Council archive · source document
Approved Plan OPW20-0072 · OPW20/0072
Plans and drawings: the text below has words only, no drawings.
EX. 300 DIAM. RCP
13.2
13.0
13.4
12.8
-
12.6
.6
13
sign
NOOSA COUNCIL
.8
12.4
13
125°53'30"
Nail 5"
9'0 m
3.414m Ex.Water
14
.0 APPROVED PLAN
RL 12.26 °5
12.2
87 .414
3
14
.2 OPW20/0072 19 MAY 2020
tels
tra
line .4
.0
14
12
3.4 5'15"
wa
ter
14m
line
0
14
50°
4°5
0'
22
.70
8m
.8
11
14.6
Screw
RL 14.63
.6
11 Telstra pit
.4
11
14.6
.2
11
14.4
0
11.
14.2
31°08'15" 17.097m
RESIDENTIAL
DWELLING 14.0
211°08'15"
10.8
12.784m
13.8
REV A
10.6
SMH 13.6
LL10.95
12.6 12.8 13.0 13.2 13.4
11.0
11.2
11.4
11.6
11
12
12
12
10
.8
.2
.0
.4
.8
301°08'15"
10
28.162m
.6
10.
4
A PIPE/KERB POSITIONS REVISED 15/05/2020
Revision Description Date
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title: OPERATIONAL WORKS:
STORMWATER MANAGEMENT PLAN
Project 8 Lorikeet Dr
Peregian Beach
Date: Mar 2020 Drawn: TH Design: TH
Checked: Drg No. Rev.
29228 -SW1.1 A
Rev. - 10.06.16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plan OPW20-0072.pdfRelated documentApplication case desk ↗
About this file
- File size
- 654 KB (small file)
- File type
No other editions are linked here.