Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2022-08-15 General Committee Meeting Agenda

of 122

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (21.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                              15 AUGUST 2022


•   Construction of the new Peregian Beach Community House and Greenspace was
    completed. Work is underway on the next stage of the development of this precinct with the
    refurbishment of the old Community House as an extension of the Peregian Digital Hub.


                                       Work has commenced on a new Noosa Council Waste
                                       Strategy to plan for long-term sustainable waste
                                       management, increase diversion of resources from
                                       landfill and reduce carbon emissions. In the meantime,
                                       Council staff are introducing new ways to help re-use and
                                       recycle with our first "Give a Sheet" drive to collect
                                       unwanted sheets, household linen and clothing.




     Image 6 – Give a Sheet

    Infrastructure:

•   Completed construction of the world class Cooroy/Hinterland All Abilities Adventure
    Playground after weathering the catastrophic flood events in February. The playground has
    proved to be a huge attraction and has benefitted Cooroy traders and the profile of the town.




                                 Image 7 – Cooroy Adventure Playground

•   The shade sail for the Sunshine Beach skate park was erected and the new vert ramp is in
    the final stages of construction and delivery.
•   The Kin Kin Recreation Hall has been successfully refurbished and handed back to the
    community for their use.


                                                                               Page 112 of 122
Log in to download the original file

2022-08-15 General Committee Meeting Agenda(PDF, 20MB).pdf · 21.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.