Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Approved Plans MCU22-0147

of 72

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
4.0       BUSHFIRE RISK ASSESSMENT
4.1       GENERAL

A bushfire risk assessment for the proposed development has been prepared in general accordance with
the SPP Bushfire (2019) and AS/NZS ISO 31000:2018 – Risk Management Methodology.
The bushfire risk assessment details the likelihood that the proposed development area will be exposed
to radiant heat impact from the confirmed Very High Potential Bushfire Intensity areas depicted on the
Local Hazard Map presented as Figure 3.
According to AS/NZS ISO 31000:2018, a ‘hazard’ is defined as a source of potential harm or a situation
with a potential to cause loss, whereas a ‘risk’ is the chance of something happening that will have an
impact on objectives measured in terms of consequences and likelihood. The SPP Bushfire (2019) refers
to ‘acceptable risk’, ‘tolerable risk’, and ‘intolerable risk’ which are defined below.
         Acceptable risk
A risk that, following an understanding of the likelihood and consequences, is sufficiently low to require
no new treatments or actions to reduce risk further. Individuals and society can live with this risk without
feeling the necessity to reduce the risks any further.
         Tolerable risk
A risk that, following an understanding of the likelihood and consequences, is low enough to allow the
exposure to continue, and at the same time high enough to require new treatments or actions to reduce
risk. Society can live with this risk but believe that as much as is reasonably practical should be done to
reduce the risks further.
         Intolerable risk
A risk that, following an understanding of the likelihood and consequences, is so high that it requires
actions to avoid or reduce the risk. Individuals and society will not accept this risk and measures are to be
put in place to reduce risks to at least a tolerable level.
AS/NZS ISO 31000:2018 defines ‘Likelihood’ as the chance that something might happen. Likelihood can
be defined, determined, or measured objectively or subjectively and can be expressed either qualitatively
or quantitatively (using mathematics). The following ‘likelihood’ categories for the probability of the
assessed bushfire attack mechanisms impacting the assessment area have been adopted within this
assessment:
         Likely - Will probably occur
         Unlikely - Could occur but doubtful
The determination of whether a bushfire event is likely or unlikely to impact the site has been based on
the relative position of hazardous vegetation to the site. The typical fire season in Southeast Queensland
peaks between September and November. During the fire season, hot gusty westerly winds of over
30km/h can be expected, with relative humidity falling below 15%. Typical seasonal fire winds within
south-east Queensland originate from the north-west to west to south-west. Where hazardous vegetation
is located upwind of the site under dominant seasonal fire winds, the site is considered to be exposed to
a likely probability of impact. Where hazardous vegetation is located downwind of the site under typical
seasonal fire winds, the site is deemed to be exposed to an unlikely probability of impact.



JULY 2022                       BUSHFIRE HAZARD ASSESSMENT & MANAGEMENT PLAN                         Page: 16
                                            296 KIDD ROAD, POMONA
Log in to download the original file

Approved Plans MCU22-0147.pdf · 11.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.