 $250,000
Information Technology Technology One Cl Anywhere Systems Implementation $906,717 $906,717
Planning Scheme Climate Change Adaptation Plan Develoment and Implementation $415,500 -$163,195 $252,305
Planning Scheme Noosa River Hydraulic Model $34,910 $34,910
Planning Scheme Shire Planning Scheme Consultancy $136,142 $136,142
Planning Scheme Shire Project Place Based Approach - Placemaking Pilot Program $100,000 $100,000
Planning Scheme Shire Project Team Materials & Services $46,952 $46,952
Planning Scheme Shire Project Team Resources for New Planning Scheme $581,048 $581,048
Planning Scheme Stormwater Backflow Climate Change Vulnerability Assessment $5,287 $5,287
Page 49 of 68See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.