MCU10/2083 Development Application part 2 - Attachment 7 - Stormwater Management Plan

of 18

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn



   




        SITEBASEDSTORMWATER
        MANAGEMENTPLAN
        PROPOSEDDEVELOPMENTAT
        37GibsonRoad,Noosaville
        FOR
        MarquetteProperties


[OCR of page images]
eativi
— VT RECISION

vases TN] ep) od

MANNA
URBANCONSULTANTS

SUES SPR ea
MANAGEMENT PLAN

PROPOSED DEVELOPMENT AT
37 Gibson Road, Noosaville
FOR

Marquette Properties

PLANNERS
URBAN DESIGNERS
UAV (e)st

Vy (O\ oe aN Nass)
LANDSCAPE ARCHITECTS

 
Log in to download the original file

MCU10_2083 Development Application part 2 - Attachment 7 - Stormwater Management Plan.pdf · 2.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 17 pages

Page 2

                         




                                                                    SITEBASEDSTORMWATER
                                                                    MANAGEMENTPLAN

                                                                    PROPOSEDDEVELOPMENTAT
                                                                    37GibsonRoad,Noosaville
                                                                    FOR
                                                                    MarquetteProperties

                                                                    M2383–RevisionD
                                                                    
                                                                    JF&PConsultingEngineersPtyLtd
                                                                    Preparedby:AlexFacchin
                                                                    Approvedby:AndrewFraser

    BRISBANEJFPHouse                                      SUNSHINECOAST                                               CENTRALQUEENSLAND       
    76ErnestStreet,SouthBrisbane                          237239BradmanAvenue,Maroochydore                       59GoondoonStreet,Gladstone
    POBox3634,SouthBrisbaneQld4101                      POBox6MaroochydoreQld4558                              POBox172,GladstoneQld4680
    P0738447161F38461959                              P0754432500F0754434759                             P0749722100F0749725444    
    JONESFLINT&PIKEPTY.LTD.ABN79050414045JF&PCONSULTINGENGINEERSPTY.LTD.ABN77050414036MEMBERSHIPS.UDIA.PCA.PIA.UDAL.SSSI.RPECQ.AILA.WEBSITE.WWW.JFP.COM.AU

      


[OCR of page images]
eo
— VT RECISION

  

TIRANA
URBANCONSULTANTS

aa az

ee
9m el aa
“SURVEYORS

LO \ Fea
: LANDSCAPE ARCHITECTS

 

SITE BASED STORMWATER
MANAGEMENT PLAN

 

PROPOSED DEVELOPMENT AT
37 Gibson Road, Noosaville
FOR

Marquette Properties

 

M2383 — Revision D

 

JF&P Consulting Engineers Pty Ltd
Prepared by: Alex Facchin
Approved by: Andrew Fraser

 

 

BRISBANE - JFP House SUNSHINE COAST CENTRAL QUEENSLAND

URBAN DESIGNERS 76 Ernest Street, South Brisbane 237-239 Bradm

WA SURVEYORS PO Box 3634, South Brisbane Qld 4101 PO Box 6 Maroochy
OO P07 38447161 F 3846 1959 P07 5443 2500 FO
ENGINEERS

  

    

59 Goondoon Street, Gladstone
PO Box 172, Gladstone Qld 4680

 

P07 4972 2100 F07 4972 5444

IMI LANDSCAPE ARCHITECTS JONES FLINT & PIKE PTY.LTD. ABN 79 050 414 045 JF&P CONSULTING ENGINEERS PTY.LTD. ABN 77 050 414 036 MEMBERSHIPS. UDIA. PCA. PIA. UDAL. SSSI. RPECQ. AILA. WEBSITE. WWW.JFP.COM.AU

Page 3





TABLEOFCONTENTS
1.0 INTRODUCTION....................................................................................................................................................5
2.0 SITECHARACTERISTICS.........................................................................................................................................5
    2.1 LOCATION.........................................................................................................................................................5
    2.2 TOPOGRAPHYANDSITEDRAINAGE.................................................................................................................5
3.0 WATERQUANTITY................................................................................................................................................6
    3.1 INTRODUCTION................................................................................................................................................6
    3.2 CATCHMENTS...................................................................................................................................................6
    3.3 COEFFICIENTOFRUNOFF................................................................................................................................6
    3.4 TIMEOFCONCENTRATION...............................................................................................................................6
    3.5 RAINFALLINTENSITIES......................................................................................................................................7
    3.6 FLOWS(UNMITIGATED)....................................................................................................................................7
    3.7 COMPARISONOFFLOWS.................................................................................................................................7
4.0 CONSTRUCTIONPHASEWATERQUALITYMANAGEMENT...................................................................................8
    4.1 POLLUTANTS.....................................................................................................................................................8
    4.2 POTENTIALIMPACTS........................................................................................................................................8
    4.3 PERFORMANCEOBJECTIVESANDINDICATORS................................................................................................8
    4.4 MONITORINGANDMAINTENANCE..................................................................................................................9
    4.5 RESPONSIBILITYANDREPORTING....................................................................................................................9
5.0 OPERATIONALPHASEWATERQUALITYMANAGEMENT....................................................................................10
    5.1 INTRODUCTION..............................................................................................................................................10
    5.2 POLLUTANTS...................................................................................................................................................10
    5.3 OBJECTIVES.....................................................................................................................................................10
    5.4 STORMWATERQUALITYTREATMENTTRAIN.................................................................................................11
    5.5 MAINTENANCE...............................................................................................................................................11
    5.6 MUSICCATCHMENTPARAMETERS................................................................................................................12
    5.7 MUSICSOURCENODEPARAMETERS.............................................................................................................12
    5.8 MUSICRAINFALLPARAMETERS......................................................................................................................13
    5.9 MUSICTREATMENTNODEPARAMETERS.......................................................................................................13
    5.10 MUSICMODEL............................................................................................................................................14
    5.11 MUSICRESULTS..........................................................................................................................................14
6.0 CONCLUSION......................................................................................................................................................15
7.0 APPENDIXA........................................................................................................................................................16




    SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD                         37GibsonRoad,Noosaville                                                            Page 3



[OCR of page images]
———4
Zar
AUR

URBANCONSULTANTS

1.0 INTRODUCTION ..0...c ccc cece ccesccecsceeceecseeessecessecsececsecsesesesseseseecsesessecseecseceeseseeseesessassecessecsssessessaes ceseseeseesaseeseaees 5
2.0 SITE CHARACTERISTICS ......cccccsescsssscessssesccecsecsesecsecsesscsessscessesseecsessesecsscesecsesesseseessseessecessecescesseseeseseeseesisesseeesseees 5
2.1 LOCATION .0...ceccecccceececeeccecsceessecsesecsececsecsesecseceeeessasseessessesessecsesessesecseseasessassececsecsecessecsesesses ceessesaeeesseeaseeseneas 5
2.2 TOPOGRAPHY AND SITE DRAINAGE ..........cccccccecssscsesscssesesscsessceesseseseecsecessecsececsecsssessassesesessesesseesesessneeseeseasenes 5

3.0 WATER QUANTITY ....

 

B.D INTRODUCTION .... occ ccccceccccceecccscsecsececsecsesecsesseeessesseessessesecseceesessesseessassseessecsesecseseaseseeseseseessseesscessecaesessnsegs 6
3.2 CATCHMENTS ou... ccccccecscesscscssesssecseescsecsesecsesececsecsssessececsessesecsecsesessesseessasssessecessesseeesseceeseseeseeseseceeeesseesseeseneass 6
3.3. CO-EFFICIENT OF RUNOFF...

 

3.4 TIME OF CONCENTRATION........ccccccceccscecescsecseeecsececsecsececsecseessesecessessecessecessesseceesessaseseeseeseseeseeeessesseeessesasenses 6
3.5 RAINFALL INTENSITIES .......cccccccccsescsecscsecseseceessecsseessecsssecsececsecsesesseseesessessesessecsesecsesesseseesseeeseessesessecssecinecesees 7
3.6 FLOWS (UNMITIGATED)... eee een etree teens nene nese neeeseseseeneseeneeeseseneseneseseesessenes seeseeeeneneeenege 7
3.7 COMPARISON OF FLOWS .......ccccccccccsscsssscessscesssecsceecsecsesecsececsscsesessessesessessccessecsesecsessasesseseseessassesessessssesseeeseness 7
4.0 CONSTRUCTION PHASE WATER QUALITY MANAGEMENT .........ccccccccescecceessesseceseecsecesecseeesseseseeseesseeeseseseesseees 8
4.1 POLLUTANTS 20... .cecccccceccsecscesceecsececeesseesssecsesecseceaecsessesessassecessecsesecsesseecseseseessessseessessssessssecseeaes seeseeeeseesaseeseeees 8
4.2 POTENTIAL IMPACTS ......cccccccesseseseesssecsesecsecscsecsesesecsesessessececsecsesecsecessesseseseessessasessessssesssceeseceeseseeseeseseeseeeseeees 8

4.3, PERFORMANCE OBJECTIVES AND INDICATORS...

 

4.4 MONITORING AND MAINTENANCE.........cccccccceccscsceescesseeecsecsesecsececsecsesesecsesessessecessecsecesseseeseseeseeseseesseeassesaseese 9
4.5 RESPONSIBILITY AND REPORTING 2.00... cccccssscssescescseesssessecsssecseecseceesecseseeseseessecessecsesesseseeseseeseeseseessesessesaseess 9
5.0 OPERATIONAL PHASEWATER QUALITY MANAGEMENT ........ccccccccccescsecseesseescsecsecscsecseseseessesssessasseeessesseessneese 10
5.1 INTRODUCTION ou... ecccceccecceecsecseeecsecsesecsecsesessessccsssesscessasscsecsecsssessesessssasseeessesseessesesseseeseseeseasisecsseesessaees 10
5.2 POLLUTANTS 1.00. .ccccccccccscesceesscceseecsececsecsesecsecsesessessesessesseessecsesecsessasessesssessesseeessecsesecsessssecsesessess cesesseeesseeaeeess 10
5.3 OBJECTIVES 2.0... ccccceccseccescsssscesssecsesessecsesecsececsecsesecsecsessssessecessecsesecsscseseseesessesssssecessessecessesssseses seseseesseeesseeaseese 10
5.4. STORMWATER QUALITY TREATMENT TRAIN .......c.cccccecssescesceeeseesseceseecsesessecseeessecseeseeseesessessesesseseseesseeesatea 11
5.5 MAINTENANCE uc. ccecccesccecsceessecseeecsecsesecsecsesessesscessessesecsecscsecsesessessessseessesseessessesessuceuseseeseseseasesseseseseesaneess 11
5.6 MUSIC CATCHMENT PARAMETERS ........ccccccccescesssseseeeesececsecsececsecsessceseesseeesseceesessesessecseseseeseasseeessessesesseeeseesea 12
5.7, MUSIC SOURCE NODE PARAMETERS .........ccccccsssscssesesscssescsecseceseessecessessecessecsseessecseeeseeseesessesseeessesessecsessaeeses 12

5.8 MUSIC RAINFALL PARAMETERS...

 

5.9 MUSIC TREATMENT NODE PARAMETERS. .........cccccccccssescssescesssecscesssesseeecsesessecseeecseseesesesseseseessesesseseseessesesate 13
5.10 = MUSIC MODEL... ececccccccccccsceeesecsesecsecsescsessceessesscsessesseecsessesecseseseesseseseessesessessecssseceeseseeseaseseeseeeeeesaeess 14
5.11 MUSIC RESULTS 00... cccecceccccceecscescseescsecsecscsecsessceessesseecsecsesecseceasessesessessessceessessesessscesseseeseseeseasiseesesseeesaeess 14
6.0 CONCLUSION ..0..ecccecccccccceecsececsecsesscsececscsessseessesesecseceesecsececsecsesesseseessseesseceseecseeessecseseseseesases sesseseciseeseseaseges 15
7.0 APPENDIX A .oo.cceccccceccsccesssecssescseeseecsesecsscsessssessesssessecessecseceeseceeseseesseseseessecsssessecessecseseseseases sesessesesiseeseseasene 16

 

SITE BASED STORMWATER MANAGEMENT PLAN — Revision D 37 Gibson Road, Noosaville 3

Page 4





LISTOFTABLESANDFIGURES

FIGURES
Figure1SiteLocationPlan.........................................................................................................................................5
Figure2–MUSICModelLayout..................................................................................................................................14

TABLES
Table1CatchmentDetails.........................................................................................................................................6
Table2TimeofConcentrationPreDevelopment....................................................................................................6
Table3TimeofConcentrationPostDevelopment..................................................................................................6
Table4RainfallIntensities.........................................................................................................................................7
Table5Flows(Unmitigated)......................................................................................................................................7
Table6ComparisonofFlows.....................................................................................................................................7
Table7ConstructionPhasePollutants.......................................................................................................................8
Table8ConstructionPhasePerformanceCriteria.....................................................................................................9
Table9–OperationalPhasePollutantSources.........................................................................................................10
Table10OperationalPhaseWaterQualityObjectives............................................................................................10
Table11BioRetentionSystemDetails....................................................................................................................11
Table12–SuitableBioRetentionVegetationTypes.................................................................................................11
Table13MUSICCatchmentParameters..................................................................................................................12
Table14MUSICBaseandStormFlowConcentrationParameters..........................................................................12
Table15MUSICRunoffGenerationParameters......................................................................................................12
Table16MUSICBioRetentionSystemParameters.................................................................................................13
Table17MUSICresults............................................................................................................................................14

                                               




    SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD                        37GibsonRoad,Noosaville                                                          Page 4



[OCR of page images]
———4
Zar
AUR

URBANCONSULTANTS

FIGURES

Figure 1 - Site LOCation Plan ......ccceccsccsccssesssesecsecesccsecsecesecsecsessecesecsecsssesesseseescsecaecesesesseseecsecseceesesesseseasesecseeeeeseeaeenees 5
Figure 2 MUSIC Model LayOut......c..cccccccsssssssscsscesecssessessecsecesecsecsecesecsecseseaecsscssecseceesseeceeseeseseeseseesesesaeseaecaeceseaeeaeeees 14
TABLES

Table 1 - Catchment Details 0... ccceeeccesescescescnecseeecseeeeeessesaeecsecaeeecsecaeeessesaeeessesaeaesecseeaseesaeeeseesaseseesaseecaeeaseeeseateetats 6
Table 2 - Time of Concentration - Pre DeVelopMe nt.........ccecccsccsscssceseesecssceseesecescesecseceeceseesesesesecseecseseesseseasesecneeeseeeeee 6

 

Table 3 - Time of Concentration - Post Development..
Table 4 - Rainfall Intensities ...
Table 5 - Flows (Unmitigated) ...
Table 6 - Comparison Of FIOWS ....c..ccccsccssssessecsscsseesecsecsscesscsecesecsecseeceecseceeecaecsecsescsessesesecsecseseseceesescaeseeseasesesneeeseseeceeees 7

 

 

Table 7 - Construction Phase Pollutants........cccecssceeeeesseeseseeseeeeeeseeeceeseeeecsesaeecsecseecseeeeeeceesessesseseeeesaeeaseesieeeseeseneetes 8
Table 8 - Construction Phase Performance Criteria.

 
  

Table 9 — Operational Phase Pollutant Sources .
Table 10 - Operational Phase Water Quality Objectives. we we we ceeteeeeeee
Table 11 - Bio-Retention System Details .........ccccccesessessecsscesecnecesecsecsesceecsecseeesecsecsecsseceeseesesecseessecseseescaeeseseeesseseeeoes 11
Table 12 — Suitable Bio-Retention Vegetation TYPe@ .......cccccccsccsecsecesceseessessessecsecssecseseeseseeseceseaecsscesecsesseseeseaeseseseees 11
Table 13 - MUSIC Catchment Parameters
Table 14 - MUSIC Base and Storm Flow Concentration Parameters. we seeeeeeeeee
Table 15 - MUSIC Runoff Generation Parameters.......cccsseecesceeeeeeseseeseseeeeeeeseeseeecseeseeecseceseeseeseeeessesaeeesecaseesesaeeetee
Table 16 - MUSIC Bio-Retention System ParaMeters........ccccccsccsscsceseesscsscsscsseceecssessesseseseeseceesesecseseeseeeseeseeseaeceeeseees
Table 17 - MUSIC results ....eeeeeeceeseseeseeeeseesceeeseeseseceeeecseceeeecsecaesecsecaeeecsecaseessesessessesaesesseeaeeasaeeaeeesaesaseeseeseseeceaeeeateaee

 

 

 

 

SITE BASED STORMWATER MANAGEMENT PLAN ~ Revision D 37 Gibson Road, Noosaville 4

Page 5





1.0 INTRODUCTION

JF&P Consulting Engineers Pty Ltd has been commissioned by Marquette Properties to prepare a Site Based
StormwaterManagementPlanforthesitelocatedat37GibsonRoad,Noosaville.Itisproposedtodevelopthe
siteintoaretail/servicefacilitiesoutletcomprisingeighttenancies.

Thepurposeofthisreportistoinvestigatetheeffectsofthedevelopmentproposalonthestormwaterdrainage
characteristics(waterquantityandquality)ofthesite.

2.0 SITECHARACTERISTICS

2.1      LOCATION

ThesubjectsiteislocatedonLot1onRP802167.AsitelocationplanisshownonFigure1.Thetotalsiteareais
approximately3,860m2.Thesiteiscurrentlybeingusedasaretailplantnurseryoutlet.

2.2      TOPOGRAPHYANDSITEDRAINAGE

The site is relatively flat with grades of approximately 0.5% to 1% sloping from the southern boundary to the
northernboundary.

The existing site car park drains to an internal piped stormwater system which discharges into a Council
stormwaterdrainagepitlocatedwithinGibsonRoadonthewesternsideofthedrivewayentrance.





                                                                                                        
                                                  Figure1SiteLocationPlan
                                     


    SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD     37GibsonRoad,Noosaville                                    Page 5



[OCR of page images]
‘MeN
URBANCONSULTANTS

1.0 INTRODUCTION

 

JF&P Consulting Engineers Pty Ltd has been commissioned by Marquette Properties to prepare a Site Based
Stormwater Management Plan for the site located at 37 Gibson Road, Noosaville. It is proposed to develop the
site into a retail / service facilities outlet comprising eight tenancies.

The purpose of this report is to investigate the effects of the development proposal on the stormwater drainage
characteristics (water quantity and quality) of the site.

2.0 SITE CHARACTERISTICS

 

2.1 LOCATION

 

The subject site is located on Lot 1 on RP 802167. A site location plan is shown on Figure 1. The total site area is
approximately 3,860m2. The site is currently being used as a retail plant nursery outlet.

2.2 TOPOGRAPHY AND SITE DRAINAGE

 

The site is relatively flat with grades of approximately 0.5% to 1% sloping from the southern boundary to the
northern boundary.

The existing site car park drains to an internal piped stormwater system which discharges into a Council
stormwater drainage pit located within Gibson Road on the western side of the driveway entrance.

 

Re ———

Pets RI

   

Figure 1 - Site Location Plan

 

SITE BASED STORMWATER MANAGEMENT PLAN — Revision D 37 Gibson Road, Noosaville Page 5

Page 6





3.0 WATERQUANTITY
3.1      INTRODUCTION

TheRationalMethodFormulawasusedtocalculatethestormwaterrunoffflowsthroughandoffthesiteforthe
Pre,PostandUltimateDevelopmentscenarios.TheRationalMethodformulaisasfollows.

Q=CIA/360Where, Q=PeakFlowRate(m3/s)
 C=RunoffCoefficient
                            A=AreaofCatchment(ha)
                           I=RainfallIntensity(mm/hr)

3.2      CATCHMENTS

Thepreandpostdevelopmentscenarioswereanalysedasasinglesiteduetothelargeimperviousareas(preand
post)andoutfalllocations.Detailsonthepreandpostdevelopmentcatchmentsaretabulatedbelow.

                                              Table1CatchmentDetails
                                PreDevelopmentArea       PreDevelopment       PostDevelopmentArea       PostDevelopment
               Catchment
                                         (ha)             FractionImpervious             (ha)              FractionImpervious

                    A                   0.386                    0.9                      0.386                        0.9

3.3      COEFFICIENTOFRUNOFF

ForthePreDevelopmentscenarioaC10valueof0.88(fractionimperviousof0.9)wasassumedfortheexisting
retailusefromTable4.05.3(a),QUDM,2ndEdition,2007.

ForthePostDevelopmentscenarioaC10valueof0.88(fractionimperviousof0.9)wasassumedforthedevelopment
fromTable4.05.3(a),QUDM,2ndEdition,2007.

3.4      TIMEOFCONCENTRATION

Fortheundevelopedcatchment,thetimeofconcentrationwasdeterminedfromstandardinlettimesandpipe
velocitiesfortheremaininglengthofflow(Table4.06.1,4.06.5&Section4.06.9,QUDM,2ndEdition,2007).

                                Table2TimeofConcentrationPreDevelopment
                            StandardInletTime
           Catchment                              PipeFlowLength(m)    PipeVelocity(m/s)    PipeTime(mins)         Totaltc(mins)
                                  (mins)

               A                   5                     40                     2.0                     0.33                 5.33
                                                           
For the developed catchment, the time of concentration was determined from standard inlet times and pipe
velocitiesfortheremaininglengthofflow(Table4.06.1,4.06.5&Section4.06.9,QUDM,2ndEdition,2007).

                                Table3TimeofConcentrationPostDevelopment
                            StandardInletTime
           Catchment                              PipeFlowLength(m)    PipeVelocity(m/s)    PipeTime(mins)         Totaltc(mins)
                                  (mins)

               A                   5                     50                     2.0                     0.42                 5.42



    SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD            37GibsonRoad,Noosaville                                                     Page 6



[OCR of page images]
———4
Zar
AUR

URBANCONSULTANTS

3.1 INTRODUCTION

 

The Rational Method Formula was used to calculate the stormwater runoff flows through and off the site for the
Pre, Post and Ultimate Development scenarios. The Rational Method formula is as follows.

Q=CIA/ 360 Q = Peak Flow Rate (m?/s)

C = Runoff Co-efficient

A = Area of Catchment (ha)

| = Rainfall Intensity (mm/hr)

Where,

3.2. CATCHMENTS

 

The pre and post development scenarios were analysed as a single site due to the large impervious areas (pre and
post) and outfall locations. Details on the pre and post development catchments are tabulated below.

Table 1 - Catchment Details

 

 

 

 

 

 

ann , Pre Development Area Pre Development Post Development Area Post Development
‘atchmen
(ha) Fraction Impervious (ha) Fraction Impervious
A 0.386 0.9 0.386 0.9

 

 

 

3.3. CO-EFFICIENT OF RUNOFF

 

For the Pre Development scenario a Cio value of 0.88 (fraction impervious of 0.9) was assumed for the existing
retail use from Table 4.05.3 (a), QUDM, 2” Edition, 2007.

For the Post Development scenario a Cio value of 0.88 (fraction impervious of 0.9) was assumed for the development
from Table 4.05.3 (a), QUDM, 2" Edition, 2007.

3.4 TIME OF CONCENTRATION

 

For the undeveloped catchment, the time of concentration was determined from standard inlet times and pipe
velocities for the remaining length of flow (Table 4.06.1, 4.06.5 & Section 4.06.9, QUDM, 2"! Edition, 2007).

Table 2 - Time of Concentration - Pre Development

Standard Inlet Time
(mins)

 

Catchment Pipe Flow Length (m) Pipe Velocity (m/s) Pipe Time (mins) Total t. (mins)

 

A 5 40 2.0 0.33 5.33

 

 

 

 

 

 

 

 

For the developed catchment, the time of concentration was determined from standard inlet times and pipe
velocities for the remaining length of flow (Table 4.06.1, 4.06.5 & Section 4.06.9, QUDM, 2"! Edition, 2007).

Table 3 - Time of Concentration - Post Development
Standard Inlet Time
(mins)

A 5 50 2.0

 

Catchment Pipe Flow Length (m) Pipe Velocity (m/s) Pipe Time (mins) Total t, (mins)

 

0.42 5.42

 

 

 

 

 

 

 

 

 

SITE BASED STORMWATER MANAGEMENT PLAN — Revision D 37 Gibson Road, Noosaville 6

Page 7





3.5      RAINFALLINTENSITIES

TherainfallintensitiesforthePreandPostDevelopmentScenariosweredeterminedfromtheIFDchartforthe
NoosaRegioncalculatedfromAR&R,1987.

                                            Table4RainfallIntensities
           TimeofConcentration   1yearARI       2yearARI     5yearARI       10yearARI    20yearARI      50yearARI    100yearARI
                   (mins)           (mm/hr)          (mm/hr)        (mm/hr)          (mm/hr)        (mm/hr)          (mm/hr)         (mm/hr)


                      5.33         126.20           159.47          196.90           217.61           246.74         285.14          314.27
                      5.42         125.46           158.55          195.78           216.39           245.36         283.56          312.53


3.6      FLOWS(UNMITIGATED)

TheflowcalculatedforthePreandPostDevelopmentScenariosforarangeofstormeventsistabulatedbelow.

                                          Table5Flows(Unmitigated)
                                                      Q1            Q2             Q5          Q10           Q20            Q50          Q100
         Scenario                                     3              3               3            3              3               3             3
                                                     (m /s)        (m /s)         (m /s)      (m /s)        (m /s)         (m /s)       (m /s)
         PreDevelopment                           0.095          0.128      0.177           0.205        0.243          0.306        0.337
         PostDevelopment                          0.094          0.128      0.176           0.204        0.242          0.304        0.335


3.7      COMPARISONOFFLOWS

Thereisnonetincreaseinflowduetotheproposeddevelopmentastabulatedbelow.

                                           Table6ComparisonofFlows

                                                   Q1          Q2            Q5             Q10           Q20            Q50                3
          Scenario                                 3            3              3               3              3               3          Q100(m /s)
                                                  (m /s)      (m /s)        (m /s)         (m /s)        (m /s)         (m /s)


          PreDevelopment                    0.095           0.128         0.177          0.205         0.243         0.306          0.337

          PostDevelopment                   0.094           0.128         0.176          0.204         0.242         0.304          0.335

          ToBeDetained                     0.001          0.000         0.001         0.001       0.001         0.002        0.002

A rational method analysis of pre and post development scenarios concludes that no net increase in peak
stormwater flows will occur as a result of the proposed development. On site detention storage will not be
requiredtoensurenonetincreaseinpostdevelopmentdischargetothestreetdrainagenetworkwithinGibson
RoadandSkipperPlace.




    SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD                37GibsonRoad,Noosaville                                                          Page 7



[OCR of page images]
————4

URBANCONSULTANTS

3.5 RAINFALL INTENSITIES

The rainfall intensities for the Pre and Post Development Scenarios were determined from the IFD chart for the
Noosa Region calculated from AR&R, 1987.

 

 

 

 

 

 

Table 4 - Rainfall Intensities
Time of Concentration 1 year ARI 2 year ARI 5 year ARI 10 year ARI 20 year ARI 50 year ARI 100 year ARI
(mins) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr) (mm/hr)
5.33 126.20 159.47 196.90 217.61 246.74 285.14 314.27
5.42 125.46 158.55 195.78 216.39 245.36 283.56 312.53

 

 

 

 

 

 

 

3.6 FLOWS (UNMITIGATED)

The flow calculated for the Pre and Post Development Scenarios for a range of storm events is tabulated below.

 

 

 

 

Table 5 - Flows (Unmitigated)
a Qi Q2 Qs aio Q20 Q50 Q100
(m*/s) (m*/s) (m*/s) (m*/s) (m*/s) (m*/s) (m*/s)
Pre Development 0.095 0.128 0.177 0.205 0.243 0.306 0.337
Post Development 0.094 0.128

 

 

 

 

0.176 0.204 0.242 0.304 0.335

 

 

 

 

 

3.7. COMPARISON OF FLOWS
There is no net increase in flow due to the proposed development as tabulated below.

Table 6 - Comparison of Flows

 

Scenario oe or oF

 

 

 

 

cfs) | (ms) | mls) | tls) | (mls) | (mifay | 200078)
Pre Development 0.095 0.128 0.177 0.205 0.243 0.306 0.337
Post Development 0.094 0.128 0.176 0.204 0.242 0.304 0.335
To Be Detained -0.001 0.000

 

 

 

 

 

-0.001 | -0.001 | -0.001 | -0.002 -0.002

 

 

 

 

A rational method analysis of pre and post development scenarios concludes that no net increase in peak
stormwater flows will occur as a result of the proposed development. On site detention storage will not be

required to ensure no net increase in post development discharge to the street drainage network within Gibson
Road and Skipper Place.

SITE BASED STORMWATER MANAGEMENT PLAN — Revision D 37 Gibson Road, Noosaville

Page 8






4.0 CONSTRUCTIONPHASEWATERQUALITYMANAGEMENT

4.1      POLLUTANTS

Typicalpollutantsgeneratedduringtheconstructionphaseofthedevelopmentareshownbelow(GoldCoastCity
Council,2005).

                                     Table7ConstructionPhasePollutants
                 Pollutant                PotentialSource                                       Priority
                                           Paper, construction packaging, food packaging,
                 Litter                                                                           High
                                           cementbags,offcuts
                                           Unprotected exposed soils and stockpiles during
                 Sediment                                                                         High
                                           earthworksandbuildingworks
                                           Fuel and Oil spills, leaks from construction
                 Hydrocarbons                                                                     High
                                           equipmentandtemporarycarparkareas
                                           CementSlurry,asphaltprimer,solvents,cleaning
                 ToxicMaterials                                                                  Medium
                                           agents,washwaters(eg.fromtileworks)
                 Alkalinesubstances     Cementslurryandwashwaters                           High



4.2      POTENTIALIMPACTS

The addition of coarse / fine sediments and other pollutants to stormwater runoff from the development sites
may increase nutrient loads of receiving water, potentially resulting in eutrophication. Impacts on the
surroundingenvironmentwillbeminimisedduringtheconstructionphasewithmeasuresasoutlinedinthisSite
BasedStormwaterManagementPlanandErosionandSedimentControlPlanstobeprovidedattheoperational
worksstage.


4.3      PERFORMANCEOBJECTIVESANDINDICATORS

Theamountofrunoffcrossingandleavingthesiteshouldbekepttoaminimumduringtheconstructionphase.
Thiswillrestrictsoilerosionandmobilisationofsedimentsandpollutantsthroughandoffthesite.

Stormwaterrunoffatdischargepointsduringtheconstructionphaseshallconformtotheperformancecriteriaas
tabulatedbelow(GoldCoastCityCouncil,2005).
                                  




    SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD     37GibsonRoad,Noosaville                                 Page 8



[OCR of page images]
JF

AU
URBANCONSULTANTS

 

4.1 POLLUTANTS

 

Typical pollutants generated during the construction phase of the development are shown below (Gold Coast City
Council, 2005).

Table 7 - Construction Phase Pollutants

 

Pollutant Potential Source Priority

 

. Paper, construction packaging, food packaging, |
Litter High
cement bags, off-cuts

 

. Unprotected exposed soils and stockpiles during .
Sediment a High
earthworks and building works

 

Fuel and Oil spills, leaks from construction .
Hydrocarbons . High
equipment and temporary carpark areas

 

. | Cement Slurry, asphalt primer, solvents, cleaning .
Toxic Materials Medium

agents, washwaters (eg. from tile works)

 

Alkaline substances | Cement slurry and washwaters High

 

 

 

 

 

4.2 POTENTIAL IMPACTS

 

The addition of coarse / fine sediments and other pollutants to stormwater runoff from the development sites
may increase nutrient loads of receiving water, potentially resulting in eutrophication. Impacts on the
surrounding environment will be minimised during the construction phase with measures as outlined in this Site
Based Stormwater Management Plan and Erosion and Sediment Control Plans to be provided at the operational
works stage.

4.3. PERFORMANCE OBJECTIVES AND INDICATORS

 

The amount of runoff crossing and leaving the site should be kept to a minimum during the construction phase.
This will restrict soil erosion and mobilisation of sediments and pollutants through and off the site.

Stormwater runoff at discharge points during the construction phase shall conform to the performance criteria as
tabulated below (Gold Coast City Council, 2005).

 

SITE BASED STORMWATER MANAGEMENT PLAN — Revision D 37 Gibson Road, Noosaville 8

Page 9





                                     Table8ConstructionPhasePerformanceCriteria
                        Pollutant                       PotentialSource

                        TotalSuspendedSolids          90thPercentile<50mg/L

                        pH                              6.5–9.0

                        DissolvedOxygen                90thPercentile>80%saturationor6mg/L

                        Hydrocarbons                    Novisiblesheenonreceivingwaters

                        Litter                          Novisiblelitterwashedfromsite


4.4       MONITORINGANDMAINTENANCE

Thegeneralrequirementofmonitoringduringtheconstructionphasewillbe:

    ƒ Workactivitiesarerestrictedtodesignatedconstructionareas
    ƒ EarthworksandsiteclearingareundertakeninaccordancewiththeErosionandSedimentControlPlans
    ƒ Erosionandsedimentcontroldevicesaretobeconstructed/installedinaccordancewiththeErosionand
       SedimentControlPlans
    ƒ Inspectionofsedimentfencesanderosionandsedimentcontrolstructures/devicesonaweeklybasisas
       wellasafteranyraineventexceeding25mmin24hrs
    ƒ Stormwaterdischargesfromthesitearenothavinganyadverseaffectonthedownstreamenvironment
    ƒ Monitoring and recording of the performance of the drainage control devices including water quality
       testingwhererequired
    ƒ Any failure in the stormwater system shall be immediately rectified to prevent uncontrolled discharge
       fromthesite
    ƒ Any failure to the stormwater system causing damage to surroundings should implement immediate
       remedialworktothedamagedarea


4.5       RESPONSIBILITYANDREPORTING

      ƒ    Thecontractorshallberesponsibleformonitoringtheperformanceofalldrainagecontrolanderosion
           andsedimentcontroldevices
      ƒ    RecordsofanyfailurestodevicesshouldbekeptandreportedtotheConstructionManager
      ƒ    RegularinspectionsofthedevicesshallbereportedtotheConstructionManager
      ƒ    InspectionsofthedevicesafterheavyrainfallshallbereportedtotheConstructionManager
                                     




    SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD      37GibsonRoad,Noosaville                            Page 9



[OCR of page images]
4.4

JF

AU
URBANCONSULTANTS

 

Table 8 - Construction Phase Performance Criteria

 

 

 

 

 

 

Pollutant Potential Source

Total Suspended Solids 90" Percentile < 50mg/L

pH 6.5-9.0

Dissolved Oxygen 90" Percentile > 80% saturation or 6mg/L
Hydrocarbons No visible sheen on receiving waters
Litter No visible litter washed from site

 

 

 

 

MONITORING AND MAINTENANCE

 

The general requirement of monitoring during the construction phase will be:

4.5

Work activities are restricted to designated construction areas

Earthworks and site clearing are undertaken in accordance with the Erosion and Sediment Control Plans
Erosion and sediment control devices are to be constructed/installed in accordance with the Erosion and
Sediment Control Plans

Inspection of sediment fences and erosion and sediment control structures/devices on a weekly basis as
well as after any rain event exceeding 25mm in 24hrs

Stormwater discharges from the site are not having any adverse affect on the downstream environment
Monitoring and recording of the performance of the drainage control devices including water quality
testing where required

Any failure in the stormwater system shall be immediately rectified to prevent uncontrolled discharge
from the site

Any failure to the stormwater system causing damage to surroundings should implement immediate
remedial work to the damaged area

RESPONSIBILITY AND REPORTING

 

The contractor shall be responsible for monitoring the performance of all drainage control and erosion
and sediment control devices

Records of any failures to devices should be kept and reported to the Construction Manager

Regular inspections of the devices shall be reported to the Construction Manager

Inspections of the devices after heavy rainfall shall be reported to the Construction Manager

 

SITE BASED STORMWATER MANAGEMENT PLAN — Revision D 37 Gibson Road, Noosaville 9

Page 10





5.0 OPERATIONALPHASEWATERQUALITYMANAGEMENT

5.1      INTRODUCTION

Inrecentyearstherehavebeenanincreasingnumberofinitiativestomanagetheurbanwatercycleinamore
sustainable way. The integration of the urban water cycle within the concept of Ecologically Sustainable
Development(ESD)istermedWaterSensitiveUrbanDesign(WSUD).AWSUDtreatmenttrainconsistingofthree
separate bioretention systems / rain gardens has been proposed to treat all stormwater flows from the
operationalphaseofthedevelopment.


5.2      POLLUTANTS

Pollutantstypicallygeneratedbyduringtheoperationalphaseofthedevelopmentareshownbelow(GoldCoast
CityCouncil,2005).
                                  Table9–OperationalPhasePollutantSources
                     Pollutant                               PotentialSource
                                                              Construction packaging, construction
                     Litter
                                                              wastematerials,paper,foodpackaging
                     Sediment                                Exposedsoilsandstockpiles
                     Oxygendemandingsubstances
                                                              Organicorchemicalmatter
                     (organic&chemicalmatter)
                     Nutrients                               Nitrogen,phosphorus
                     Pathogens/Faecalcoliforms
                                                              Sewage
                     (bacteria&viruses)
                     Heavymetals(oftenassociated
                                                              Sedimentrunoff
                     withfinesediment)
                     Surfactants(eg.detergentsfrom
                                                              Detergents,cleansingagents
                     carwashing)


5.3      OBJECTIVES

Table 10 outlines the stormwater pollutant reductions required for the subject site as stipulated within the
Healthy Waterways ‘Water Sensitive Urban Design Technical Design Guidelines for South East Queensland –
Version1’.TheobjectivesdetailedinTable10alsocomplywiththeoutcomesoftheWaterSensitiveDesignCode
oftheSunshineCoastRegionalCouncil(NoosaPlan).
                               Table10OperationalPhaseWaterQualityObjectives
                         Pollutant                                PollutantReduction
                            SuspendedSolids                                         80%
                            TotalPhosphorus                                         60%
                            TotalNitrogen                                           45%




    SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD   37GibsonRoad,Noosaville                                 Page 10



[OCR of page images]
JF

AU
URBANCONSULTANTS

 

5.1 INTRODUCTION

 

In recent years there have been an increasing number of initiatives to manage the urban water cycle in a more
sustainable way. The integration of the urban water cycle within the concept of Ecologically Sustainable
Development (ESD) is termed Water Sensitive Urban Design (WSUD). A WSUD treatment train consisting of three
separate bio-retention systems / rain gardens has been proposed to treat all stormwater flows from the
operational phase of the development.

5.2. POLLUTANTS

 

Pollutants typically generated by during the operational phase of the development are shown below (Gold Coast
City Council, 2005).
Table 9 — Operational Phase Pollutant Sources

 

 

 

Pollutant Potential Source
Litt Construction packaging, construction
itter
waste materials, paper, food packaging
Sediment Exposed soils and stockpiles

 

Oxygen demanding substances . .
. . Organic or chemical matter
(organic & chemical matter)

 

Nutrients Nitrogen, phosphorus

 

Pathogens / Faecal coliforms
. . Sewage
(bacteria & viruses)

 

Heavy metals (often associated .
a ; Sediment runoff
with fine sediment)

 

Surfactants (eg. detergents from .
Detergents, cleansing agents

 

 

 

car washing)

 

5.3 OBJECTIVES

 

Table 10 outlines the stormwater pollutant reductions required for the subject site as stipulated within the
Healthy Waterways ‘Water Sensitive Urban Design Technical Design Guidelines for South East Queensland —
Version 1’. The objectives detailed in Table 10 also comply with the outcomes of the Water Sensitive Design Code
of the Sunshine Coast Regional Council (Noosa Plan).

Table 10 - Operational Phase Water Quality Objectives

 

 

 

 

Pollutant Pollutant Reduction
Suspended Solids 80%
Total Phosphorus 60%
Total Nitrogen 45%

 

 

 

 

 

SITE BASED STORMWATER MANAGEMENT PLAN ~ Revision D 37 Gibson Road, Noosaville 10

Page 11





5.4      STORMWATERQUALITYTREATMENTTRAIN

AWSUDtreatmenttrainhasbeendevelopedtomeetthereductioncriteriaestablishedinTable10.BioRetention
areas with a total surface / treatment area of 113m2 will be utilised to capture and treat overland flows from
perviousandimperviousareas.HealthyWaterways‘WSUDTechnicalGuidelines’,statesthattoachieveadequate
loadreductiontargets,bioretentionsystemsaretobesizedatapproximately12%ofthecatchmentarea.Table
11providesacatchmentbreakdownforthetotalBioRetentionarea.

                                          Table11BioRetentionSystemDetails
                                                 BioretentionArea           PercentageofCatchment
                     CatchmentArea(ha)                   2
                                                          (m )                          Area(%)
                               0.386                     113                           2.93

ThebioretentionfiltermediashouldbeplantedwithaselectionofthevegetatedtypesasoutlinedinTable12.

                                Table12–SuitableBioRetentionVegetationTypes
                                                                                                           Planting
                                                                                              Height
           ScientificName                         CommonName                  Form                    Density
                                                                                               (mm)
                                                                                                          (Qty/m2)
Myoporumparvifolium                     CreepingBoobialla                   Prostrate 150           46
Cymbopogonrefractus                          BarbedWireGrass                        Tufted       300           810
Dianellacaeruleacv‘LittleJess’            BlueFlaxlily                           Tufted       400           46
Dichelachnecrinita                           LongHairedPlumeGrass                  Tufted       200           68
Erograstiselongatacv‘Elvera’               Elvera                                   Tufted       300           68
Imperatacylindrica                           BladyGrass                              Tufted       500           46
Lepidospermalaterale                         VariableSwordSedge                     Tufted       750           810
Lomandraconfertifoliasubsp                  MattingLomandra                         Tufted       300           46
confertifolia
Lomandraconfertifoliasubsp                  MatRush                                 Tufted       400           46
pallida
Poalabillardierecv‘Eskdale’                Eskdale                                  Tufted       450           68
Themedaaustralis                             KangarooGrass                           Tufted       400           68
Themedaaustraliscv‘Mingo’                  Mingo                                    Tufted       200           810

The plants selected must be able to tolerate periods of inundation and a saturated filter material. Therefore
plants with extensive fibrous root systems are required. Refer to Australian Runoff Quality and BCC WSUD
EngineeringGuidelinesTable12.1foradditionalinformationandsuitableplantvarieties.


5.5      MAINTENANCE

AbioretentionbasinmaintenanceplanwillbeprovidedattheOperationalWorksStage.



    SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD      37GibsonRoad,Noosaville                                    Page 11



[OCR of page images]
JF

AU
URBANCONSULTANTS

 

5.4 STORMWATER QUALITY TREATMENT TRAIN

 

A WSUD treatment train has been developed to meet the reduction criteria established in Table 10. Bio-Retention
areas with a total surface / treatment area of 113m* will be utilised to capture and treat overland flows from
pervious and impervious areas. Healthy Waterways ‘WSUD Technical Guidelines’, states that to achieve adequate
load reduction targets, bio-retention systems are to be sized at approximately 1-2% of the catchment area. Table
11 provides a catchment breakdown for the total Bio-Retention area.

Table 11 - Bio-Retention System Details

Bio-retention Area Percentage of Catchment
(m?) Area (%)

0.386 113 2.93

 

Catchment Area (ha)

 

 

 

 

 

 

The bio-retention filter media should be planted with a selection of the vegetated types as outlined in Table 12.

Table 12 — Suitable Bio-Retention Vegetation Types

 

 

 

 

 

 

 

 

 

 

 

 

 

 

. Planting
ee Height .
Scientific Name Common Name Form nan Density
(Qty/m’)
Myoporum parvifolium Creeping Boobialla Prostrate | 150 4-6
Cymbopogon refractus Barbed Wire Grass Tufted 300 8-10
Dianella caerulea cv ‘Little Jess’ Blue Flax-lily Tufted 400 4-6
Dichelachne crinita Long Haired Plume Grass Tufted 200 6-8
Erograstis elongata cv ‘Elvera’ Elvera Tufted 300 6-8
Imperata cylindrica Blady Grass Tufted 500 4-6
Lepidosperma laterale Variable Sword Sedge Tufted 750 8-10
Lomandra confertifolia subsp Matting Lomandra Tufted 300 4-6
confertifolia
Lomandra confertifolia subsp Mat Rush Tufted 400 4-6
pallida
Poa labillardiere cv ‘Eskdale’ Eskdale Tufted 450 6-8
Themeda australis Kangaroo Grass Tufted 400 6-8
Themeda australis cv ‘Mingo’ Mingo Tufted 200 8-10

 

 

 

 

 

 

The plants selected must be able to tolerate periods of inundation and a saturated filter material. Therefore
plants with extensive fibrous root systems are required. Refer to Australian Runoff Quality and BCC WSUD
Engineering Guidelines Table 12.1 for additional information and suitable plant varieties.

5.5 MAINTENANCE

 

A bio-retention basin maintenance plan will be provided at the Operational Works Stage.

 

SITE BASED STORMWATER MANAGEMENT PLAN — Revision D 37 Gibson Road, Noosaville 11

Page 12





5.6      MUSICCATCHMENTPARAMETERS

Stormwater quality modelling has been undertaken for the proposed development using MUSIC 4.0 software
program. MUSIC is widely accepted as the industry standard for WSUD modelling and is an excellent tool for
comparing treatment train effectiveness. Input parameters for source nodes and treatment devices have been
obtained from BCC’s MUSIC modelling guidelines as well asthe MUSIC Modelling guidelines for SEQ Version 1.
ThemodellayoutisprovidedinFigure2.Detailsoneachcatchment(SourceNode)aredetailedinTable13.

                                      Table13MUSICCatchmentParameters
                                                          Percentage
                    Catchment           Area(ha)                          MUSICSourceNode
                                                          Impervious
                               Roof              0.184               100                        Roof
                            Carpark1            0.089               100                        Road
                            Carpark2            0.076               100                        Road


5.7      MUSICSOURCENODEPARAMETERS

The MUSIC source node parameters were taken from the BCC Guidelines for Pollutant Export Modelling in
Brisbane–Version7.

                         Table14MUSICBaseandStormFlowConcentrationParameters
                                       TotalSuspended      TotalPhosphorus            TotalNitrogen
                                      Solids(Log10mg/L)      (Log10mg/L)              (Log10mg/L)
       LandUse       Parameter
                                       Base      Storm     Base       Storm         Base        Storm
                                       Flow       Flow     Flow        Flow         Flow         Flow
           Urban         Mean              1.00         2.18          0.97          0.47           0.20   0.26
         Residential StdDeviation         0.34         0.39          0.31           0.31            0.20   0.23

                                       Table15MUSICRunoffGenerationParameters
                                             Parameter                  UrbanResidential
                                         FieldCapacity(mm)                              200
                                 InfiltrationCapacityCoefficienta                      211
                                 InfiltrationCapacityCoefficientb                      5.0
                                       RainfallThreshold(mm)                             1
                                         SoilCapacity(mm)                               500
                                          InitialStorage(%)                              10
                                       DailyRechargeRate(%)                             28
                                       DailyBaseflowRate(%)                             27




    SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD       37GibsonRoad,Noosaville                                    Page 12



[OCR of page images]
5.6 MUSIC CATCHMENT PARAMETERS

JFOP

AU
URBANCONSULTANTS

 

Stormwater quality modelling has been undertaken for the proposed development using MUSIC 4.0 software

program. MUSIC is widely accepted as the industry standard for WSUD modelling and is an excellent tool for

comparing treatment train effectiveness. Input parameters for source nodes and treatment devices have been
obtained from BCC’s MUSIC modelling guidelines as well as the MUSIC Modelling guidelines for SEQ Version 1.

The model layout is provided in Figure 2. Details on each catchment (Source Node) are detailed in Table 13.

Table 13 - MUSIC Catchment Parameters

 

 

 

 

 

Catchment Area (ha) Percentage MUSIC Source Node
Impervious
Roof 0.184 100 Roof
Carpark 1 0.089 100 Road
Carpark 2 0.076 100 Road

 

 

 

 

 

5.7 MUSIC SOURCE NODE PARAMETERS

 

The MUSIC source node parameters were taken from the BCC Guidelines for Pollutant Export Modelling in

Brisbane — Version 7.

Table 14 - MUSIC Base and Storm Flow Concentration Parameters

 

 

 

 

Total Suspended Total Phosphorus Total Nitrogen
Solids (Logio mg/L) (Logio mg/L) (Logio mg/L)
Land Use Parameter
Base Storm Base Storm Base Storm
Flow Flow Flow Flow Flow Flow
Urban Mean 1.00 2.18 -0.97 -0.47 0.20 0.26
Residential | Std Deviation 0.34 0.39 0.31 0.31 0.20 0.23

 

 

 

 

 

 

 

 

 

 

Table 15 - MUSIC Runoff Generation Parameters

 

 

 

 

 

 

 

 

 

Parameter Urban Residential

Field Capacity (mm) 200

Infiltration Capacity Coefficient a 211

Infiltration Capacity Coefficient b 5.0
Rainfall Threshold (mm) 1

Soil Capacity (mm) 500

Initial Storage (%) 10

Daily Recharge Rate (%) 28
Daily Baseflow Rate (%) 27

 

 

 

 

 

SITE BASED STORMWATER MANAGEMENT PLAN ~ Revision D 37 Gibson Road, Noosaville 12

Page 13





5.8      MUSICRAINFALLPARAMETERS

NambourmeteorologicaldatawasutilisedfortheMUSICanalysis.Modellingofthesitewasanalysedforaperiod
of10years(1989–1998)usinga6minutetimestepperiod.Averagepotentialevapotranspirationdatahasbeen
takenfromtheMUSICsoftwarepackage.


5.9      MUSICTREATMENTNODEPARAMETERS

RainwaterTanks:

Rainwatertankswithatotalcapacityof20kLaretobeinstalledwithinthedevelopmentsite.Waterfromthe
rainwatertankswillbeutilisedforoutdoorirrigationandwashdownreuseandpotentiallytoiletflush.

BioRetentionSystem/RainGardens:

DetailsoftheproposedbioretentionsystemsareshowninTable16.AppendixAprovidesatypicaldetailfora
bioretentionsystem.

                                Table16MUSICBioRetentionSystemParameters
                           Parameter                     Raingardens         CarparkSystem1 CarparkSystem2

                ExtendedDetentionDepth(m)                  0.25                  0.25            0.25

                       SurfaceArea(m2)                       43                   30               40

         SaturatedHydraulicConductivity(mm/hr)             180                   180             180

                        FilterArea(m2)                       70                   30               40

                        FilterDepth(m)                       0.5                  0.5             0.5

            FilterMedianParticleDiameter(mm)                5                    5               5
                                     




    SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD   37GibsonRoad,Noosaville                                 Page 13



[OCR of page images]
5.8 MUSIC RAINFALL PARAMETERS

JF

AU

 

URBANCONSULTANTS

 

Nambour meteorological data was utilised for the MUSIC analysis. Modelling of the site was analysed for a period

of 10 years (1989 — 1998) using a 6 minute time-step period. Average potential evapo-transpiration data has been

taken from the MUSIC software package.

5.9 MUSIC TREATMENT NODE PARAMETERS

 

Rainwater Tanks:

Rainwater tanks with a total capacity of 20kL are to be installed within the development site. Water from the

rainwater tanks will be utilised for outdoor irrigation and wash down re-use and potentially toilet flush.

Bio-Retention System / Rain Gardens:

Details of the proposed bio-retention systems are shown in Table 16. Appendix A provides a typical detail for a

bio-retention system.

Table 16 - MUSIC Bio-Retention System Parameters

 

 

 

 

 

 

 

 

 

 

 

Parameter Raingardens | Carpark System 1 | Carpark System 2
Extended Detention Depth (m) 0.25 0.25 0.25
Surface Area (m’) 43 30 40
Saturated Hydraulic Conductivity (mm/hr) 180 180 180
Filter Area (m’) 70 30 40
Filter Depth (m) 0.5 0.5 0.5
Filter Median Particle Diameter (mm) 5 5 5

 

 

 

SITE BASED STORMWATER MANAGEMENT PLAN — Revision D

37 Gibson Road, Noosaville

13

Page 14





5.10 MUSICMODEL

TheMUSICmodelanalysedfortheproposeddevelopmentsiteisshowninFigure2.





                                                                                                   
                                                Figure2–MUSICModelLayout

5.11 MUSICRESULTS

TheMUSICpollutantloadreductionsforthesitearedetailedinTable17.

                                            Table17MUSICresults
                                                                                        MUSIC
                                                         RequiredLoad                            Objective
                            Parameter                                                  Results
                                                           reduction                              Achieved
                                                                                       Achieved
                      TotalSuspendedSolids                80.0%                     93.4%         Yes

                         TotalPhosphorus                   60.0%                     80.5%         Yes

                          TotalNitrogen                    45.0%                     45.1%         Yes

                         GrossPollutants                   90.0%                    100.0%         Yes

Table17demonstratesthatthepollutantloadreductionobjectivesforthesitehavebeenachieved.Thewater
qualitydevicesproposedforthesiteareadequateinachievingsatisfactorypollutantlevelsoutputfromthesite.



    SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD    37GibsonRoad,Noosaville                            Page 14



[OCR of page images]
  

JF

 

RAUNT
URBANCONSULTANTS

5.10 MUSIC MODEL

 

The MUSIC model analysed for the proposed development site is shown in Figure 2.

Roof Area 1

G

Rainwater Tank

Rain Gardens Bio-retention 1

Outfall

 

Figure 2 -MUSIC Model Layout

5.11 MUSIC RESULTS

 

The MUSIC pollutant load reductions for the site are detailed in Table 17.

Table 17 - MUSIC results

 

 

 

 

 

MUSIC
Required Load Objective
Parameter . Results .
reduction . Achieved
Achieved

Total Suspended Solids 80.0% 93.4% Yes

Total Phosphorus 60.0% 80.5% Yes

Total Nitrogen 45.0% 45.1% Yes

Gross Pollutants 90.0% 100.0% Yes

 

 

 

 

 

 

Table 17 demonstrates that the pollutant load reduction objectives for the site have been achieved. The water
quality devices proposed for the site are adequate in achieving satisfactory pollutant levels output from the site.

 

SITE BASED STORMWATER MANAGEMENT PLAN — Revision D 37 Gibson Road, Noosaville 14

Page 15





6.0 CONCLUSION

The SBSMP developed by JFP provides significant reductions in post development stormwater runoff pollutant
concentrationsenteringthestreetdrainagenetworkdownstreamwithinGibsonRoadandSkipperPlace.

Toachievetheseimprovementsstormwaterflowsfromroofandcarparkpavementareashavebeendirectedto
rainwater tank and bioretention systems rather than a standard pit and pipe arrangement.  MUSIC modelling
indicatespollutantreductionsintheorderof4593%ofaverageannualloadswhichareinlinewiththeobjectives
specified in Healthy Waterways ‘Water Sensitive Urban Design Technical Design Guidelines for South East
Queensland–Version1’andtheWaterSensitiveDesignCodecomponentoftheSunshineCoastRegionalCouncil
(NoosaPlan).

A rational method analysis of pre and post development scenarios concludes that no net increase in peak
stormwater flows will occur as a result of the proposed development. On site detention storage will not be
requiredtoensurenonetincreaseinpostdevelopmentdischargetothestreetdrainagenetworkwithinGibson
RoadandSkipperPlace.
                                 




    SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD   37GibsonRoad,Noosaville                                 Page 15



[OCR of page images]
JF

AU
URBANCONSULTANTS

 

The SBSMP developed by JFP provides significant reductions in post development stormwater runoff pollutant
concentrations entering the street drainage network downstream within Gibson Road and Skipper Place.

To achieve these improvements stormwater flows from roof and car park pavement areas have been directed to
rainwater tank and bio-retention systems rather than a standard pit and pipe arrangement. MUSIC modelling
indicates pollutant reductions in the order of 45-93% of average annual loads which are in line with the objectives
specified in Healthy Waterways ‘Water Sensitive Urban Design Technical Design Guidelines for South East
Queensland — Version 1’ and the Water Sensitive Design Code component of the Sunshine Coast Regional Council
(Noosa Plan).

A rational method analysis of pre and post development scenarios concludes that no net increase in peak
stormwater flows will occur as a result of the proposed development. On site detention storage will not be
required to ensure no net increase in post development discharge to the street drainage network within Gibson
Road and Skipper Place.

 

SITE BASED STORMWATER MANAGEMENT PLAN ~ Revision D 37 Gibson Road, Noosaville 15

Page 16





7.0 APPENDIXA







    SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD   37GibsonRoad,Noosaville   Page 16



[OCR of page images]
 

URBANCONSULTANTS

7 Ae Ned Ie

 

 

SITE BASED STORMWATER MANAGEMENT PLAN — Revision D 37 Gibson Road, Noosaville Page 16

Page 17

 

Amp'yoaed ISN REZ sen a

   

 

 
   

oroz/ot/tz ava SaILYadOUd JALLINOYVN SDauiHouy javosanva 90 PtP 050 smanononinnnoer SLNVLIANSNOONWSEA
a. ms REZ LONOAVT WALSAS ALITVND Y3ALVM - ATIAVSOON ‘AVO¥ NOSEID LE SHENIONS wan moose eves 00 4 RARE
a) Nall

   

 

001e
SYOATANNS

ms OS oe BE | pd soe
4Id3JDNOD ONIYSSNIONS

SYaNNVId G10 1VYLN3D - LSVOD ANIHSNNS - INVESINA

 

 

(sexu 0002)

 

20.06
ve nosBropun uepebuley uepuebuley

uapuebuley, uapuebuley

B10}§ SBD)
econ suapieBuley au, JO uoqusjeq eu
J8NQ SMO|4 11 SJe|ul pial pesiey

8 AONWNAL ZL AONWNAL 9 AONWNAL G AONWNAL

v AONWNAL

uapiebuley

20.08)

uaprebuley

@ AONWNAL

oo?

youal 11 uoqUa}a,-01g

@
°
3S
8
2
2
s
=
3
g
3
3s

+ AONWNAL

SKIPPER PLACE

uapieBurey

(seq 000 v1)
uel sayemuley
punouBrepun

yes | yes yes HEIS7] eS Hels Hels

youal, Uonuaye.-olg eea'ar

20.06

Yyousl| UOUa}aJ-01g AY! JO Ajoedeg

dd
SUL JEAQ SMO|J J9I]OD O1 SHid JIU] PJal4 Pasiey deo Rtexa

uM aBeuleg Busixy OL Y
yOauUog oO] Wa}sfs ebeutesg ay1S
Z'MS Bulmesg UD UMoYs suapreBuleYy
puy Youad, UOqUAIaL-01g JO s|le}aq :8}0N

dvouw NOS!

 

 

 

Page 18

  
  
  
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 

 
 
 
 

 
  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

amp'lievad o1g EEZIN SWNYN 314
ot0z/60/82 v0 SAILYddOdd JLLAINDYVN SLNVLINSNOONVaUA
SIN anys ‘
: TIVLIG NIGYVONIVY GNV NOINJL3Y-Old - TIAVSOON ‘vou NOSal9 Ze put
w q cMS 8E8cW
SET EST TTT SS SQ
SIN “SLN
WvLAd LAIN! G7a1l4 NSQYVONIVY UVLAd LAIN! G1ala HONSAYL NOILN3LSY-O18
s 8
! !
Y y =
YaAV1 SOVNIVUG By uaAV1d9VNIVEG —+ a
MQ NOW XS y I OX t
\ \ is \ L.
¢AAVT TWNOILISNVYL ROW is MAAVT TWNOILISNVEL IS SY is
~. ANN NS NS ~ X
“LNATWAIND'A G3AOUddY YO Lev en INS TVAINDA GaAONdd¥ YO os *
9LV WIGIa Oldav4 STLXALOIO Weld et REI 9 WIGId Olav 3TLX3L0ID —f. en
SS a pe g
SET tata 0 8 ah 8
aauinoay sv aaa . : a
ONIGTING JOONdHSLYM [: cole
fee
x x
x s JYMWOOGE 4O ALIALLONGNOO OMNVYGAH WNWININ ¥ 3AVH TIVHS ONY x s
3 (uiuig YO WWWZ) SONINSSYOS YO GNVS SYNOD GIqveo TSM 3a TVHS 8
IMI Ry UBAVT SOWNVYG PRIMI IA, MII
—— 9NIdvOSaNV1 Woud TIv4 AO ALIALLONGNOO OMNWYGAH W SAVH TIVHS Y3AVT TWNOILISNVEL SHL —— yuvauvo Woud TIV4
ob" WLS’
SaINVA. ‘ by WULL'O SaINVA. ‘
NOISSG G31IVL3 NI %08 WO’ NOISS G3IVL3d NI
gazis 39 OL 13 INI G1ald %001 WPL ONISSVd % GaziS 38 OL 13 1Ni GTald
WIMALINO.
ONIMOTIOS SHL HIM ATdWOO TIVHS HAV TWNOLLISNVYL SHL 40
ONIGVYO SH “WINALVW GNVS 3SYNOD YO GNVS G3GvYd T13M 38 TVHS
USAVT WWNOILISNVEL
a “SMO 38 AV IVINSLWW SNOSONIS ‘S°Z OL 0'9 fey:
SUN ta SUN
VLAG NACYVONIVY, . Vy 68z1sv UWL3d HONSYL NOILLNSLSY-Old
HLIM SONVGYOOOY NI GAYNSVAIN'%01-%S NIIMLAG JONWY J 1aVLdaOOV
SLIINI G73Id OLN! LOANNOO OL ‘002 NI} SavYD INSINOO OINVDNO ‘SLANI G1Al4 OLN! LO3NNOO OL “002 NI | 3aVYO
WNIWININ GYVONVIS 1'6E%2 SV OL SATOILYVd SOUT WNWININ GUVANVLS }’6E>Z SV OL MOOS HSL NI
did G3LLOIS GALVONYYOD SNSTAHLSA1Od BOS BAOWAY OL GANIIYOS 39 OL SAVH LON S300 TWId3LVW GAA0dddvY ONY Adld GALLO1S GALVONYHOS SNFTAHLIATOd B06
(uiwig'z-wws0'0 3ZIS SIVOLLYWd) %02-%0S GNVS
g (wwgo'0-200'0 AzIS STOLL) %OE> LIS 8
! (wwz00'0> 4ZIS FTVIILYWd) %S1-S AVTO 1
iY 3G CINOM NOILISOdNOD TOS TWOIdAL Y
. SZIS SION Toy.
M3AV1SOWNIVEG a a WidaLvW NAVI SOWNIVUG — a
SNOIMALAG GNV HSIaNy Wows 33Y4 39 GN AYWWOOL 4O ALIALLONGNOO
‘A I SIMNWYGAH W HLIM LNSTVAINDS G3AONdd¥ YO GNVS AWVOT'WWO7 AGNYS A L
N N TIWida LV N N N
WW WW N 5 “ WN Ws Ws N 5
MSAVT TYNOLLISNVEL WNMOKAXAY 8 WISALTHS ONIMOTIOS SHL USAVT TWNOLLISNVYL SNS SRMIOQQ NMOL ALA 8
N XS SN HIM A1d O09 TIVHS TWINALVW H3LTId SH G3LOWdOO ATLHON CNY INS XS XS NO
: Soe oe G3OWId AINSAA 38 TWHS TYALV ALT SHLNIOINO NI SNOAYVOTVS. . t SP ed
LNATWAINDS G3A0NddY YO ° meee noe | NO SNOFOMIS 38 NVO GNV G30VN9 39 T1SHS WINS Mal Td ANS TWAINDA GAAONdd VY YO may : . we : re |
giv WiaIa Di¥avd STLXaLOaS ONS Teh Det Sarg ~ 9LW WIGIG OGY FWLXSLOIO —Fp../ he : myo
: 8  iohenoe | ONIGVYEDS WIYALVAN NAGYVONIVYE 8 NOILNSLAY-O1d
: Soe! SYRESLW oso | ig ig
. fe EMBL oe Ie : ie
aayinoay sv MN
ONIgTING JOONdNALYM —+
[
[
[ I RIA RIAN Ry
\ —— 9NIdvOSaNV1 WON TIv4 —— puvduvo WOud TIv4
| | ‘S3INVA, SSINVA "
SNV1d 3dVOSCNV7 NO STIW130 SNV1d Ad VOSGNV1 NO STIV130
Yad SV GALNV1d 49 OL Yad SV GaLNVId 39 OL
YLNVId OLNI ONINIVEG SMO14 HOIH WON 10S
400¥ WOU AdidNMO 4103LOYd OL YSHLO YO SNOLS

 

 

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.