3018AppendixC

Attached to the e-mail RAL21/0018 - Information Request Response - 130 Lake Macdonald Drive Cooroy (Email 3 of 3).

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                    APPENDIX C

Geotechnical Report of Proposed Lot 12 prepared by Arcos

                    (Project: 211222)


[OCR of page images]
APPENDIX C

Geotechnical Report of Proposed Lot 12 prepared by Arcos

(Project: 211222)
Log in to download the original file

3018AppendixC.pdf · 15.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 33 pages

Page 2

                                                                                                               51 640 311 842
                                                                                                                   CONTACT
                                                                                                  [email protected]
                                                                                                           arcosgroup.com.au
                                                                                                                     OFFICES
                                                                                       Sunshine Coast | Brisbane | Gold Coast




 Lyndal Petersen                                                                                 09 Dec 2021
 By Email                                                                                Letter 02 Revision 0
                                                                                       Arcos Project: 211222


Report on Geotechnical Investigation
Proposed Subdivision and Residence
Proposed Lot 12 (#130) Lake Macdonald Drive, Cooroy

At the request of Lyndal Petersen, Arcos Unit Group Pty Ltd (AG) undertook a geotechnical
investigation for the above project. The summary of the investigation and subsequent analysis
is detailed in Table 1. The value presented in Table 1 is condition upon the recommendations
within this report being implemented and is described in accordance with the Australian
Geomechanics Society “Guidelines for Landslide Risk Management”.


Table 1: Summary of Investigation Results

                               Result of AGS Slope Instability Assessment

                                                       Low
Notes:   The above is a summary of the detailed investigation results discussed within this report. The entire report
                               Error! No document variable supplied.
must be read, understood, and kept in entirety.




Senior Geotechnical Engineer




Andre Dos Santos B.Eng(Civ), CPEng, RPEQ, NER, MIEAust

09 Dec 2021                                                               Proposed Subdivision and Residence

Page 3

                                                                                                  51 640 311 842
                                                                                                      CONTACT
                                                                                     [email protected]
                                                                                              arcosgroup.com.au
                                                                                                        OFFICES
                                                                          Sunshine Coast | Brisbane | Gold Coast




1.0 Introduction
Arcos Unit Group Pty Ltd (AG) was commissioned to undertake a geotechnical investigation
for the Proposed Subdivision and Residence located at Proposed Lot 12 (#130) Lake
Macdonald Drive, Cooroy.


This report outlines the results of the investigation, laboratory testing, analysis and interpretive
reporting on the following items:
• Review of the existing slope stability hazards, their attributed risks and impacts of the
   proposed development in alignment with the practices set out within the Australian
   Geomechanics Society guidelines; and,
• Provide recommendations from a geotechnical context that will avoid or reduce any
   potential instability.

This report must be kept in entirety. The use of this report is undertaken in accordance with
our Company’s terms and conditions.


2.0 Regional Geology
The site is an area underlain by the Middle Triassic aged Kin Kin beds, which typically
comprises “strongly cleaved and commonly kinked mudstone with thin siltstone laminae;
minor volcanilithic sandstone”. The encountered conditions agree with anticipated geological
unit.


3.0 Existing Stability Risk
Local authorities prepare mapping tools to aid in assessing potential slope stability
requirements. The mapping tools are a “high level” approach where the site specific
investigations are specific to a particular site/allotment. It is important to note that where a
site specific investigation and slope stability assessment are undertaken, they take precedence.

Reference to the available overlays for the area show the allotment has been initially mapped
as “Moderate” in terms of landslide hazard.



4.0 Previous Geotechnical Investigation
A geotechnical investigation for the proposed development has been undertaken by Global
Testing. This report is attached and the encountered conditions in this investigation have
informed the analysis undertaken by this office. Given this, where discrepancies exist between
the encountered conditions in the referenced report and the encountered conditions, our
analysis cannot be considered to be accurate and reassessment will be required.




09 Dec 2021                                                    Proposed Subdivision and Residence

Page 4

                                                                                                   51 640 311 842
                                                                                                       CONTACT
                                                                                      [email protected]
                                                                                               arcosgroup.com.au
                                                                                                         OFFICES
                                                                           Sunshine Coast | Brisbane | Gold Coast




The referenced report encountered residual clay underlain by weathered rock below
approximately 1.2 m to 1.8 m depth. The weathered rock is inferred to be from the predicted
geological unit at the site. No groundwater seepage was observed in the investigation
undertaken.

5.0 Walkover Assessment
Geotechnical comments are based on the factual findings of the investigation, best practice,
local experience, published correlations; however, are fundamentally founded in opinion and
this should be considered.


An experienced geotechnical engineer undertook the walkover assessment on 07 Dec 2021.
As part of the walkover assessment, 'spot' measures were taken of the slope angles and
observations pertaining to any obvious previous slope instability on the allotment and
immediately adjoining areas that were readily accessible at the time of the inspection was
undertaken. The surface levels on the site fall away to the north-west at relatively uniform
grades of approximately 10-15°. No obvious signs of disturbed ground, tension cracks or
hummocks were noted during the walkover assessment. A variety of vegetation ranging from
small shrubs to mature trees were observed. The mature trees were all observed to be typically
vertical with no misshapen or curved trunks. Misshapen or curved trunks are usually good
indicators for previous slope instability. The photographs attached to this report show the
conditions of the site at the time of the inspection and assessment undertaken.

6.0 AGS Assessment
Landslides are caused where a soil or rock mass has a decrease in strength, usually attributed
to groundwater, resulting in the material not being able to maintain its own self-weight
resulting in a slope failure.


The Australian Geomechanics Society (AGS) developed a set of tools and procedures for
assessing the stability of a slope. The tools and procedures presented with the AGS
documentation form the basis of the assessment undertaken herein and their documentation
is attached for reference.


The guidelines also identify that the regulator typically sets the standard for levels of tolerable
risk. AGS defines tolerable risk as “risks within a range that society can live with so as to secure
certain benefits. It is a range of risk regarded as non-negligible and needing to be kept under
review and reduced further if practicable”.

The guides suggest that areas of moderate or greater risk should not be developed unless a
rigorous remediation plan be implemented to reduce the area to a level of Acceptable Risk.
AGS defines acceptable risk as “risk which everyone affected is prepared to accept. Action to further


09 Dec 2021                                                     Proposed Subdivision and Residence

Page 5

                                                                                                  51 640 311 842
                                                                                                      CONTACT
                                                                                     [email protected]
                                                                                              arcosgroup.com.au
                                                                                                        OFFICES
                                                                          Sunshine Coast | Brisbane | Gold Coast




reduce such risk is usually not required unless reasonably practicable measures are available at low
cost in terms of money, time and effort.”.

AGS suggest that regulators generally accept risk levels of “low” or lower as a level of
acceptable risk.

AGS prepared a semi-quantitative assessment tool for determining the level of risk for a site.
The tool separates the potential hazards for a site, from a stability context, and rates them with
a level of risk frequency. The multiplication of these individual risk frequency summates as the
risk frequency rating which is then measured against the levels of risk nominated by AGS.


The results of this analysis are shown in Table 1.


Table 1: Results of AGS Qualitative Risk Assessment
               Hazard                          Likelihood      Consequence                Risk Level
            Global Failure                   Barely Credible   Catastrophic                    Low
     Shallow slumping or slide of               Unlikely          Minor                        Low
             surface soils
Based on the results of the AGS assessment, the perceived risk based on the conditions
encountered and information available at the time of the assessment is “Low”.

7.0 Hillside Construction
The following works should be implemented in addition to other items highlighted within this
document. These points are considered to be typical good hillside construction practice as
explained in attached documentation:

•   Foundations should be founded into stiff (or stronger) residual clay.
•   Where slopes are not supported by an engineer designed support system, natural slopes
    within or near building envelope or movement sensitive areas should be no steeper than
    2H:1V.
•   Building platform fill should be limited to a maximum height of 1 m. The filling should be
    step keyed into the natural slope and battered no steeper than 3H:1V unless an engineer
    designed retention system is in place.
•   Unsupported cuts steeper than 2.5H:1V will require engineer designed retention systems.
•   All stormwater and surface water is to be collected and discharged by an approved
    stormwater drainage system. The use of subsurface drainage systems are not suitable
    unless greater than 50 m downslope from the envelope at this site.
•   Ongoing maintenance of the effluent wastewater area is also considered mandatory. The
    location of the application area should be located below the proposed building. Plumbing
    and services must also not be allowed to leak and regular maintenance and inspections
    should be undertaken.

09 Dec 2021                                                    Proposed Subdivision and Residence

Page 6

                                                                                                51 640 311 842
                                                                                                    CONTACT
                                                                                   [email protected]
                                                                                            arcosgroup.com.au
                                                                                                      OFFICES
                                                                        Sunshine Coast | Brisbane | Gold Coast




•   Erosion protection of cut and fill batters will be required. Batters should incorporate crest
    and toe drainage. Batters should be vegetated appropriately to minimise erosion.

8.0 Geotechnical Recommendations
The following sections details specific geotechnical constraints or recommendations in
addition to general hillside construction notes.

8.1 Site Preparation and Earthworks
The following comments are provided in relation to site preparation for earthworks.
•   Fill at this site must be limited to not more than 1 m unless supported by an engineer
    designed and certified retaining structure
•   Areas where fill is proposed should be stripped of uncontrolled fill, soft, overly wet,
    foreign, or otherwise deemed unsuitable material (material that is potentially
    compressible) down to a relatively stiff dry base ensuring no organics material is present.
•   Stripped areas must be inspected by the geotechnical testing authority (GTA) to ensure
    no soft spots or loose zones are present. This should be done with the use of a loaded
    body truck or 12 tonne roller as a minimum. Areas showing signs of movement under the
    action of the testing equipment should be either over excavated and replaced with select
    fill or conditioned onsite through tyning, blending or other suitable methods.
•   Areas sloping in excess of approximately 1 vertical unit to 10 horizontal units (1V:10H),
    the surface will need to be benched at a minimum vertical bench height of 0.3 m to enable
    keying in of the new fill and existing soil. The benches will also need to be shaped
    adequately to promote drainage.
•   Edge batters should be formed by over filling an area and ‘trimming’ back to the desired
    profile.
•   Although no standard exists for the moisture content of soils, it is recommended that the
    site soils be placed at or near optimum moisture content (OMC) for general earthworks
    operations. This increases efficiency during earthworks operations. A range of +/- 2% of
    OMC is recommend for general earthworks.
•    Where site soils are proposed for use as fill in other areas, won material will need to have
    a maximum particle size of 75 mm or be observed to break down under the energy of
    compactive equipment.
•   Fill materials should be placed in relatively horizontal layers with a maximum placement
    thickness of 200 mm. The materials should be compacted to a minimum dry density ratio
    of 98% relative to Standard compactive effort.
•   Highly plastic natural clays are very sensitive to the presence or lack of moisture and
    therefore care should be used to place the material within the range nominated and to a
    maximum dry density of 102% relative to Standard compactive effort. Where this does
    not happen, the material could readily swell, soften, or be subject to significant
    trafficability issues.


09 Dec 2021                                                  Proposed Subdivision and Residence

Page 7

                                                                                                          51 640 311 842
                                                                                                              CONTACT
                                                                                             [email protected]
                                                                                                      arcosgroup.com.au
                                                                                                                OFFICES
                                                                                  Sunshine Coast | Brisbane | Gold Coast




•     Earthworks quality testing will be required on this site. The GTA will need to provide
      supervision in accordance with AS3798 and undertake field density tests to monitor the
      actual dry density and moisture content of placed materials.
•     Completed platforms should be sealed with a minimum 250 mm layer of relatively
      granular material (CBR15% or greater) to minimise the effects of relatively clayey
      subgrades drying out leading to excessive cracking.
•     Earthworks activities should be undertaken in relatively homogenous sequences where
      achievable (ie. do not place “pockets” of gravel material next to impermeable clays as this
      will lead to zones where water could become trapped).
•     Fill material will be subject to potential settlement post placement. Well compacted fill
      placed in accordance with AS3798 and otherwise, good earthworks procedure should
      typically be subject to settlement in the order of 0.5% to 1.0% of the fill thickness over a
      log cycle of time.

Arcos can assist in preparing earthworks documentation or guidelines for contractors to
adhere to in order to achieve an efficient and “fit for purpose” end product.

8.2 Retaining Structures
Retaining walls must be designed by a suitably qualified and experienced engineer and
preferably in accordance with AS 4678. The geotechnical parameters for use in design of either
flexible or rigid wall systems are presented in Table 2.


Passive forces should be ignored in areas where disturbance may occur (ie. future trenching
or earthworks processes).


Compaction for retaining wall backfill should be undertaken with due care. Layers should be
placed thinner than for normal earthworks processes (say a maximum layer thickness of
100 mm) and compacted using light weight equipment such as hand controlled compactive
equipment to minimise the stresses on the wall. If hand controlled equipment is not practical,
temporary wall propping will be required.


Walls will need to incorporate full height drainage in accordance with good design practice to
minimise hydrostatic pressure. The below parameters do not include surcharge loadings.


Table 2: Retaining Wall Parameters (Unfactored)
                                                Unit Weight         Friction Angle          Drained Cohesion
                 Material
                                                 (kN/m3)                  (Ø)                     (c’)

    Controlled fill*, stiff (or stronger)             19                   26                             2
Notes:    *-   residual clay under Level 1 conditions and behaves as clayey material
                  Compacted



09 Dec 2021                                                           Proposed Subdivision and Residence

Page 8

                                                                                                51 640 311 842
                                                                                                    CONTACT
                                                                                   [email protected]
                                                                                            arcosgroup.com.au
                                                                                                      OFFICES
                                                                        Sunshine Coast | Brisbane | Gold Coast




8.3 Footings
In accordance with industry standards, a geotechnical engineer from Arcos should undertake
the testing within the footings to confirm that the encountered material is in alignment with
the adopted parameters and assumptions provided within this report. Where this does not
occur, Arcos cannot be held liable for any of the information presented within this report.

All footings will need to be designed to accommodate potential ground surface movement,
settlement values and any additional settlement values associated with the placement of new
fill.

Settlement for suitably sized and designed high level footings should be in the order of 1-2%
of the width of the footing.

If footings are located adjacent to an underground service or other obstruction that is not
homogenous with the founding strata, the footing should be extended a minimum 0.3 m
below an imaginary line projected at a 45 degree angle from the lowest point of the
service/obstruction. This is depicted graphically for reference:




Where footings found a minimum of 0.5 m into stiff (or stronger) residual clay, they may be
dimensioned for a maximum allowable bearing pressure of 100 kPa. Based on the borelogs,
the above material is encountered at approximately 0.2 m depth below existing surface levels
at the time of the investigation.


The ultimate geotechnical end bearing and shaft adhesion parameter are presented in Table 3.
The values given will need to reduced by applying a suitable geotechnical strength reduction
factor (Φg) for limit state or divided by a suitable factor of safety for working stress methods.
The Φg should be selected by the designer.




09 Dec 2021                                                  Proposed Subdivision and Residence

Page 9

                                                                                                                                    51 640 311 842
                                                                                                                                        CONTACT
                                                                                                                       [email protected]
                                                                                                                                arcosgroup.com.au
                                                                                                                                          OFFICES
                                                                                                            Sunshine Coast | Brisbane | Gold Coast




Table 3: Deep Level Footings – Ultimate Geotechnical Parameters (Long Pile)
                                                                                                                Bored
                                      Material
                                                                                                  Fb (kPa)                     Fs (kPa)

                              Stiff residual clay                                                    675                           30

                               Weathered rock                                                       1800                           60
Notes: * - Fb = Ultimate End Bearing Pressure (unfactored) for long piles, Fs = Ultimate Shaft Adhesion (unfactored).




The upper 1 m of soil profile should be ignored in shaft calculations to allow for shrinkage
cracks. The values presented in Table 3 assume that the material equal to four pile diameters
below the base of any footings is as strong or stronger.


Settlement values are subjected to a variety of factors; however, a properly designed and
constructed pile should have a serviceability settlement between 1% and 2% of its’ diameter.


9.0 Limitations
Arcos Unit Group Pty Ltd (AG) has prepared this document for Proposed Lot 12 (#130) Lake
Macdonald Drive, Cooroy for Lyndal Petersen. The document is specific to this particular project
and for the purposes as described within the document. The document cannot be used for
any other project on the same site or other sites or relied upon by a third party. Any party
relying upon this document beyond its exclusive use and purpose as stated above, and without
the express written consent of AG, does so entirely at its own risk and without recourse to AG
for any loss or damage. AG has necessarily relied upon information provided by the client
and/or their agents.

It is important to understand that ground conditions can be spatially variable over short
distances as a result of geological processes or human interference. These changes can occur
after the time of which field work was undertaken. Given this, the assumed subsurface
conditions within this document are only indicative of the conditions at the testing locations
to the depths investigated at the time of the fieldwork.

The advice given in this document is based upon the assumed subsurface conditions. The
relevance and accuracy of advice given is directly affected by variations in ground conditions
across the site between testing locations that has not been captured and time elapsed since
investigation works.

This document must be kept in entirety, read in full and understood. Interpretations or
conclusions made by others unless supported by an expressed written statement,
interpretation, outcome or stated within this document cannot be the responsibility of AG.

09 Dec 2021                                                                                  Proposed Subdivision and Residence

Page 10

                                                                                                 51 640 311 842
                                                                                                     CONTACT
                                                                                    [email protected]
                                                                                             arcosgroup.com.au
                                                                                                       OFFICES
                                                                         Sunshine Coast | Brisbane | Gold Coast




This document or parts of it should not be used as part of a specification or design for a project
without prior review and agreement by AG.

__________________________________________________________________________________


We trust this information is satisfactory for your current needs. Should you have any questions,
please feel free to contact the signed authors.




09 Dec 2021                                                    Proposed Subdivision and Residence

Page 11

                                                51 640 311 842
                                                    CONTACT
                                   [email protected]
                                            arcosgroup.com.au
                                                      OFFICES
                        Sunshine Coast | Brisbane | Gold Coast




09 Dec 2021   Proposed Subdivision and Residence

Page 12

                                                51 640 311 842
                                                    CONTACT
                                   [email protected]
                                            arcosgroup.com.au
                                                      OFFICES
                        Sunshine Coast | Brisbane | Gold Coast




09 Dec 2021   Proposed Subdivision and Residence

Page 13

                                                51 640 311 842
                                                    CONTACT
                                   [email protected]
                                            arcosgroup.com.au
                                                      OFFICES
                        Sunshine Coast | Brisbane | Gold Coast




09 Dec 2021   Proposed Subdivision and Residence

Page 14

                                                51 640 311 842
                                                    CONTACT
                                   [email protected]
                                            arcosgroup.com.au
                                                      OFFICES
                        Sunshine Coast | Brisbane | Gold Coast




09 Dec 2021   Proposed Subdivision and Residence

Page 15

                                                51 640 311 842
                                                    CONTACT
                                   [email protected]
                                            arcosgroup.com.au
                                                      OFFICES
                        Sunshine Coast | Brisbane | Gold Coast




09 Dec 2021   Proposed Subdivision and Residence

Page 16

                                                51 640 311 842
                                                    CONTACT
                                   [email protected]
                                            arcosgroup.com.au
                                                      OFFICES
                        Sunshine Coast | Brisbane | Gold Coast




09 Dec 2021   Proposed Subdivision and Residence

Page 17

                                                51 640 311 842
                                                    CONTACT
                                   [email protected]
                                            arcosgroup.com.au
                                                      OFFICES
                        Sunshine Coast | Brisbane | Gold Coast




09 Dec 2021   Proposed Subdivision and Residence

Page 18

                                                51 640 311 842
                                                    CONTACT
                                   [email protected]
                                            arcosgroup.com.au
                                                      OFFICES
                        Sunshine Coast | Brisbane | Gold Coast




09 Dec 2021   Proposed Subdivision and Residence

Page 19

                                                51 640 311 842
                                                    CONTACT
                                   [email protected]
                                            arcosgroup.com.au
                                                      OFFICES
                        Sunshine Coast | Brisbane | Gold Coast




09 Dec 2021   Proposed Subdivision and Residence

Page 20

                                                51 640 311 842
                                                    CONTACT
                                   [email protected]
                                            arcosgroup.com.au
                                                      OFFICES
                        Sunshine Coast | Brisbane | Gold Coast




09 Dec 2021   Proposed Subdivision and Residence

Page 21

                                                                                                         51 640 311 842
                                                                                                                   MAIL
                                                                                                            PO BOX 851
                                                                                                Moffat Beach, QLD, 4551
                                                                                                                OFFICES
                                                                                  Sunshine Coast | Brisbane | Gold Coast




GEOTECH REPORT
These notes have been provided to clarify and               Arcos Unit Group Pty Ltd undertakes quality assurance
enhance the reader’s understanding of the terminology       checks in accordance with its’ quality system
used throughout the report, and also to identify where      requirements; however, restrictions on the project
limitations exist. All investigations are undertaken        outside of Arcos Unit Group Pty Ltd’s control can result
based on budgetary constraints which impart a level of      in unanticipated variations, changes in policy or
uncertainty as a result of limiting the amount of           interpretation of said policies by the relevant authority,
investigation undertaken.                                   or the actions of contractors subject to commercial
                                                            pressure.
Copyright
                                                            Site Variations
This report remains the property of Arcos Unit Group
Pty Ltd at all times unless ownership is transferred in     If site variations become evident at the time of
writing. It cannot be included in any documentation         construction or after the release of a report, Arcos Unit
without the express written permission of Arcos Unit        Group Pty Ltd requests immediately notification. This
Group Pty Ltd                                               notification is proposed in order to assist in remediation
                                                            prior to any permanent structures or design procedures
Subsurface Report Sheets (Bores etc)                        are undertaken.

The provided subsurface sheets are inherently an            Collaboration
interpretation undertaken by a suitably qualified and
experienced person; however, the reliability of the         Arcos Unit Group Pty Ltd strongly recommends open
provided information will rely on the method of             and collaborative communication about the use and
investigation. It is prudent to state that these sheets     inherent interpretation of Arcos Unit Group Pty Ltd’s
only represent a very small percentage of the               report. Please contact the author of the report to
subsurface conditions across a particular project.          arrange for an obligation free discussion regarding the
                                                            potential benefits of having geotechnical consultants.
It reasons that given the relatively small representation
of the subsurface conditions for a project, spacial
variability between testing locations must be taken into
consideration including the orientation of strata
intersections.

The presence or lack of groundwater is usually stated
on the subsurface sheets; however, it must be noted
that the measurements undertaken onsite are typically
very inaccurate and if the presence or lack of
groundwater will have any degree of affect on the
project, additional groundwater monitoring techniques
should be employed such as groundwater monitoring
wells.

Reporting

The report has been prepared and reviewed by suitably
qualified and experienced persons. The persons draw
on previous experience, local knowledge, published
literature, and otherwise standard engineering
approaches and principals. The context of which the
report has been prepared for must be considered and
if the context changes, due consideration should be
given to the possibility that the report is no longer
considered relevant and review by Arcos Unit Group
Pty Ltd must be undertaken.

Page 22

                                                                                                                            51 640 311 842
                                                                                                                                     MAIL
                                                                                                                               PO BOX 851
                                                                                                                  Moffat Beach, QLD, 4551
                                                                                                                                  OFFICES
                                                                                                    Sunshine Coast | Brisbane | Gold Coast




Interpretation of the
Subsurface Sheets
                                                                  It is important to note that the point load strength index
The terminology included on Arcos Unit Group Pty Ltd’s
                                                                  does not take into consideration the degree of fracturing of
has been evolved from AS1726:2016. Typically a soil’s
                                                                  a rock mass which can both lower and increase the overall
strength, colour, plasticity, grain size, other inclusions, and
                                                                  rock strength. The strength of rock is broken down as
moisture will be described. A rock’s strength, weathering,
                                                                  follows:
colour, grain, and other inclusions are typically described.
                                                                   Very Low Strength (VLS)               < 2 MPa (UCS)
Soil                                                               Low Strength (LS)                     2 to 6 MPa (UCS)
                                                                   Medium Strength (MS)                  6 to 20 MPa (UCS)
Soil is typically described by the components that make it         High Strength (HS)                    20 to 60 MPa (UCS)
up by percentage or whichever has a governing behaviour.           Very High Strength (VHS)              60 to 200 MPa (UCS)
The types and sizes reproduced from AS1726 are:                    Extremely High Strength (EHS)         > 200 MPa (UCS)
 Boulder                  >200 mm
 Cobble                   63 to 200 mm
 Gravel                   2.36 to 63 mm                            Very Low Strength (VLS)               < 0.1 Is(50)
 Sand                     0.075 to 2.36 mm                         Low Strength (LS)                     0.1 to 0.3 Is(50)
 Silty                    0.002 to 0.075 mm                        Medium Strength (MS)                  0.30 to 1.0 Is(50)
 Clay                     < 0.002 mm                               High Strength (HS)                    1.0 to 3.0 Is(50)
                                                                   Very High Strength (VHS)              3.0 to 10.0 Is(50)
The strength of soil is usually assessed by suitably               Extremely High Strength (EHS)         > 10.0 Is(50)
experienced persons through the use of laboratory test
results, published literature, field assessments or a             The Is(50) values are based on a correlation between the
combination of the above. The strength of soil is                 unconfined compressive strength (UCS) of 20. This value
characterised into either cohesive (clays and silts) or           varies significantly and site specific testing must take
cohesionless (sands and gravels) as shown below:                  precedence.
 Cohessive Soil           Strength Term                           Rock weathering is broken down as follows:
 Very Soft                < 12.5 kPa
 Soft                     12.5 to 25 kPa                           Extremely weathered       Behaves as soil but rock
 Firm                     25 to 50 kPa                             (EW)                      structure evident
 Stiff                    50 to 100 kPa                            Highly weathered          Colour and strength of original
 Very Stiff               100 to 200 kPa                           (HW)                      fresh rock is not recognisable.
 Hard                     > 200 kPa                                                          Decomposition of rock evident
                                                                   Moderately                Defects are heavily stained with
 Cohesionless Soils       Strength Term (uncorrected Qc)           weathered (MW)            rock mass showing signs of
 Very Loose               <2 MPa                                                             discolouration
 Loose                    2 to 5 MPa                               Slightly weathered        Some staining but minimal to no
 Medium Dense             5 to 15 MPa                              (SW)                      change in strength
 Dense                    15 to 25 MPa                             Fresh stained             Minor staining evident
 Very Dense               > 25 MPa                                 (FS)
                                                                   Fresh rock                No change
Rock                                                               (FR)

Rock is typically described by the components that make           Rock fracturing is broken down as follows and can only be
it up by percentage or whichever has a governing                  accurately described where undamaged continuous
behaviour. The strength of rock is typically the most             sampling has been undertaken:
important component. Typically, the strength of rock is
based on laboratory testing, tactile assessment and other          Fragmented (Fg)             Defect spacings < 20 mm
observations as relevant. The industry standard method             Highly Fractured (HF)       Defect spacings 20 to 50 mm
for assessing the strength of rock in the field is to use the      Fractured (Fr)              Defect spacings 50 to 200 mm
point load strength index (AS4133.4.1).                            Slightly Fractured (SF)     Defect spacings 200 to 1000 mm
                                                                   Unbroken (Ub)               Defect spacings > 1000 mm

Page 23

PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007

EXAMPLES OF GOOD HILLSIDE ee

 
 
 
 
 
  
  
 
 

Surface water interception drainage

Waterton, edequately sited and founded
rood water storage tartks (with due regard for
Impact of potertial ipakage)

Fleaib le structure

Roed water piped aff ate or stored

Onsite detention tanks, walertight ard
od fourdied. Poterlial teakage

   
  

\— Cutting and filing minimised in development

Sewage aftuant pumped cut or connected to seinne:
Tanks adequately teunded and watertight. Potential
legiage managed by suh-scil draing

‘
“_. Engingered retaining walls with both surface and
subsurface drainage (constructed before dwelling) 2
© AGE (2006)

EXAMPLES OF POOR HILLSIDE PRACTICE

Unstabfised rock topples
Bnd terete doensiope

Vegatation removed ——

    
 
 
 
 
  
 
 
  
  
  

 

Discharges ot rootwater soak ‘Staee unsupported \ }
meny rather than conducted off out fails 1
ule & to secure storage for re-use \
s '
‘Sruciure unatie jo tolerate —, ~
tattorrent and cracks inary = » \
a“ a ~ — \

Poorly compacted fil cotties a 6 . »,
uneverty and cracks pool 2a 5 \ LD,
- \ x

inadequate walling unatie LY >
bo support i y \
ry

Loose. saturated A cides
and posaily flows doweslape

Incetoquataby supported cut tale rc BS seat) Roohwaner introduced into slope

Sarabed

‘Dwelling met founded in bedrock

\___-Aptence of subeod drminage within 4
—— Pondect water enters shape and activates landside nia bins
'—Rossitte tavel downslope which Impacts other davalagment down Se stan ASS (2009) Appencis J

114 Australian Geomechanics Vol 42 No 1 March 2007

Page 24

PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX C: LANDSLIDE RISK ASSESSMENT
QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY

QUALITATIVE MEASURES OF LIKELIHOOD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Approximate Annual Probability Implied Indicative Landslide Deceripei Deccripe Level
Indicative Notional Recurrence Interval escripaon ‘seriptor ve
Value Boundary
107 5x10? 10 years 5 The event is expected to occur over the design life. ALMOST CERTAIN A
10? . 100 years 20 years ae a will probably occur under adverse conditions over the LIKELY B
y 200 7 , ——
10° 3x10 4 1000 years > 000. soars The event could occur under adverse conditions over the design life. | POSSIBLE Cc
107 5x10 10,000 years ~ pa a might occur under very adverse circumstances over the UNLIKELY D
5 2 -
10° 5x10 20,000 years The event is conceivable but only under exceptional circumstances
sx10* 100,000 years over the design life RARE
> .
10° * 1,000,000 years | 700-000 vears [The event is inconceivable or fanciful over the design life. BARELY CREDIBLE F
Note: (1) The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.
QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY
Approximate Cost of Damage
Indicative Notional Description Descriptor Level
Value Boundary
. Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
200% ae ie ~ © © ©
200% 100% stabilisation. Could cause at least one adjacent property major consequence damage. CATASTROPHIC 1
60% ° Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant MAJOR >
° 40% stabilisation works. Could cause at least one adjacent property medium consequence damage. ~
20% “° Moderate damage to some of structure. and/or significant part of site requiring large stabilisation works. MEDIUM 3
“~ 10% Could cause at least one adjacent property minor consequence damage.
5% 1% Limited damage to part of structure. and/or part of site requiring some reinstatement stabilisation works. MINOR 4
. Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
0, 2 N FI! A N
0.5% notional boundary of 0.1%. See Risk Matrix.) INSIG Cc

 

 

 

 

 

Notes: (2) The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
unaffected structures.

@G) The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.

(4) The table should be used from left to night; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa

Australian Geomechanics Vol 42 No 1 March 2007
Form No. 68039 RL2 August 2010

 

Page 25

PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
APPENDIX C: —- QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)

QUALITATIVE RISK ANALYSIS MATRIX - LEVEL OF RISK TO PROPERTY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LIKELIHOOD CON: SEQUENCE ES TO PROPERTY (With Indicative Approximate Cost of Demsge)_
Indicative Value of 1: CATASTROPHIC : MAJOR 3: MEDIUM 4: MINOR
Approximate Annual 200% 60% 20% 5% IN! SIGNIFIC ANT
Probability 0.5%
A - ALMOST CERTAIN 107 H MorL (5)
B - LIKELY 107 M L
C - POSSIBLE 107 M VL
D - UNLIKELY 107 L VL
E - RARE 107 M L L VL VL
F - BARELY CREDIBLE 10% L VL VL VL VL

 

 

 

 

 

 

 

Notes: (5) For Cell AS, may be subdivided such that a consequence of less than 0.1% is Low Risk.
(6) When considenng 2 nsk assessment it must be clearly stated whether it 1s for existing conditions or with nsk control measures which may not be implemented at the current

time.

 

 

 

 

 

 

 

RISK LEVEL IMPLICATIONS
Risk Level Example Implications (7)
Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
property.
H HIGH RISK Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
nisk to Low. Work would cost a substantial sum m relation to the value of the property.
May be tolerated m certain circumstances (subject to regulator's approval) but requires investigation, planning and
M MODERATE RISK umplementation of treatment options to reduce the nsk to Low. Treatment options to reduce to Low nsk should be
implemented as soon as practicable.
- Usually acceptable to regulators. Where treatment has been required to reduce the nsk to this level, ongomg maintenance is
L LOW RISK required
VL VERY LOW RISK Acceptable. Manage by normal slope maintenance procedures.

 

 

 

Note: (7) The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk: these are only
given as a general euide.

Form No. 68039 RL2 August 2010

Australian Geomechanics Vol 42 No 1 March 2007

 

 

Page 26

APPENDIX G - SOME GUIDELINES FOR HILLSIDE CONSTRUCTION

 

 

 

 

 

 

 

 

 

 

Fas

vide dramage measures and erosion contol.

oe

Strip vegetation and topscdl and key into aamral slopes price to filling
‘Use clean 40] matecials and compact to engimecring standards.
Batter to appropriate slope or support with engineered retaining wall.

GOOD ENGINEERING PRACTICE POOR ENGINEERING PRACTICE
ADVICE
GEOTECHNICAL Obnim advice Som a expensnced geotechnical practioner at early | Prepare detailed plan and stact site works before
ASSESSMENT sage of plannms and before site works geotechnical advice.
PLANNING
SITE PLANNING Having obtained geotechnical advice, plan the development with the mek | Plan development without regard for the Risk.
from the identified hazard: and consequences in mind
DESIGN AND CONSTRUCTION
Use flexible structures which incorporate properly designed brickwork, timber | Floor plans which require extensive cutting and
HOUSE DESIGN or steel Tames. imber or panel cladding i :
Consider use of split level: Movement intolerant structures.
Use docks for recreational areas whers appropriate.
SITE CLEARING Retain natural vegetation wherever practicable. Indjscriminately clear the site.
ACCESS & Satisfy requirements below for cats, fills, retaining walls and dramage. Excavate and fill for site access before
DRIVEWAYS Council specifications for grades may need to be modified geotechnical advice.
Driveways and parking areas may need to be fully supported on piers.
EARTHWORKS Retain natural contours wherever possible. Indtscximinatory bulk oarthworks.
Manzzise dopa. Large scale cuts and benching
Curs Pr we ened eens we ee eee they Unsupported cuts

| Imors Gramazerequements
Loose or poorly compacted S10, which if it fails,

may flow a considerable distance including

omto propecty below.

Block natural drainage lines.

Fill over existing vegetation and topsoil.

Inchnde stumps, tress, vegetation, topsoil
i rubble stc in £0.

 

Rack OUTCROPS

Remove or stabilise boulders which may have unacceptable nak.

Disturb or undercut detached blocks or

 

 

 

 

 

 

 

 

& BOULDERS Support rock faces where necessary. boulders
Engineer design to resist applied soil and water forces. Construct a stractazally inadequate wall such 2:
RETAINING Found on rock where practicable. sandstons flagging, brick or umreinforced
WALLS Provide subsurface drainage within wall backiill and surface drainage on slope | blockwork.
above. Lack of sabsurface drains and weephoks.
Construct wall as scon a5 possible after cat/fill operation.
Found within rock where practicable. Found om topsoil, loose SI detached boulders
FOOTINGS ‘Use rows of piers or strip footings oriented up and down slope. or undercut clift.
Desise for lateral cosep pressures if necessary.
BackSll footing excavations to axchads imaress of surdace water.
Engineer desimed.
Support on piers to rock where practicable.
SWIMMING POOLS | Provide with under-~drainage and sravity drain outlet where practicable.
Desise for high soil pressures which may develop on uphill side whilst there
zazy be Little or no Lateral sapport on downhill sids.
DRAINAGE
Provide at tops of cat and fill slopes. Discharge at top of fills and cats.
Discharge to street drainage or natural water courses. Allow water to pond on beach areas.
SURFACE Provide gemeral falls to prevent blockage by siltation and imcorporate silt traps.
Lime to minimise infiltration and make flexible where possible.
tal stractures to dissipate emergy at changes of slope and/or direction.
Provide Slter around subvarface drain. Discharges rood ranoff into absorpticn trenches
omens Provide drain behind retains walls.
- ‘Use flexible pipelines with access for maintenance
Prevent inflow of surface water.
Soar & Uvaally requizes Or mains sewer systems; absorption teaches may | Discharge sullage directly onto and imto slopes.
SULLAGE be possible in some areas if rick is acceptable. Use absorption tenchss without consideration
— Storage tanks should be water-tight and adequately founded. of landslide misk.
EROSION Control erosion as this may lead to instability. Failure to observe carthworks and dramago
CONTROL & Revegetate cleared area recommendations when landscaping.
LANDSCAPING

DRAWINGS AND SITE VISITS DURING CONSTRUCTION

 

 

 

 

 

 

 

DRAWINGS Building Application drawings should be viewed by geotechnical consukant
SITE VISITS Site Visits by consultant be iate darms comstruction’
INSPECTION AND MAINTENANCE BY OWNER
OWNER'S Clean dramage systems; repair broken joints in drm: and leaks m supply
RESPONSIBLITY i

Pupes.
Where structural distress is evident see advice
Tf seepage observed, determines causes or sesk advice om consequences.

 

 

 

 

Page 27

 

 

 

 

A
7 Proposed Emt for

ny oe, & Services
/

12

1.8

Weel |.
ay) eh. V5 67
7T 81% ee

J RP227534-

Eee

, dh

66, 4 Rf 89, \

227534" "| RP227534 [OS] NP227934 »
* - /

S

 

 

 

 

 

 

 

\ a cf a ig kee
i ae Re MB as ee! ew
Client: L. PETERSEN Project: Plan 1 of 1 NOTE:
This plan has been prepared for discussion
PLAN OF PROPOSED Date: 13-12-2020 purposes only and may be subject to change.
RECON F | GU RATI ON Dimensions and areas shown hereon are
MAX WATTERSON OF LOT 233 ON Scale: 1:1500 approximate only and subject to final survey.
Rev 1: 9/07/2021
+ ASSOCIATES MCH4301 . Datum: AHD Contours added.
CONSULTING SURVEYORS Origin: NSC
& PLANNERS Mapping
12 Maple Street :
PO Box 639 Cont.Int: 1.0m
Cooroy Qld 4563
LOCAL GOVT: NOOSA S.C. Ref:
Ph. (07) 54426121 er.
Fax. (07) 54425125 LOCALITY: ROY _
Email. [email protected] 0¢ COORO 10 30 1 8AF

 

 

 

 

 

 

Page 28

GLOBAL TESTING

THE ONLY NAME IN SOILS

 

QBCC Licence No. 1018403
PH: 07 54 740 900

3/53 Gateway Drive, Noosaville 4566
Email: [email protected]

 

_| 21/0611-1 SITE CLASSIFICATION REPORT

_| LYNDALL PETERSEN.

PROPOSED SUBDIVISION & PROPOSED FUTURE RESIDENCE,
PROPOSED LOT 12 (No.130) LAKE MACDONALD DRIVE,

| COOROY.

| 11/06/2021

  
  
  
   

 

 

 

1. INTRODUCTION
The purpose of this report is to classify the subject allotment in accordance with Australian
Standard 2870 - 2011 'Residential Slabs and Footings’. From this classification, a footing
system can be recommended for the structure so as to allow adequate performance of the
footings under the soil conditions determined at the site.

2. SITE DESCRIPTION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Type of Allotment Residential
Vegetation (Building Envelope) Grass
Vegetation (Allotment) Grass, scattered undergrowth, scattered large
trees.
Road Status Sealed
Slope 18% towards the west
Surface Water will Drain Towards West
Will Surface Water from adjoining Yes
allotments traverse this site?
Does the site have any watercourses Yes-Dam downhill.
Surrounding Allotments
Left Acreage
Right Acreage
Rear Acreage
Depth to Weathered Rock N/a
Depth to Water Table N/a

 

 

 

3. SITE CLASSIFICATION AND TARGET STRATA

Based on the findings of the site investigation, the classification of the site is considered to
conform to:

CLASS “ M ” ( See Target Stratum).

in accordance with Australian Standard 2870 - 2011, 'Residential Slabs and Footings,
Construction’.

The Target Stratum for the foundation of the structure located at BH1 is the SANDY
CLAY at a depth of 1100mm below existing ground level.
The Target Stratum for the foundation of the structure located at BH2 is the SANDY
CLAY at a depth of 1300mm below existing ground level.

Page | 1 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
21/0611-1

Page 29

It is the designing engineer’s responsibility to address the potential influence of any trees
present on or around the proposed building site.

If any fill is placed over the existing ground, the structure shall be piered through the fill
into the existing material. Further note that the placement of reactive material as fill or
cutting of the site may change the site’s classification.

PLEASE NOTE: This report does not address slope stability. If a slope stability analysis
is required, the services of a suitably qualified geotechnical engineer should be sought.

4. SOIL PROFILE
Refer to Soil Profile Report for borelog information
Whilst every effort has been made to ensure that the borelogs carried out at the subject allotment
are indicative of the soil profile over the site any discrepancy between the profile detailed in
the borelogs and that observed during construction shall be referred to Global Testing for
immediate attention.

5. MATERIALS LABORATORY TEST RESULTS

Soil Laboratory testing carried out on samples of the soil taken from the site gave the following

 

 

 

 

 

 

 

 

 

results:

BOREHOLE BH1
DEPTH RANGE OF SAMPLE 0.2-0.5m
LIQUID LIMIT (%) N/a
PLASTIC LIMIT (%) Nia
PLASTIC INDEX (%) N/a
LINEAR SHRINKAGE (%) Nia
INSTABILITY INDEX (%) N/a
SHRINK SWELL INDEX, Iss (%) 2.8
PREDICTED SURFACE MOVEMENT 35mm

 

 

 

 

Please note that the Plasticity Index (PI) determined by the Atterberg Test may be correlated to
an Instability Index (Ips)with reference to the results of extensive testing carried out by others,
notably, Dr P Mitchell, ‘Footings for Small Scale Domestic Structures,’ March 1990.

Yours Sincerely,

4,44

MICHAEL PINKNEY. (Laboratory Manager)

Page | 2 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
21/0611-1

Page 30

LIMITATIONS

Recommendations given in this report are based on the information supplied by the client
regarding the proposed building construction in conjunction with the findings of the
investigation. Any change in construction type, building location or omission in the client
supplied information, may require additional testing and/or make the recommendations
invalid.

The recommendations herein identify a target soil stratum into which the footings are to be
founded. The target stratum has been located by the depth in mm of the target stratum's upper
horizon boundary below the existing ground surface level at the time of the site investigation.
Any cutting or filling works and any surface erosion or deposits subsequent to the site
investigation, will alter the measured location of the stratum relative to the surface. Where
required, the author should be notified in such cases to confirm the location of the target
stratum.

The description of the soil given in the Soil Profile section of this report is intended as a brief
overview of the soil's primary constituents. For a detailed classification of the soil, the reader
should refer to the Soil Profile Reports and/or Borehole Reports attached to this report.

Every reasonable effort has been made to locate the test sites so that the borehole profiles are
representative of the soil conditions within the area investigated. The client should be made
aware however, that exploration is limited by time available and economic restraints. In some
cases, soil conditions can change dramatically over short distances, therefore, even careful
exploration programs may not locate all the variations.

If soil conditions different from those shown in this report are encountered or are inferred
from other sources, then the author must be notified immediately.

This report may not be reproduced except in full. The information and drawings provided
with this report shall only be used and will only be applicable for the development shown on
the client supplied information provided for this site.

Any dimensions, contours, slope directions and magnitudes shown on the Test Locality Plan
shall not be used for any building construction or costing calculations. The purpose of the
plan is to show approximate location of field tests only.

Any changes made to these recommendations by persons unauthorised by the author will
legally be interpreted as that person assuming the responsibility for the long-term
performance of the footing system.

The recommendations contained in this report have not taken into consideration the long-term
effects of any previous, current or potential subsurface work by mining companies or
potential slope instability problems. At the time of writing this report neither our client (nor
his agent) nor the local authority had made the author aware that these problems may be
affecting this allotment. If a mining subsidence or slope stability assessment is required for
this allotment, the recommendations of a suitably qualified geotechnical engineer should be
sought.

Page | 3 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
21/0611-1

Page 31

GLOBAL TESTING

THE ONLY NAME IN SOILS

SOIL PROFILE REPORT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CLIENT: Lyndal Petersen AUTHORISED __Lyndal Petersen
BY:
PROJECT: Proposed Lot 12 (No.130) DATE TESTED: 24/05/2021
Lake Macdonald Drive,
Cooroy.
JOB NO: 21/0611-2
Drilling Method: Jacro 105 100mm. Borehole
No.1
Depth Description PENET. Est. Bearing
(mm) (blows per 100mm) Capacity
(kPa)
1 2) 3) 4
0 SANDY CLAY (CH)- High plasticity,
brown, fine to coarse sand, moist, firm.
100 2 50
200 SANDY CLAY (CH)- High plasticity, 3 100
brown, fine to coarse sand, moist, stiff.
300 4
400 4
500 5 150
600 4
700 6 <200
800 6
900 7
1000 8
1100 12
1200 SILTY SANDY CLAY (CI)- Medium 14
plasticity, brown, fine to coarse sand, moist,
very stiff. (Becoming Extremely Weathered
Rock)
1300 <20
1400
1500
1600
1700
1800
1900
2000

 

 

 

 

 

 

 

 

 

 

3000 Hole Terminated

 

 

 

 

 

 

 

 

 

Page | 4 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
21/0611-1

Page 32

GLOBAL TESTING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

THE ONLY NAME IN SOILS
SOIL PROFILE REPORT
CLIENT: Lyndal Petersen AUTHORISED __Lyndal Petersen
BY:
PROJECT: Proposed Lot 12 (No.130) DATE TESTED: 24/05/2021
Lake Macdonald Drive,
Cooroy.
JOB NO: 21/0611-2
Drilling Method: Jacro 105 100mm. Borehole
No.2
Depth Description PENET. Est. Bearing
(mm) (blows per 100mm) Capacity
(kPa)
1] 2 73/4
0 SANDY CLAY (CH)- High plasticity,
brown, fine to coarse sand, moist, firm.
100 SANDY CLAY (CH)- High plasticity, 2 50
brown, fine to coarse sand, moist, stiff.
200 3 100
300 3
400 4
500 4 125
600 4
700 6 <200
800 6
900 6
1000 7
1100 8
1200 8
1300 12
1400 18
1500 <20
1600
1700
1800 SILTY SANDY CLAY (CI)- Medium
plasticity, brown, fine to coarse sand, moist,
very stiff. (Becoming Extremely Weathered
Rock)
1900
2000
3200 Hole Terminated

 

 

 

 

 

 

 

 

Page | 5 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code

21/0611-1

 

Page 33

GLOBAL TESTING

 

THE ONLY NAME IN SOILS

 

Site- Proposed Lot 12 (No.130) Lake Macdonald Drive, Cooroy

Page | 6 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
21/0611-1

Page 34

 

 

 

 

 

 

~ ONN See ui SUOISUAUUIP [fy Ajuo 5}Se]
3SOL oneisod - ict $ PIay Sy] Jo UONeoo] eyeulxoidde 6] MOUS 0] St UBId Buy Jo BSOduNd ay | SUOHEINDje9 Hurjs0d Jo UOH}ON.YSUOS BuIp|ING
UOHEIO] 1938 WIO.NSUSd SUOD D1WIBUAG - Nd * 5
USHeOeD SfoueIog - NE ep Aue 10) pasn oq jou jJeys ue}d 6yj UO UMOYS SepnyiUGeW pue suOoNoeuIp edo}s ‘SsuNOJOO ‘sUOISUeUIP Auy “8JON
anNao37

 

 

 

pu ‘yanur ay} Jo ao¥J.ns ay) UO padeyd

petap.10g ‘syuvyd o¢ Jo UMNUTTUTUT & YIM

 

-IANSSIA ,WIJLIIN 10 MOTJO}Se,
— vaIV UOHVSLLI dLaip aovjang paseo pu

00ST ATVOS wassajeg [epudy : yuat[D 01005 ‘aarig ppeuopoey] 24] (OETON) ZL 10'T pasodozgd : HS LZ0Z/S0/PTZ :P2382,L VC 1-1190/1Z ON Gor

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.