MCU10/2083 Development Application part 2 - Attachment 7 - Stormwater Management Plan

of 18

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn




6.0 CONCLUSION

The SBSMP developed by JFP provides significant reductions in post development stormwater runoff pollutant
concentrationsenteringthestreetdrainagenetworkdownstreamwithinGibsonRoadandSkipperPlace.

Toachievetheseimprovementsstormwaterflowsfromroofandcarparkpavementareashavebeendirectedto
rainwater tank and bioretention systems rather than a standard pit and pipe arrangement.  MUSIC modelling
indicatespollutantreductionsintheorderof4593%ofaverageannualloadswhichareinlinewiththeobjectives
specified in Healthy Waterways ‘Water Sensitive Urban Design Technical Design Guidelines for South East
Queensland–Version1’andtheWaterSensitiveDesignCodecomponentoftheSunshineCoastRegionalCouncil
(NoosaPlan).

A rational method analysis of pre and post development scenarios concludes that no net increase in peak
stormwater flows will occur as a result of the proposed development. On site detention storage will not be
requiredtoensurenonetincreaseinpostdevelopmentdischargetothestreetdrainagenetworkwithinGibson
RoadandSkipperPlace.
                                 




    SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD   37GibsonRoad,Noosaville                                 Page 15



[OCR of page images]
JF

AU
URBANCONSULTANTS

 

The SBSMP developed by JFP provides significant reductions in post development stormwater runoff pollutant
concentrations entering the street drainage network downstream within Gibson Road and Skipper Place.

To achieve these improvements stormwater flows from roof and car park pavement areas have been directed to
rainwater tank and bio-retention systems rather than a standard pit and pipe arrangement. MUSIC modelling
indicates pollutant reductions in the order of 45-93% of average annual loads which are in line with the objectives
specified in Healthy Waterways ‘Water Sensitive Urban Design Technical Design Guidelines for South East
Queensland — Version 1’ and the Water Sensitive Design Code component of the Sunshine Coast Regional Council
(Noosa Plan).

A rational method analysis of pre and post development scenarios concludes that no net increase in peak
stormwater flows will occur as a result of the proposed development. On site detention storage will not be
required to ensure no net increase in post development discharge to the street drainage network within Gibson
Road and Skipper Place.

 

SITE BASED STORMWATER MANAGEMENT PLAN ~ Revision D 37 Gibson Road, Noosaville 15
Log in to download the original file

MCU10_2083 Development Application part 2 - Attachment 7 - Stormwater Management Plan.pdf · 2.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.