Original source · versioned page text
Appendix A - Searches
PAPER SIZE A3 Map has been designed to be reproduced in colour
For Emergency Situations
All underground cables shall be treated as being energised. Where a cable is located that is not represented
on the ENERGEX EnerG/Se DBYD map, then ENERGEX shall be contacted immediately.
4000
4100
U753608
U973-B
[ey
16 |
aH
o&
\ 302239
\U1837052
8400
2t
707 8300m N
89 4000m
This output provides details of the ENERGEX electrical network. As variations may exist no responsibility is incurred by ENERGEX for the
\
e
4100
4200
Please call 13 19 62
8400
8300
UNCONTROLLED COPY —
DBYD
Date: 11 Mar 21 Time: 13.30.05
Requested By: DBYD
SCALE 1:1000
20 ° 20m
Enquiry No: 107512842
STRIP No: 1
‘== Cable Voltage
(A Ground Transformer Less Than $5k
Cubicle Transformer Cable Voltage
33kV or Higher
fm Ring Main Unit
@) Metering Unit © Direer-Lay
Wi Link Pillar Q. Conduit
[Service Pillar Multi-Section
Junction Pillar
i ’ Trench
J Pit
ma Cable Joint Cable Tray
b> Cable Termination [| Wanner
Duct
“Cable Marker
x} Street Light Pole
li Earth
Planned Work
labelled by Work Order
INDEX TO SHEETS
LOCALITY DIAGRAM
\ S a
fo a
-)
/
SS
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.
PAPER SIZE A3 Map has been designed to be reproduced in colour
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.