Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Traffic Report - responses 11 to 16

of 68

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Traffic
Traffic surveys coordinated by BMC Traffic at Luther Heights Youth Camp recorded the following trip
generation rates:
         AM peak hour traffic generation:        0.045 trips / bed (50%in / 50% out).
         PM peak hour traffic generation:        0.012 trips / bed (50%in / 50% out).
Application of these rates to the proposed 299 bed facility estimates:
         AM road network peak hour:     14 trips / hour.
         PM road network peak hour:     4 trips / hour.
This private vehicle trip generation is expected to be primarily associated with staff use.
The first principles assessment which assumes 38 trips for staff is therefore considered conservative, if
anything, overstating the traffic impacts.




www.bmctraffic.com.au                                                                                       10
BMC22089: 59 Kabi Road, Cootharaba
22 March 2023
Log in to download the original file

Traffic Report - responses 11 to 16 .pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.