MCU10/2083 Development Application part 2 - Attachment 7 - Stormwater Management Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn
LISTOFTABLESANDFIGURES
FIGURES
Figure1SiteLocationPlan.........................................................................................................................................5
Figure2–MUSICModelLayout..................................................................................................................................14
TABLES
Table1CatchmentDetails.........................................................................................................................................6
Table2TimeofConcentrationPreDevelopment....................................................................................................6
Table3TimeofConcentrationPostDevelopment..................................................................................................6
Table4RainfallIntensities.........................................................................................................................................7
Table5Flows(Unmitigated)......................................................................................................................................7
Table6ComparisonofFlows.....................................................................................................................................7
Table7ConstructionPhasePollutants.......................................................................................................................8
Table8ConstructionPhasePerformanceCriteria.....................................................................................................9
Table9–OperationalPhasePollutantSources.........................................................................................................10
Table10OperationalPhaseWaterQualityObjectives............................................................................................10
Table11BioRetentionSystemDetails....................................................................................................................11
Table12–SuitableBioRetentionVegetationTypes.................................................................................................11
Table13MUSICCatchmentParameters..................................................................................................................12
Table14MUSICBaseandStormFlowConcentrationParameters..........................................................................12
Table15MUSICRunoffGenerationParameters......................................................................................................12
Table16MUSICBioRetentionSystemParameters.................................................................................................13
Table17MUSICresults............................................................................................................................................14
SITEBASEDSTORMWATERMANAGEMENTPLAN–RevisionD 37GibsonRoad,Noosaville Page 4
[OCR of page images]
———4
Zar
AUR
URBANCONSULTANTS
FIGURES
Figure 1 - Site LOCation Plan ......ccceccsccsccssesssesecsecesccsecsecesecsecsessecesecsecsssesesseseescsecaecesesesseseecsecseceesesesseseasesecseeeeeseeaeenees 5
Figure 2 MUSIC Model LayOut......c..cccccccsssssssscsscesecssessessecsecesecsecsecesecsecseseaecsscssecseceesseeceeseeseseeseseesesesaeseaecaeceseaeeaeeees 14
TABLES
Table 1 - Catchment Details 0... ccceeeccesescescescnecseeecseeeeeessesaeecsecaeeecsecaeeessesaeeessesaeaesecseeaseesaeeeseesaseseesaseecaeeaseeeseateetats 6
Table 2 - Time of Concentration - Pre DeVelopMe nt.........ccecccsccsscssceseesecssceseesecescesecseceeceseesesesesecseecseseesseseasesecneeeseeeeee 6
Table 3 - Time of Concentration - Post Development..
Table 4 - Rainfall Intensities ...
Table 5 - Flows (Unmitigated) ...
Table 6 - Comparison Of FIOWS ....c..ccccsccssssessecsscsseesecsecsscesscsecesecsecseeceecseceeecaecsecsescsessesesecsecseseseceesescaeseeseasesesneeeseseeceeees 7
Table 7 - Construction Phase Pollutants........cccecssceeeeesseeseseeseeeeeeseeeceeseeeecsesaeecsecseecseeeeeeceesessesseseeeesaeeaseesieeeseeseneetes 8
Table 8 - Construction Phase Performance Criteria.
Table 9 — Operational Phase Pollutant Sources .
Table 10 - Operational Phase Water Quality Objectives. we we we ceeteeeeeee
Table 11 - Bio-Retention System Details .........ccccccesessessecsscesecnecesecsecsesceecsecseeesecsecsecsseceeseesesecseessecseseescaeeseseeesseseeeoes 11
Table 12 — Suitable Bio-Retention Vegetation TYPe@ .......cccccccsccsecsecesceseessessessecsecssecseseeseseeseceseaecsscesecsesseseeseaeseseseees 11
Table 13 - MUSIC Catchment Parameters
Table 14 - MUSIC Base and Storm Flow Concentration Parameters. we seeeeeeeeee
Table 15 - MUSIC Runoff Generation Parameters.......cccsseecesceeeeeeseseeseseeeeeeeseeseeecseeseeecseceseeseeseeeessesaeeesecaseesesaeeetee
Table 16 - MUSIC Bio-Retention System ParaMeters........ccccccsccsscsceseesscsscsscsseceecssessesseseseeseceesesecseseeseeeseeseeseaeceeeseees
Table 17 - MUSIC results ....eeeeeeceeseseeseeeeseesceeeseeseseceeeecseceeeecsecaesecsecaeeecsecaseessesessessesaesesseeaeeasaeeaeeesaesaseeseeseseeceaeeeateaee
SITE BASED STORMWATER MANAGEMENT PLAN ~ Revision D 37 Gibson Road, Noosaville 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.