Skip to the record
Accept no substitutions.

Original source · versioned page text

MCU10/2083 Development Application part 2 - Attachment 7 - Stormwater Management Plan

of 18

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn




5.8      MUSICRAINFALLPARAMETERS

NambourmeteorologicaldatawasutilisedfortheMUSICanalysis.Modellingofthesitewasanalysedforaperiod
of10years(1989–1998)usinga6minutetimestepperiod.Averagepotentialevapotranspirationdatahasbeen
takenfromtheMUSICsoftwarepackage.


5.9      MUSICTREATMENTNODEPARAMETERS

RainwaterTanks:

Rainwatertankswithatotalcapacityof20kLaretobeinstalledwithinthedevelopmentsite.Waterfromthe
rainwatertankswillbeutilisedforoutdoorirrigationandwashdownreuseandpotentiallytoiletflush.

BioRetentionSystem/RainGardens:

DetailsoftheproposedbioretentionsystemsareshowninTable16.AppendixAprovidesatypicaldetailfora
bioretentionsystem.

                                Table16MUSICBioRetentionSystemParameters
                           Parameter                     Raingardens         CarparkSystem1 CarparkSystem2

                ExtendedDetentionDepth(m)                  0.25                  0.25            0.25

                       SurfaceArea(m2)                       43                   30               40

         SaturatedHydraulicConductivity(mm/hr)             180                   180             180

                        FilterArea(m2)                       70                   30               40

                        FilterDepth(m)                       0.5                  0.5             0.5

            FilterMedianParticleDiameter(mm)                5                    5               5
                                     




    SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD   37GibsonRoad,Noosaville                                 Page 13



[OCR of page images]
5.8 MUSIC RAINFALL PARAMETERS

JF

AU

 

URBANCONSULTANTS

 

Nambour meteorological data was utilised for the MUSIC analysis. Modelling of the site was analysed for a period

of 10 years (1989 — 1998) using a 6 minute time-step period. Average potential evapo-transpiration data has been

taken from the MUSIC software package.

5.9 MUSIC TREATMENT NODE PARAMETERS

 

Rainwater Tanks:

Rainwater tanks with a total capacity of 20kL are to be installed within the development site. Water from the

rainwater tanks will be utilised for outdoor irrigation and wash down re-use and potentially toilet flush.

Bio-Retention System / Rain Gardens:

Details of the proposed bio-retention systems are shown in Table 16. Appendix A provides a typical detail for a

bio-retention system.

Table 16 - MUSIC Bio-Retention System Parameters

 

 

 

 

 

 

 

 

 

 

 

Parameter Raingardens | Carpark System 1 | Carpark System 2
Extended Detention Depth (m) 0.25 0.25 0.25
Surface Area (m’) 43 30 40
Saturated Hydraulic Conductivity (mm/hr) 180 180 180
Filter Area (m’) 70 30 40
Filter Depth (m) 0.5 0.5 0.5
Filter Median Particle Diameter (mm) 5 5 5

 

 

 

SITE BASED STORMWATER MANAGEMENT PLAN — Revision D

37 Gibson Road, Noosaville

13
Log in to download the original file

MCU10_2083 Development Application part 2 - Attachment 7 - Stormwater Management Plan.pdf · 2.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.