Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2022-08-15 General Committee Meeting Agenda

of 122

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (21.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   15 AUGUST 2022




                                    Page 51 of 122

GENERAL COMMITTEE MEETING AGENDA                                                                       15 AUGUST 2022

     RowlabelsSSSCSC~C~“‘~*SCSCSD@SCptIONCOCSCSCSC‘;3SSTTTCCCCC*dYSCCS rants [Ext Funds                                                      Loans[      Levies[  Reserves[ GeneralRates[ —Totall
     [| Streetscapes and Road Coridors [Noosa Heads Noosa Parade Comdor Upgrade                                      $557 SOO]                                                  311703]     $5,669,205
     [| StreetscapesandRoadcomdors  [Noosa Parade Upgrade Stage2-Desin                                        i      150,000                                                                  5180,000
   [Transport and Infrastructure ManagemeNoosa Heads, Noosa Woods Jelly Upgrade Investigations                                    TTC    TCC                Cd           CdS _C« 100,000]     $100,000
   [Transport and Infrastructure Managemeysnire Entry signage Planningibesign andFutureRenewals                                   TC              Cd         Cd           C*dY—_—s« 7.000      $57,000
   [Transport and Infrastructure Managemeyshire Forward Planning & Design Program ConstuctionReadyDesigns                         TC          TCU           Cd           CS    «5 10,000]     $510,000
   [Waste Management__————((MasterplanLandil SW Contos &Design                                                         TCU       TTC           Cd        CC~dYSCSCS                            562,582 |
   [Waste Management__———_—‘|Noosaville Eumundi Road Landfill Cell Capping and Expansion (CelsTtand22)          TT                    Cd        0082054, 03g                                96 389,035
   [Waste Management_——————=((Noosaville Eumundi RoadLandill OutboundWeighbndge                                       TC           TCC          Cd         CC~dYSCCSS                         9286 422
                                                                                                                Fe e”*E                                                                “>=
      Other Capital                                                                                                                                                             RRO}        EXR LTR}
     [_AssetManagement_             [Annual Level 3 Bridge & Structure Inspections 22/23 to 24/25 Program                                                                        $153,000]    $185,000]
   [AssetManagement                —ifnire CCTV DramageProgram                                                          Cd         Cd          Cd CCS                           «880,000      $750,000
   [AssetManagement_              =f rire Road Infrastructure Asset DataManagement& CondtionProgram          OT          UT        TCC        TTC           Cd          CSC _—«éS 130, 000[   $180,000
     [ Fleet-PlantReplacement ___—_—‘[Council Fleet andPlant Replacement Program                                  CTC                          Cd          CSC         CCSdYYSC_=s«i 207.504 95,207,594
                                                                                                                >
      Grand Total                                                                                            [$7,705,212]       $790,000| $5,516,000]   $126,000] $2.373,007[  $20,412,316] $36,920,535

                                                                                                          Page 51 of 122
Log in to download the original file

2022-08-15 General Committee Meeting Agenda(PDF, 20MB).pdf · 21.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.