Original source · versioned page text
Approved Plans MCU22-0147
The original of this document is very large (11.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSED SOLUTION
Impact on Ecologically Important Areas
PO2 No acceptable outcome provided No vegetation clearing is required to facilitate the
Bushfire mitigation measures do not bushfire mitigation measures detailed in this report
adversely impact on: which could not already legally be undertaken as
a) biodiversity values, connectivity and exempt clearing available under the essential
ecosystem functioning; and management exemption prescribed under the Planning
Regulation 2017.
b) the long term physical integrity of
waterways, wetland and areas of native
vegetation.
Water Supply for Fire Fighting Purposes
PO3 AO3.1 The development complies with AO3.2.
Development provides an adequate Premises are connected to the reticulated water supply.
The site will not be connected to a reticulated water
water supply for firefighting purpose
supply. A permanent dam with volume far in excess of
which is reliable, safely located and freely Editor's note—For reconfiguring a lot, water supply
5,000 litres is located approximately 160m to the east
accessible. needs to provide for a minimum flow and pressure of
of the cottage as a suitable emergency water supply.
10 litres a second at 200kPa at all times for firefighting
purposes.
OR
AO3.2
Where there is no available reticulated water supply,
the premises has:
a) an accessible dam, swimming pool or water tank
available for firefighting purposes with an onsite water
volume of not less than 5,000 litres; and
JULY 2022 BUSHFIRE HAZARD ASSESSMENT & MANAGEMENT PLAN Page: 31
296 KIDD ROAD, POMONA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.