Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2022-08-15 General Committee Meeting Agenda

of 122

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (21.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   15 AUGUST 2022




                                    Page 48 of 122

GENERAL COMMITTEE MEETING AGENDA                                                                                            15 AUGUST 2022

               Attachment 3

                 NOOSA COUNCIL
               2022/23 Capital Program - New & Upgrade Works
              Row Labels                      Description                                                                           rants | Ext Funds |     Loans[      Levies| Reserves | GeneralRates]          Total
              Cecio                                                                                                              SCRA                        EREr)       Sie         $16,087     ST REE        Le Gk
             |_Cemetenes 0                    [Cooroy Cemetery Plant & Equipment Shed                                                                                                            $136,656]     $136,656)
             |_Coastal Canals and Waterways   [NoosaHeads Dog Beach SEMP                                                                                                                        $1044, 927    $1,044,927
             |_Coastal Canals and Waterways   [Noosa Heads Main Beach Removable Sand Break Seating Structure                                                                 ST                                 $70,266 |
             |_Coastal Canals and Waterways   [Noosa Heads Main Beach Shower & Rock Wall Seating Improvements |                                                                                   858.690]      $58,690]
             |_Coastal Canals and Waterways   [Noosa Heads Main Beach Western End Rock Wall 1/1                                                                                                    87, 000F     $87,000]
             [_Community Facilities           [Living Fire Tech Lab Upgrade -DisasterRecCatD                                           ORT                                                       87S952]      $1,660,860)
              |_ Community Facilities         [Noosa Heads Surfboard Lockers/Shelters Design and Construct                                                                                        $30,000       $30,000]
             [_Community Facilities           [Noosa Leisure Centre Bathroom & CCTV Upgrade                                        695 COOP                                                                    $6 95,000]
              [|_Community Facilities |       |NoosaLeisure CentreNeeds Assessment                                                                                                                815 8,0C0T   $180,000)
              [|_Community Facilities         [Noosa Leisure Centre Stadium FloorRefurbisnment |                                                                                                   850.000T     $50,000 |
             [_Community Facilities           [Noosa World Surfing Signage                                                                                                                        820.6457      $20,645]
             [_Community Facilities |          Peregian Beach Rufous St Public Art |                                                                                                              849864        $49,864
             [_Community Facilities            Rufous St- Stage 3 Community House, CarPark &Landscape                         4202600897 OBT                                                                   $722,567
            | Corporate Buildings             [Noosa Shire Building CCTV Programm 00                                                                                                             $500,000]     $300,000]
             |_Corporate Buildings            [Tewantin Administration Building Masterplan |                                                                                                      $65,000F      $65,000]
            [Holiday Parks                     Boren Point Campground Installation of New Boom Gate                                                                                               888,500f      $38,500]
            [Holiday Parks                   YB oreen Point Campground Installation of Office and Reception Space                                                                                 892.0007      $92,000 |
            [Holiday Parks                    Noosa North Shore Campground - Installation oflandscaping bays                                                                                        86.0507      $6,050]
            [Libraries & Gallenes            [Cooroy LibraryNew Outdoor Shade Structure                                                                                                           8120,000F    $120,000
            [Libraries & Gallenes             [Noosaville GalleryFeasibilty Study |                                                                                                              897 SOT       $191,650
             | Parks & Playgrounds            [Cooroy Hinterland Playground 0                                                                                                                    sg 4oT        $119,140]
            [Parks & Playgrounds              [Lake Cooroibah Foreshore                                                                                                                        FSB              $43,363]
             | Parks & Playgrounds             Sunshine Beach Ed Webb Park Upgrade =LGIP                              ge                                                                          8250,000F    $260,000)
             | Parks & Playgrounds            [Tewantin Sundial Park BMX Track Upgrade |                                          1 BOO                                                            $50,000]    $178,800]
             | Pathways &Boardwalks           [Cooroy Maple Street Pathway Overlander Avenue to Bruce HWY Overpass New            $170,000                                                        812 64ST      $97,355
             |_ Pathways &Boardwalks         [Cooroy Tewantin Rd, Miva StMissing Pathway Link Expansion                             TOO                                                            83982        $77,018]
             |_ Pathways &Boardwalks          [Noosa Heads Precinct West end Sofitel Boardwalk ||                                                                                                FOG GAT       $100,194]
            | Pathways &Boardwalks            [Noosa Hinterland Trail 5 upgrade (Pomona Section)                                    er S08                                           97 508]     $548,633    $1,378,633]
             |_ Pathways &Boardwalks          [Noosa Hinterland Trails Condition Assessment and Pnontisation (Post Masterplan) PE $700,0G0F                                                                    $100,000]
             |_ Pathways &Boardwalks          [Noosaville Koel and Wylah Street Pathway Link Planning & Construction          O89
             |_ Pathways &Boardwalks |        [Peregian Beach Plover Street Pathway Piper Streetto Jacana StreetNew                     OP                                                                           80
             | Pathways & Boardwalks          [Pomona Memorial Avenue Missing Pathway LinkExpansion 1                                                                                             842 0007      $42,000]
             |_ Pathways &Boardwalks          [Pomona Stan Topper Park Pathway Link New |                                              OO                                                              AT       $23,464
             |_Pathways &Boardwalks           [Shire Information Signage Audit and Design 0                                                                                                        850.000T     $80,000 |
             |_ Pathways &Boardwalks          [Sunshine Beach Corona Street Pathway #4 Corona Streetto Ray Street New 1                                                                            69,7507      $69,750]
             |_ Pathways &Boardwalks         _[Tewantin Blakesley Street Pathway Diyan Street to Sidoni Street New 1                                                                              $54.000f      $84,000]
             |_ Pathways &Boardwalks        _[Tewantin Butler Street & Crank Street Footpath & Ghostgum Crt in |                                                                                  8100,0C0T    $100,000]
            | Pathways &Boardwalks            [Tewantin Fumess Drive Bus Stop PathwayDDA Access                                     825.000                                                             TT      $23,243]
              |_ Pathways &Boardwalks         [Tewantin Goodchap Street Pathway Linkage Planning and Construction                  $25 000                                                        827 CRT       $46,009]
             |_ Pathways &Boardwalks        _[Tewantin Moorindil Street Pathway Poinciana Avenue toToolarStreet(7/m) |                                                                            $25,.000F     $28,000]
             |_ Pathways & Boardwalks         [Tewantin Poinciana Memonal Park Pathway Upgrade                                         OO                                                                      $180,000
             | Pathways &Boardwalks           [Trails Master Plan and implementation Plan |                                                                                                       $3144 T       $31,494]
              |_Public Transport Infrastructure [Cooroy Centre -Transit Hub Investigations                                          84 OO                                                         856,000]     $140,000)
              |_Public Transport Infrastructure [Noosa Civic-TransitHub Investigations                                              hoo                                                            $56,000f    $140,000
             |_Sealed Roads Network           [Tewantin Beckmans Road Bypass Stage 1                                                            car Soop                                         882.687]     $4,764,813]
             |_Sports Ground and Facilities   [Cooroy Sports Complex - Prelim/Concept design shared clubhouse and gymnastics facility ||P                                                         84ST          $47,088]
             |_Sports Ground and Facilities   INDSC-- Construction Internal LinkRoad and Pathway Network |||                                                                                      $500,000F    $500,000]
             |_Sports Ground and Facilities   [NDSC- Stage 1 McKinnon Drive Community Sports Facility ||                          $390, 000f  S100,000f                                          $260,000]     $750,000)
             | Sports Ground and Facilities   INDSC- Stage 2 Mckinnon Drive Community Sports Facility |||                         §248.900f                                                       248.9007     $497,800]
             |_Sports Ground and Facilities   [Tewantin ReGen Wellbeing and Community Hub Feasability Study |                                                                                     889,163       $89,163]
             |_Stormwater Drainage            [Noosaville Project Avenue Stormwater Drainage Easement Upgrade                                                                                   848.825        $148,825
             |__Streetscapes and Road Corridors [Noosa River Foreshore Masterplan including Thomas Street_                         100,000                                                        $250,007     $350,000)
             |_Streetscapes and Road Corridors [Noosa Junction streetscape -Stage 1A Masterplan                                                                                                   $36,608]      $36,608]
             |__Transport and Infrastructure ManagemeiNoosa Heads Noosa Drive Halse Laneto Sunshine BeachRd-Design                  I OOOP                                                       8874004       $487,004]
                                                                                                                               Page 48 of 122
Log in to download the original file

2022-08-15 General Committee Meeting Agenda(PDF, 20MB).pdf · 21.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.