Other Change Decision Notice - Council Meeting Decision 132007 2446 05 · 132007.2446.05

of 24

Text shows just the words. Original shows the document exactly as it was published.

                                                                                  Officer:            Andrew Gaffney
                                                                                  Direct Telephone:   07 5329 6245
                                                                                  Our Reference:      132007.2446.05
                                                                                  Your Reference:     002662

                 27 August 2025


                 Flashpackers Noosa Pty Ltd Tte
                 C/- RG Strategic Australia
                 PO Box 1818
                 NOOSA HEADS QLD 4567
                 [email protected]



                 Dear Russell,
                                            Decision Notice – Other Change
                                                       Planning Act 2016

                 I refer to your application and advise that on 21 August 2025, Council decided to approve the
                 application, subject to conditions.
                 Details of the decision are as follows:
                 1.      APPLICATION DETAILS

                     Application No:            132007.2446.05

                     Street address:            102 Pacific Ave, Sunshine Beach Qld 4567

                     Real property description: Lot 162 SP 307694

                     Planning Scheme:           Noosa Plan 2020 (25 September 2020)

                 2.      DECISION DETAILS

                 The following type of approval was issued on 17 August 2009.
                 •      Development Permit for Material Change of Use - Visitor Accommodation Type 4 -
                        Conventional (Visitor Hostel)
                 In relation to the request to make an Other Change to the existing approval, Council on 21
                 August 2025, decided to approve the requested changes. The changes are detailed below.
                       A.    Approve the change;
                       B.    Include additional conditions 104 – 123;
                       C.    Note the report is provided in accordance with Section 63(5) of the Planning Act
                             2016, and;
                 3.      CURRENCY PERIOD OF APPROVAL

                 The currency period for this development approval is stated in the conditions below.




                 ABN 97.969.214.121                                                             PO Box 141
                 noosa.qld.gov.au                                                        Tewantin QLD 4565
                 [email protected]                                                        07 5329 6500
                                                                                                            Page 1 of
                  24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025
Full text of the other 23 pages

Page 2

                 4.     ASSESSMENT MANAGER CONDITIONS

                        General
                 1.     Development undertaken in accordance with this approval must generally comply with
                        the approved plans of development. The approved plans are listed in the following
                        table and may be amended by these conditions.

                          Plan No.                  Rev.   Plan / Document Name                 Date

                          09-801 – P7 – S1          G      Site Plan (2 Stages) – Garry 11/11/2009
                                                           Wilbraham Designs

                          07-011 - P4.10            B      Rendered    Views       –    Garry 17/09/2008
                                                           Wilbraham Designs

                          07-011 - P4.11            B      Rendered    Views       –    Garry 17/09/2008
                                                           Wilbraham Designs

                          09-801 – P2 – S3          G      Upper Floor Plan         –   Garry 10/11/2009
                                                           Wilbraham Designs

                          09-801 – P2 – S2          G      Lower Floor Plan         –   Garry 10/11/2009
                                                           Wilbraham Designs

                          07-011 – P3 – S1          B      Elevations – Elevation 1 – Garry 11/09/2008
                                                           Wilbraham Designs

                          07-011 – P3 – S2          C      Elevations – Elevation 2 – Garry 11/06/2009
                                                           Wilbraham Designs

                          07-011 – P1 – S2          C      Site Parking – Garry Wilbraham 16/04/2009
                                                           Designs

                 2.     The development must be undertaken and operated in a manner that causes no
                        detrimental effect upon the amenity of the neighbourhood by reason of the creation of
                        excessive noise, lighting nuisance or other emissions.
                 3.     The premises are to be identified by the provision of a street number in a prominent
                        location to ensure it is identifiable to all persons, particularly emergency services
                        personnel.
                 4.     Alcohol shall not be sold on the premises.
                 5.     Amplified music must not be audible at the boundaries of the site between 10pm and
                        7am.
                 6.     The developer must obtain all of the other Development Permits referred to in the
                        Decision Notice, prior to obtaining a Development Permit for Building Works.
                        Building Design
                 7.     External lighting associated with the use shall be designed, installed, operated and
                        maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of
                        Outdoor Lighting.
                 8.     Additional timber screening shall be incorporated across the northwestern section of the
                        Block A patio to a minimum height of 1.8m high in order to reduce overlooking to the
                        neighbouring property to the north.




                                                                                                       Page 2 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 3

                        Energy Efficiency
                 9.     All hot water systems installed shall be either solar systems; electric heat pump systems;
                        or gas systems (LPG or natural).
                 10.    All new kitchen, laundry and bathroom fittings shall comply with the AAA Water
                        Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products
                        - Rating and Labeling 2003) and AS/NZS 3500 (National Plumbing and Drainage
                        Standard Part 1), with toilets to comply with the AAA Water Conservation Rating System.
                        All new tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
                        Dishwashers and washing machines are excluded from this requirement.
                        End of Trip Facilities
                 11.    Secure bicycle racks shall be provided on site to accommodate a minimum of 12
                        bicycles. The proposed bicycle racks shall be identified on the landscaping plans and
                        shall be located to the reasonable satisfaction of Council.
                        Advertising Signage
                 12.    Any advertising sign or device is to comply with Council's policies on advertising.
                 13.    All signage and entrance statements are to be located entirely within privately owned
                        land.
                        Fencing
                 14.    All fencing shall be setback at least 1 metre from the front property boundary, with at
                        least half of the fencing setback 2 metres. The area of land between the fence and the
                        front property boundary shall be densely landscaped to screen any fencing from the
                        street.
                 15.    Any fencing shall be of timber construction or, where metal, concrete or masonry
                        materials are used, shall include timber koala poles of at least 200mm diameter at
                        minimum centres of 10m to allow for the movement of koalas across the site.
                        Landscaping
                 16.    The open space and setback areas are to be landscaped in accordance with Council’s
                        Policy on Landscaping Guidelines and a properly prepared landscape plan. Such
                        landscaping is to be completed prior to the premises being occupied and maintained at
                        all times thereafter. The Landscape Plan shall include at a minimum:
                        a.      Dense screening vegetation is to be provided within the front setback which will
                                be suitable for planting under power lines in coastal areas.
                        b.      Native screening vegetation a minimum of 1m in width, shall be provided between
                                buildings as well as along the side and rear boundaries.
                        c.      Existing koala habitat trees located along the southern property boundary are to
                                be retained, where practical. If the retention of any of the subject trees is not
                                possible, the applicant is to replant 2 x 45 litre trees along the southern boundary
                                of either Angophora, Corymbia, Eucalyptus, Lophostemon and/or Melaleuca
                                species.
                        d.      Cleared vegetation is to be suitably processed by one of the following methods
                                and removed from the site:
                        e.      Processing through a woodchipper or shredder. The resulting mulch is to be
                                stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres
                                high with a minimum of 10 metres between edges of heaps.
                        f.      Disposal for firewood.
                        g.      Disposal for landscaping purposes.



                                                                                                          Page 3 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 4

                        h.      Transport to alternative site for breaking down materials provided that all
                                necessary permits have been obtained to allow the alternate site to be used for
                                this purpose.
                        i.      The disposal method for clearing works is to be submitted in conjunction with an
                                application for a Development Permit for Operational Work. The Applicant is
                                advised that other methods may be considered provided full details of the method
                                are submitted.
                        The Applicant is advised that burning off is an unacceptable method of disposal.
                        Security Bond
                 17.    Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
                        must be submitted, to secure performance of all conditions of this approval, prior to the
                        issue of a Development Permit for operational works. The cash bond or trading bank
                        guarantee will be returned on performance of the conditions of approval less any costs
                        incurred by Council in respect of enforcing performance of this permit.
                 18.    The requirements of this development approval are to be effected, prior to the use of the
                        premises. Council reserves the right to call upon the bond or guaranteed sum referred
                        to in this approval to effect compliance with conditions.
                        Relevant Period
                 19.    The Development Permit for a material change of use of premises lapses if the use has
                        not happened by 17 August 2013, unless an application to extend the relevant period
                        is approved by Council.
                        Frontage Works
                 20.    Footpath improvements such as topsoiling, grassing, and tree planting are required to
                        the frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping
                        Plants & Guidelines. Grass shall be couch, free of weeds.
                 21.    The applicant shall be responsible for providing an edge-of-road yellow line marking
                        between the proposed Entry and Exit driveways from the site to indicate “No Parking”
                        area. The line marking shall be provided in accordance with Manual of Uniform Traffic
                        Control Devices (MUTCD) Part 3 and shall be indicated on the plans submitted for
                        Development Permit for Operational Works.
                 22.    All paths, ramps, driveways and parking areas shall be designed and constructed to
                        ensure pedestrian safety using non-slip materials, to produce an evenly graded surface
                        finish, and to be in accordance with the Disability Discrimination Act 1992 and Australian
                        Standard 1428.1 Design for Access & Mobility.
                 23.    All redundant vehicular crossings to the site shall be removed and replaced by kerb &
                        channel, footpath paving and landscaping such as trees and grasses in accordance with
                        Council’s Standard specifications prior to commencement of the use permitted by this
                        permit.
                 24.    The applicant shall replace the existing length of the kerb line between the proposed
                        driveways (Entry and Exit).
                        Roof Water & Stormwater Drainage
                 25.    Roof runoff from any new building shall be directed to a rainwater storage system or
                        tank that is installed to ensure water from the rainwater storage system or tank is used
                        for external uses (such as watering gardens, irrigation, ornamental ponds, water
                        features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground
                        floor) use in washing machine cold taps and toilet cisterns. All rainwater tanks are to be
                        designed and installed in accordance with the Queensland Development Code (QDC)
                        current at the time of building approval, and shall be part of the plumbing application for
                        approval. The location and capacity of the tanks shall be clearly shown on the plans
                        submitted for Building Works and Operational Works approval and any overflow shall be

                                                                                                         Page 4 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 5

                        directed to the road frontage/the stormwater drainage system/etc located in Pacific
                        Avenue.
                 26.    All stormwater drainage (including roof water overflow from the rainwater storage
                        system) shall be collected and discharged so there is no net increase in stormwater
                        runoff from the site. Stormwater drainage permitted to drain from the site shall be
                        discharged into Council’s existing drainage structure (drainage pit at the frontage of the
                        site in Pacific Avenue). Plans of the drainage design shall be prepared by a Registered
                        Professional Civil Engineer and submitted to Council prior to obtaining a Development
                        Permit for Operational Works.
                 27.    The applicant shall ensure that the development will not adversely impact on the
                        drainage conditions on other properties. As the there will be significant filling and a
                        potential for obstruction to the natural stormwater runoff from adjoining properties, where
                        applicable appropriate stormwater drainage pipes shall be installed within the site to
                        collect and discharge stormwater runoff from adjoining properties to prevent additional
                        ponding/flooding on other properties or diversion of stormwater runoff onto other
                        properties. A Development Permit for Operational Works shall be required.
                 28.    To ensure that polluted run-off does not enter Council’s stormwater drainage system,
                        stormwater run-off from the carparking areas and the driveways shall have the first flush
                        (the first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant
                        trap provided on site prior to being permitted to discharge into Council’s drainage
                        system.
                        All other clean stormwater, such as roof water, can be collected on site and discharged
                        through a single underground drain line directly into the existing drainage system,
                        bypassing the grease/oil arrestor/gross pollutant trap. To this end, a detailed
                        maintenance plan shall be prepared for the proposed grease/oil arrestors/gross pollutant
                        trap, which shall be submitted to the Council for approval prior to obtaining a
                        Development Permit for Operational Works.
                        The approved maintenance plan shall be incorporated in the on going maintenance
                        scheme for the development and a copy of this shall be provided for Council’s records
                        prior to commencement of the approved Use. A Development Permit for Building Works
                        shall not be granted until a Development Permit for Operational Works has been issued
                        in regard to the drainage scheme.
                 29.    All site stormwater drainage shall be by means of a gravity system.
                        Sewer Mains
                 30.    The site shall be connected to Council’s existing sewerage reticulation systems and be
                        constructed in accordance with Council’s standards and requirements at no cost to
                        Council.
                 31.    The existing sewer main that traverses the site and the sewer main that runs in the
                        adjoining property at the rear of the site and the ‘zone of influence’ (taken as the area
                        within a 45-degree angle measured from the invert of the sewer main to the finished
                        surface level) shall be accurately located and determined by a licensed Surveyor and
                        shown on all plans submitted for Operational Works approval.
                        To ensure Council’s sewer main is accessible for maintenance purposes and is
                        protected from risk of damage no structures requiring a building permit (eg. buildings,
                        swimming pools, retaining walls exceeding 1m in height, raised terraces, etc) shall be
                        constructed within this ‘zone of influence’ or within 1.5m of the centreline of the sewer
                        main, whichever is the greater. As such the applicant shall amend Operational Works
                        plans including Building plans to ensure compliance.
                        Service Easements (Sewer)
                 32.    A registered easement shall be created over the zone of influence of all sewers within
                        the subject site and over those parts of the subject site that are impacted upon by sewers
                        on any adjoining sites. The easements shall generally be parallel to and centred over
                                                                                                           Page 5 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 6

                        the sewer main and be equivalent in width to twice the depth to invert level of the sewer
                        at the deepest point within the allotment (measured from the finished surface) and be
                        no less than 3.0m wide overall. In this regard a licensed surveyor shall accurately locate
                        all sewer mains and determine the necessary width of the easement, which shall be
                        shown on any plans submitted for Operational Works / Building Works approval. To this
                        extent the surveyor shall certify that the sewer and the zone of influence is wholly
                        contained within the easement to be created.
                        In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
                        undertaking in writing that the Title Deed and the easement documents will be lodged at
                        the Land Titles Office and any additional Titles Office forms or requisitions requiring the
                        consent of Council will be attended to promptly.
                        A duly executed copy of the easement shall be submitted to Council for perusal prior to
                        the use commencing. Any changes required by Council’s Solicitor must be corrected
                        immediately.
                 33.    No building or other structure shall be constructed or encroach over an easement.
                        Town Water Supply
                 34.    The site shall be connected to Council’s existing town water supply and be constructed
                        in accordance with Council’s standards and requirements at no cost to Council.
                 35.    Each individual water connection to the water reticulation system shall extend to the
                        property boundary and be metered. All fees for the supply of water meters shall be paid
                        to the Council.
                 36.    All water meters must be located outside the property boundary and in an easily
                        assessable location to facilitate unhindered reading by Council and/or Council’s
                        contracted water meter readers, and not behind fences or locked gates. In this regard
                        approval of the water meter configuration and location must be obtained from Council’s
                        Water & Sewerage Capital Works Manager prior to lodgement and approval of hydraulic
                        drawings.
                        Earthworks
                 37.    Any filling works required on site shall be carried out in accordance with Council’s
                        Planning Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the
                        additional ponding of water on any adjoining lands or the blockage of, or interference
                        with, any natural stormwater runoff.
                 38.    Earthworks carried out on site shall not affect the structural integrity of any of the existing
                        fences or structures that border the development site. Fences that are affected shall be
                        replaced prior to the Building Certifier issuing the Certificate of Classification. In this
                        regard any fences to be replaced shall be clearly shown on the plans submitted for
                        Operational Works approval.
                        Erosion and Sediment Control
                 39.    Any person acting on this permit shall prevent erosion and sediment export from leaving
                        the site. Site control measures such as silt fencing, controlled gravel access to the site
                        and controlled disposal of waste, will be necessary.
                        In this regard plans detailing the methods of controlling erosion and sediment are
                        required to be submitted to the Council for approval prior to obtaining a Development
                        Permit for Operational Works.
                        Vehicle Access and Car Parking
                 40.    A vehicular access driveway and carparking on the site shall be constructed generally
                        in accordance with plan titled Site-Parking numbered P1 Sheet S2 issue C dated
                        16/04/09 and as amended by Council in red. A Development Permit for Operational
                        Works shall be required.


                                                                                                            Page 6 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 7

                 41.    The driveway shall be designed and constructed to Council’s design standards and to
                        grades that prevent vehicles from scraping and/or bottoming whilst also allowing
                        pedestrians movements along the footpath without any step or level difference. Should
                        any driveways be constructed to grades that do not comply with AS/NZS 2890.1-2004
                        and AS 2890.2-1989, Council will require that the driveway be removed and
                        reconstructed to levels that do comply.
                        Please note, a step between the driveway and the footpath must be avoided, as it is
                        preferred to have the footpath continue at a constant grade to minimise the potential for
                        pedestrians to trip or fall.
                 42.    To ensure pedestrian safety between vehicles exiting the site and pedestrians on the
                        footpath, the driveway and any associated fencing or vegetation near the driveway shall
                        comply with the minimum sight line requirements as defined in AS 2890.1, section 3.2.4.
                        The applicant shall demonstrate compliance by illustrating these sight lines on the plans
                        submitted for both Operational Works approval and Building Works approval.
                 43.    All vehicles shall enter and leave the site in a forward direction.
                 44.    The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-
                        2004 for user class 2 with allowance for vehicles to enter and leave the site in a forward
                        gear and with a minimum head clearance (headroom) at any point of 2.3m.
                 45.    All carparking shall be kept, maintained and line-marked in a condition fit for use.
                        Contributions Towards Council Infrastructure
                 46.    Monetary contributions shall be paid to Council towards the cost of providing and/or
                        upgrading various infrastructure at the rates applicable at the time of payment. An
                        estimate only of the contribution amounts are outlined in the table below:

                          Contribution Required For:                                Stage 1:         Stage 2:

                          PSP 12 – Public Open Space Contributions                  $14,594          $16,455
                          PSP 16 - Sewerage Headworks Contributions                 $17,505          $18,973
                          PSP 17 - Water Supply Headworks Contributions $28,507                      $31,508
                          PSP 20 - Pathway Trunk Network Contributions              $3,280           $3,699
                          TOTAL Contribution Amount =                               $63,886          $70,635
                          Please note, that these amounts are all subject to variations in the Consumer Price
                               Index, All Groups Brisbane from September 2009 until the date of payment.

                        All contributions must be paid prior to commencement of the use.
                        General
                 47.    A Construction Management Plan for each separate demolition and construction phase
                        of the development shall be submitted to and approved by Council at least 5 working
                        days prior to the commencement of any Demolition or Building works or at least 5
                        working days prior to the pre-start meeting for Operational Works. The Construction
                        Management Plan shall include but not be limited to:
                        a.      Traffic control measures to ensure safety and traffic flow is maintained in Pacific
                                Avenue;
                        b.      Limiting the routes for the heavy vehicles to the major road network and prohibit
                                the use of the local roads;
                        c.      Maintaining pedestrian access and safety along the frontage of the site;
                        d.      Indicate provision for on-site and off-site parking for the required workforce;
                        e.      Indicate the location of loading and unloading areas,

                                                                                                           Page 7 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 8

                        f.      Indicate the location of any “holding” areas for heavy vehicles;
                        g.      Operating hours and
                        h.      Strategy to protect Council’s existing infrastructures.
                 48.    Any damage caused to any public utility (eg pipelines, drainage pits, pathways, roads
                        etc) during the course of construction shall be repaired to Council’s standards and at no
                        cost to Council.
                 49.    Any alteration of any public utility or other facilities necessitated by the development of
                        the land or associated construction works external to the site shall be at no cost to
                        Council.
                 50.    The transportation of all materials to and from the site shall be undertaken in a manner
                        such that no particle matter escapes onto a public road. All vehicles carrying materials
                        either to or from the site shall be covered to prevent materials including dust being
                        windblown from the vehicle.
                        Refuse
                 51.    The developer must provide waste storage and disposal facilities in accordance with
                        Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial
                        and Industrial Premises”, including an external imperviously paved area correctly sized
                        for all refuse and recycling containers and suitably screened from public places and
                        neighbouring properties. A bin wash area is required with a cold-water tap, hose and
                        drain outlet connected to sewer, via a bucket trap. The drain outlet is to be designed to
                        prevent storm water entry to the sewerage system and this can be achieved with a nib
                        wall 50mm high and up to 700mm x 700mm wide (max 0.5m²), or alternatively the waste
                        area can be roofed, or any other design approved by Council.
                 52.    Refuse containers must be provided in accordance with the requirements of the
                        Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
                        Regulation 2000, for the storage and collection of refuse.
                 53.    A Waste Management Plan (Operational) in accordance with Planning Scheme Policy
                        No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial Premises”,
                        must be submitted for the day-to-day operation of the development and approved by
                        Council’s Health Section prior to issue of development permit for operational works.
                        It is critical that waste areas are properly planned. A copy of Planning Scheme Policy
                        No. 9 explaining exactly how to predict waste quantities and design waste areas is
                        available from Council and the web. The Plan shall include the following information: -
                        •       The types of waste that will be generated from the activities approved within the
                                development.
                        •       Estimated volumes or tonnage of both recyclables and waste generated.
                        •       Methods to be used for dealing with garden waste.
                        •       Initiatives to minimize waste either by waste prevention, reduction, re-use or
                                recycling.
                        •       Description of procedures for getting all waste to the bins; the storage of bins and
                                the collection of bins by the contractor.
                        •       A description of the design details of waste storage and recycling areas including
                                size, location, elevation and floor plan, methods of bin washing and system to
                                prevent storm water getting into sewer via the bin wash.
                        •       A description of types and volume of waste storage containers to be used.
                        •       The waste and recycling storage area shall include the provision of containers for
                                all waste and recycling materials including putresable matter, non-recycling waste,
                                paper/ cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc,
                                and bin washing facilities connected to sewer.


                                                                                                          Page 8 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 9

                        •       A detailed description of vehicular access to collect waste. Where collection is off
                                street, access must allow vehicles to enter and leave the site in a forward direction.
                 54.    A Waste Management Plan (construction and demolition) shall be submitted prior to
                        demolition, removal or relocation of any building other than a shed
                        Waste Management Plans (construction and demolition) are required to be submitted in
                        accordance with Planning Scheme Policy 11, Waste Management Plans see table
                        below.
                        Waste storage areas are to provide for adequate separation of all reusable, recyclable
                        and waste materials. These shall be located so that they are convenient and safe to use.
                        (Refer to Noosa Council Waste Management Code)
                        The Plan shall contain the following information:
                        •      The site area for the storage and separation of waste is to be shown on the plan
                               drawings accompanying the application.
                        •      A waste management table as indicated below is to be completed showing how
                               waste material is to be segregated - recycled – reused or disposed.
                          MATERIALS ON-SITE                 DESTINATION
                                                            Re-use and Recycling               Disposal
                          Expected          Estimated       On-site          Off-site          *specify
                                waste              volume         *specify          *specify        contractor
                                materials          (m³)           proposed          contractor      and
                                                                  re-use or         and             landfill
                                                                  on-site           recycling       site     or
                                                                  recycling         outlet          other
                                                                  methods                           disposal
                                                                                                    site
                          Excavation
                                material
                          Green waste
                          Bricks
                          Concrete
                          Timber-please
                                specify
                          Plasterboard
                          Metals - please
                                specify
                          Asbestos
                          Other - please
                                specify
                        Note * If a demolition contractor is undertaking works, then the Waste Management table
                        is to be completed by the demolition contractor.

                            The purpose of the Waste Management Plan is to facilitate the segregation of waste
                            for the effective reuse and recycling of such materials. Additionally Council rewards
                            those who segregate waste by significantly reducing disposal fees at the landfill some
                            items are free. Higher gate fees are charged for loads of mixed waste.

                 Noise
                 55.    Noise emission from mechanical equipment (air conditioners, refrigeration equipment or
                        pool pumps etc) shall comply with the following requirements:
                        The equipment shall be installed and located in a manner that prevents excessive noise
                        in accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement
                        Notices (on-the-spot fines) may apply for offences.

                                                                                                            Page 9 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 10

                        A person must not use equipment on any day if it makes or causes noise to be made -
                        From 10pm to 7am: More than the lower of either –
                        •       40 dB(A)
                        •       3 dB(A) above the background noise level
                        •       No audible noise for pool pumps apply during these hours.
                        From 7am to 7pm: More than the lower of either –
                        •       50 dB(A)
                        •       5 dB(A) above the background noise level
                        From 7pm to 10pm: More than 3 dB(A) above the background noise level.
                 56.    Submission of written certification from a suitably qualified person confirming that the
                        noise levels from all mechanical equipment comply with the cause above when
                        measured at either the residential boundary or outside the most exposed part of an
                        affected building, whichever is the closest to the equipment.
                        The assessment and certification is required immediately after installation of the
                        equipment and prior to any occupation of the building, and in a format approved by
                        Council. This assessment must take into account noise from any other fixed equipment
                        on the property e.g. swimming pool pump, heating/cooling equipment, etc that may
                        increase the overall noise level emitted.
                        Advice: It is highly recommended that the person you engage to certify the installation
                        Is involved at the plan development stage so they can recommend where this equipment
                        is best located. They can also advise about noise enclosures and can make other
                        suggestions to avoid noise problems. It is a lot more costly to try and deal with noise
                        problems after everything is built.
                 57.    All noise controlled measures set out in the Environmental Noise Level Study for
                        Proposed Residential Budget Accommodation – Development, 102 Pacific Avenue,
                        Sunshine Beach (Report No: R09043/02260/Rev.0/23.04.09) shall be incorporated into
                        the development.
                        Written certification shall be submitted from an Acoustic Consultant after completion of
                        works confirming that these noise control measures have been incorporated into the
                        development.
                 58.    All external facing windows to the south east and north east elevations of the buildings
                        shall be double glazed (or equivalent sound suppressant construction approved by
                        Council), so as to minimise the impacts of sound emanating from the development.
                 59.    Noise from building works associated with residential development shall comply with the
                        following –
                        59.1.          Limited to between 7:00am to 6:30pm Monday to Saturday.
                        59.2.          All reasonable measures are taken to minimise noise emissions.
                        59.3.          Not permitted on Sunday or public holidays
                 Additional Conditions – 17 December 2009
                 60.    Prior to the commencement of the use of each stage of development, the required
                        contributions shall be paid to Council.
                 61.    All access, carparking, stormwater, landscaping, frontage works, water and sewer works
                        are to be constructed prior to the commencement of the use of stage 1.
                 62.    Stage 2 is to be constructed within 4 years of the use of stage 1 commencing.
                 63.    Suitable dense screening vegetation is to be provided around the building pad of stage
                        2. A temporary landscaping plan is to be submitted and approved by Council prior to the
                        commencement of the use of stage 1.

                                                                                                        Page 10 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 11

                 Additional Conditions – 15 November 2018
                 When Conditions must be Complied With
                 64.    Unless otherwise stated, all conditions of this Decision Notice must be complied with
                        prior to the use commencing, and then compliance maintained at all times while the use
                        continues.
                        Approved Plans
                 65.    Development undertaken in accordance with this approval must generally comply with
                        the approved plans of development. The approved plans are listed in the following table
                        unless otherwise amended by these conditions.

                          Plan No.       Rev. Plan/Document Name                                    Date

                          18101-01       P      Site Plan, by PJ concepts and design                09.07.2018

                          18101-02       P      Landscape Plan, by PJ concepts and design           09.07.2018

                          18101-03       P      Floor Plan – Lot 106, by PJ concepts and design 09.07.2018

                          18101-04       P      Elevations –Sheet 1, by PJ concepts and design 09.07.2018

                                                Noise barrier plan

                        Nature and Extent of Approved Use
                 66.    An additional 21 beds are approved for the Visitor Accommodation Type 4 –
                        Conventional (visitor hostel). The total number of beds approved are 69 and one
                        manager’s unit.
                 67.    The approved accommodation units must be used for short term visitors only. The
                        approved units must not be occupied by persons for the purpose of permanent
                        accommodation.
                 68.    Amplified music must not be audible at the boundaries of the site between 10pm and
                        7am.
                        Landscaping
                 69.    The development site must be landscaped. The works must be undertaken in
                        accordance with an Operational Works approval, the Planning Scheme Policy 3
                        Landscaping Plants and Guidelines for Sunshine Beach and must include in particular:
                        a.      the works generally shown on the approved site plan including:
                                i.     A minimum 1.0 metre wide landscaping strip along the northern side
                                       boundary of the subject site, exclusive of the access driveway, generally
                                       uncompromised by infrastructure items designed such that vegetated
                                       screening will be provided within 3 years of the plantings occurring.
                                ii.    A minimum 2.0 metre wide landscaping strip along the full extent of the
                                       eastern boundary designed such that vegetated screening will be provided
                                       within 3 years of the plantings occurring.
                                iii.   Vegetated screening of any electrical transformers, bin storage areas and
                                       the like from the road frontage
                                iv.    Provision of 1 street tree within the road reserve for every 8 metres of road
                                       frontage including landscaping to the crossover works
                                v.     Trees on the northern boundary must be retained to provide visual screening
                                       of the development. Where civil works impact on the capacity to retain the
                                       tree, the tree may be removed and replaced with a tree of a minimum pot
                                       sized 100 litres.

                                                                                                           Page 11 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 12

                 70.    All landscape works must be established and maintained in accordance with the
                        approved design for the life of the development, and in a manner that ensures healthy,
                        sustained and vigorous plant growth. All plant material must be allowed to grow to full
                        form and be refurbished when its life expectancy is reached.
                        Performance Bond
                 71.    Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
                        must be submitted to Council, to secure performance of all conditions of this approval,
                        prior to the issue of a Development Permit for Operational Works. The cash bond or
                        trading bank guarantee will be returned on performance of the conditions of approval
                        less any costs incurred by Council in respect of enforcing performance of this permit.
                        Council reserves the right to call upon the bond or guaranteed sum to effect compliance
                        with conditions.
                        Water & Sewer Connections
                 72.    An underground connection to reticulated water and sewerage must be provided to the
                        development site in accordance with the standards and requirements of Northern SEQ
                        Distributor–Retailer Authority (Unitywater).
                 73.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
                        (Unitywater) must be submitted to Council that certifies an underground connection to
                        reticulated water and sewerage has been provided to the development site.
                        Building Appearance
                 74.    All air conditioning units or other mechanical equipment must be located at ground level,
                        or otherwise fully enclosed or screened such that they are not visible from the street
                        frontages nor adjoining properties.
                 75.    All deck and balcony areas above ground floor must not be enclosed by permanent
                        fixtures such as shutters, louvres, glass panelling or the like, except where required to
                        satisfy any privacy condition of this Decision Notice.
                        Advertising Devices
                 76.    Advertising devices must comply with the requirements of the Advertising Devices Code.
                 77.    Construction signage, including that on hoardings, shade cloth and cranes but not
                        including statutory safety signage, shall not exceed a total of 4m2 to each of the site’s
                        street frontages.
                        Fencing and Walls
                 78.    Any street fencing must be setback an average of 1 metre from the front property
                        boundary. Any fencing on the front boundary must either:
                        a.    not exceed a maximum height of 1.2m
                        b.    be of open construction.
                 79.    The area of land between the fence and the front property boundary must be densely
                        landscaped to screen any fencing from the street.
                        Clothes Drying Areas
                 80.    Each rooming unit must be provided with access to an outdoor clothes line which is
                        screened from public view.
                        Protection of Privacy
                 81.    To ensure privacy is protected between adjoining properties, any window/s, deck or the
                        like that overlooks or has the potential to overlook the private open space or habitable
                        room windows of neighbouring properties must either:
                        a.      have a minimum window sill height or 1.5 metres above floor level
                        b.      be fitted with translucent glazing
                        c.      be fitted with a fixed external screen
                                                                                                      Page 12 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 13

                        Communal Recreation Areas
                 82.    Communal recreation area/s must be provided as shown on the approved plans.
                        Amalgamation of Lots
                 83.    Lot 164 on RP 94566 and Lot 163 on RP 897370 must be amalgamated prior to the
                        commencement of use.
                 ENVIRONMENTAL HEALTH
                        Amenity
                 84.    The development must be undertaken and operated in a manner that causes no
                        detrimental effect upon the amenity of the neighbourhood by reason of the creation of
                        excessive noise, lighting, air-borne hazards, atmospheric pollutants (including dust or
                        odours) nuisance or any other emissions in accordance with the nuisance provisions of
                        the Environmental Protection Act 1994.
                        Noise Nuisance
                 85.    Noise emission from mechanical equipment shall comply with the following
                        requirements:
                        a.      Air-conditioning and Refrigeration
                                i.     7am to 10pm: Maximum background + 5dB(A)
                                ii.    10pm to 7am: Maximum background + 3dB(A)
                        b.      Pumps
                                i.     7am to 7pm: Maximum background + 5dB(A)
                                ii.    7pm to 10pm: Maximum background + 3dB(A)
                                iii.   10pm to 7am: No audible noise.
                 86.    Submission of written certification from a suitably qualified person confirming that the
                        noise levels from all mechanical equipment comply when measured at either the
                        residential boundary or outside the most exposed part of an affected building, whichever
                        is the closest to the equipment.
                        The assessment and certification is required immediately after installation of the
                        equipment and prior to any occupation of the building, and in a format approved by
                        Council. All equipment should be operating at the same time to test the overall noise
                        level created.
                 87.    Entertainers or speakers used to amplify noise must not be located in any of the outdoor
                        recreational areas.
                 88.    Prior to the use of the building situated at 106 Pacific Avenue for the purpose of visitor
                        accommodation noise barrier fencing must be erected in accordance with the approved
                        Noise barrier plan.
                 89.    Between the hours of 9pm to midnight the night manager must have the reception phone
                        with them. From midnight the phone must be diverted to a security team response
                        number.
                 90.    The courtyard of the manager’s unit situated at 106 Pacific Avenue must not be used
                        between the hours of 9.00pm and 6.00am.
                 91.    The pool and associated deck area must not be used between the hours of 9.00pm and
                        7.00am.
                        Outdoor Lighting Devices
                 92.    Lighting associated with the use must be designed, sited, installed and tested to comply
                        with Table 2.1 & 2.2 of Australian Standard AS4282-1997 “Control of the obtrusive
                        effects of outdoor lighting” using a control level of 1.

                                                                                                       Page 13 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 14

                 93.    Certification must be submitted to Council from a qualified person which certifies that all
                        outdoor lighting devices comply with the requirements of this Decision Notice at the time
                        of commissioning.
                        For the purpose of certifying outdoor lighting devices for the development, a qualified
                        person is:
                        a.      Registered Professional Engineer of Queensland;
                        b.      an environmental or electrical design consultant with a minimum of 3 years current
                                experience in the field of outdoor lighting.
                 WASTE
                 94.    The developer must provide waste storage and disposal facilities in accordance with
                        Planning Scheme Policy No. 9 "Waste Management Multi-Dwellings and Commercial
                        and Industrial Premises". The facilities must include an external impervious area
                        correctly sized for all refuse and recycling containers and suitably screened from public
                        places and neighbouring properties. A bin wash area is required with a cold-water tap,
                        hose and drain outlet connected to sewer, via a bucket trap. The drain outlet must be
                        designed to prevent storm water entry to the sewerage system. This can be achieved
                        with a nib wall 50mm high and up to 700mm x 700mm wide (max 0.5m2) , or alternatively
                        the waste area can be roofed, or any other design approved by Council.
                 95.    Refuse containers must be provided in accordance with the requirements of the
                        Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
                        Regulation 2000, for the storage and collection of refuse.
                 96.    Bins must be provided throughout the site to reduce littering. All bins provided must be
                        for refuse and recycling and be decanted into the bulk bins by the site operators.
                 ENGINEERING
                        Site Access and Driveways
                 97.    A sealed access driveway must be provided from Pacific Avenue to all parking and
                        manoeuvring areas of the development. The new works proposed to access No 106
                        must be undertaken in accordance with an Operational Works approval and must
                        include in particular:
                        a.    a driveway crossover generally in accordance with Council’s Standard Drawings
                              RS-051 and the associated addendum
                        b.    the works must match neatly with existing road and verge/footpath features.
                              Additional works beyond the driveway may be required to provide an acceptable
                              transition to existing road and verge/footpath profiles
                        Car Parking
                 98.    A minimum of an additional 2 car parking spaces must be provided and marked on the
                        site. The works must include dimensions, crossfalls and gradients in accordance with
                        Australian Standard AS2890: Parking Facilities for the relevant user class
                 99.    All car parking areas and access driveways must be maintained exclusively for vehicle
                        parking and manoeuvring and kept in a tidy and safe condition at all times.
                 100. Directional signage must be provided to direct visitors and customers to the car parking
                      spaces provided on site.
                        Pedestrian and Bicycle Facilities
                 101. Pedestrian and bicycle facilities must be provided for the development. The works must
                      be undertaken in accordance with an Operational Works approval and must include in
                      particular the replacement of the existing bitumen sealed path in the frontage of No. 106
                      Pacific Avenue with a concrete path and must extend to the existing driveway in the
                      frontage of 108 Pacific Avenue. The new path must be the same width as the existing
                      path.

                                                                                                        Page 14 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 15

                        Stormwater Drainage
                 102. Stormwater runoff from the development must be connected to the existing stormwater
                      drainage systems within the sites.
                        Damage to Services and Assets
                 103. Any damage caused to existing services and assets as a result of the development
                      works must be repaired at no cost to the asset owner at the following times:
                        a.      where the damage would cause a hazard to pedestrian or vehicle safety,
                                immediately; or
                        b.      where otherwise, upon completion of the works associated with the development.
                        Any repair work which proposes to alter the alignment or level of existing services and
                        assets must first be referred to the relevant service authority for approval.
                 Additional Conditions – 21 August 2025
                 104. An additional 11 beds are approved for the Visitor Accommodation Type 4 Conventional
                      (Hostel Accommodation). The total number of beds approved are 80 and one manager’s
                      unit.
                        Note: A single bed = 1 bed, a double bed = 2 beds
                 105. A maximum of 80 persons may be accommodated associated with the approved visitor
                      accommodation use.
                        This does not include the occupation of the managers unit.
                 106. A maximum of 20 persons can use the communal area at any one time.
                        Approved Plans
                 107. Development undertaken in accordance with this approval must generally comply with
                      the approved plans of development. The approved plans are listed in the following table
                      unless otherwise amended by these conditions.

                          Plan No.            Rev.   Plan/Document Name                           Date

                          23110-01            P3     Site Plan concept – prepared by PJ concepts 21.02.2025
                                                     and design
                                                     As annotated by Council

                          23110-02            P2     Ground Floor Plan existing – prepared by PJ 19.03.2024
                                                     concepts and design
                                                     As annotated by Council

                          23110-03            P2     1ST FLOOR – CONCEPT - prepared by PJ 19.03.2024
                                                     concepts and design

                          23110-04            P2     ELEVATIONS – SHEET 1 CONCEPT - 19.03.2024
                                                     prepared by PJ concepts and design
                                                     As annotated by Council

                          23110-05            P2     ELEVATIONS – SHEET 2                         19.03.2024
                                                     CONCEPT – prepared by PJ concepts and
                                                     design
                                                     As annotated by Council




                                                                                                    Page 15 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 16

                          23110-06             P2      SECTIONS – prepared by PJ concepts and 19.03.2024
                                                       design

                 Landscaping
                 108. The development site must be landscaped. The works must be undertaken in
                      accordance with the approved plan 23110-01 Rev P3 dated 21/02/2025 and the Noosa
                      Plan for that specific area and must include in particular:
                        a.      the works shown on the Approved Plans
                        b.      Syzygium austral are be planted along the boundary west of Park 1 and the
                                existing driveway in accordance with Council’s Planning Scheme Policy PSP2 –
                                Landscaping. The vegetation planted must have a minimum pot size of 300mm
                                with an average spacing of 1 metre.
                        c.      All landscape works must be established and maintained in accordance with the
                                approved design for the life of the development, and in a manner that ensures
                                healthy, sustained and vigorous plant growth. All plant material must be allowed
                                to grow to full form and be refurbished when its life expectancy is reached.
                 109. Prior to commencement of use the following must be submitted to Council:
                        Landscaping certification confirming all works have been constructed in accordance with
                        conditions of this approval.
                 Acoustic Attenuation
                 110. Before the use commences acoustic attenuation to the side and rear boundaries and
                      building envelope must be completed in accordance with the Noise Control, Conclusions
                      and Recommendations of the Environmental noise level impact assessment Report
                      Number R25048/ D3966/ Rev 1/ 23.05.25 prepared by David Moore and associates.
                 Performance Bond (applicable to application – 132007.2446.05)
                 111. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
                      must be submitted to Council, to secure performance of all conditions of this approval,
                      prior to the issue of a Development Permit for Operational Works. The cash bond or
                      trading bank guarantee will be returned on performance of the conditions of approval
                      less any costs incurred by Council in respect of enforcing performance of this permit.
                      Council reserves the right to call upon the bond or guaranteed sum to effect compliance
                      with conditions.
                 Building Appearance
                 112. All air conditioning units or other mechanical equipment must be located at ground level,
                      or otherwise fully enclosed or screened such that they are not visible from the street
                      frontages nor adjoining properties.
               Protection of Privacy
                 113. All windows to the northern and eastern elevation of the new upper level must be fixed
                      and non-openable in accordance with the Noise Control, Conclusions and
                      Recommendations of the Environmental noise level impact assessment Report Number
                      R25048/ D3966/ Rev 1/ 23.05.25 prepared by David Moore and associates.
                 114. To ensure privacy is protected between adjoining properties, any window/s, deck or the
                      like that overlooks or has the potential to overlook the private open space or habitable
                      room windows of neighbouring properties must either:
                        a.    have a minimum windowsill height or 1.7 metres above floor level.
                        b.    be fitted with translucent glazing.
                        c.    be fitted with a fixed external screen.


                                                                                                     Page 16 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 17

                 ENVIRONMENTAL HEALTH
                 Amenity
                 115. The development must be undertaken and operated in a manner that causes no
                      detrimental effect upon the amenity of the neighbourhood by reason of the creation of
                      excessive noise, lighting, air-borne hazards, atmospheric pollutants (including dust or
                      odours) nuisance or any other emissions in accordance with the nuisance provisions of
                      the Environmental Protection Act 1994.
                 ENGINEERING
                 Site Access and Driveways
                 116. A sealed access driveway must be provided from Pacific Avenue to all parking and
                      manoeuvring areas of the development. The new works proposed to access No 106
                      must be undertaken in accordance with an Operational Works approval and must
                      include in particular:
                        a.    a driveway crossover generally in accordance with Council’s Standard Drawings
                              RS-051 and the associated addendum
                        b.    the works must match neatly with existing road and verge/footpath features.
                              Additional works beyond the driveway may be required to provide an acceptable
                              transition to existing road and verge/footpath profiles
                 Car Parking
                 117. All vehicles, excluding passenger vehicles accessing car parks 1 & 2, must enter and
                      exit the site in a forward gear.
                 118. The internal access driveway servicing car parks 1 and 2 and the hardstand for 1 new
                      car space adjacent to the frontage of the site must be constructed generally in
                      accordance with the approved plans.
                 119. Carparks 1 and 2 must be constructed generally in accordance with the approved plans
                      and AS/NZS2890.1 at the time of the construction, including the relocation of car park 1
                      further eastward by 500mm.
                 120. An additional 2 bicycle and 2 motorcycle spaces are to be provided within the site.
                 121. All car parking areas and access driveways must be maintained exclusively for vehicle
                      parking and manoeuvring and kept in a tidy and safe condition at all times.
                 Stormwater Drainage
                 122. Stormwater runoff from the development must be connected to the existing stormwater
                      drainage systems within the sites.
                 Damage to Services and Assets
                 123. Any damage caused to existing services and assets as a result of the development
                      works must be repaired at no cost to the asset owner at the following times:
                        a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                              immediately; or
                        b.    where otherwise, upon completion of the works associated with the development.
                        Any repair work which proposes to alter the alignment or level of existing services and
                        assets must first be referred to the relevant service authority for approval.
                 5.     REASONS FOR APPROVAL DESPITE CONFLICT WITH THE PLANNING SCHEME

                 Find the following matters relevant to the assessment and sufficient reason to approve the
                 application:
                        a.      The proposed development will occur within a site already approved for visitor
                                accommodation.

                                                                                                    Page 17 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 18

                        b.      A range of visitor accommodation is needed within the Shire. The relatively minor
                                increase in bed numbers for the site can be appropriately incorporated while
                                managing impacts.
                        c.      The proposed development height complies with the Low Density residential zone
                                maximum height of 8.0 metres above ground level.
                        d.      The proposed development setbacks to side and rear boundaries comply with the
                                Low Density residential zone code.
                        e.      The proposed development on site car parking provision complies with Noosa plan
                                2020 Works code - Driveways and parking code.
                        f.      The applicant has prepared a site-specific acoustic assessment which has been
                                peer reviewed. The peer review supports the recommendations of the acoustic
                                assessment which have been included within the conditions of the approval.
                 6.     REFERENCE DOCUMENTS

                  Reference            Revision Title                                         Date
                  number

                  R25048/D3966         Rev.1       Environmental Noise Level Impact 23.05.25
                                                   Assessment for Proposed Addition of
                                                   Second Floor to Block C and Associated
                                                   Increase   to    Bed    Numbers     for
                                                   Flashpackers, 102 and 106 Pacific
                                                   Avenue, Sunshine Beach

                 7.     COMBINED APPROVED PLANS/DOCUMENTS

                 The approved plans and / or documents for this development approval are listed in the
                 following table:

                  Plan / Document No. Rev. Plan / Document Name                            Date

                  09-801 – P7 – S1             G    Site Plan   (2 Stages) – Garry 11/11/2009
                                                    Wilbraham Designs

                  07-011 - P4.10               B    Rendered Views – Garry Wilbraham 17/09/2008
                                                    Designs

                  07-011 - P4.11               B    Rendered Views – Garry Wilbraham 17/09/2008
                                                    Designs

                  09-801 – P2 – S3             G    Upper Floor Plan – Garry Wilbraham 10/11/2009
                                                    Designs

                  09-801 – P2 – S2             G    Lower Floor Plan – Garry Wilbraham 10/11/2009
                                                    Designs

                  07-011 – P3 – S1             B    Elevations – Elevation 1 – Garry 11/09/2008
                                                    Wilbraham Designs

                  07-011 – P3 – S2             C    Elevations – Elevation 2 – Garry 11/06/2009
                                                    Wilbraham Designs

                  07-011 – P1 – S2             C    Site Parking – Garry Wilbraham 16/04/2009
                                                    Designs


                                                                                                      Page 18 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 19

                  18101-01                 P      Site Plan, by PJ concepts and design 09.07.2018

                  18101-02                 P      Landscape Plan, by PJ concepts and 09.07.2018
                                                  design

                  18101-03                 P      Floor Plan – Lot 106, by PJ concepts 09.07.2018
                                                  and design

                  18101-04                 P      Elevations –Sheet 1, by PJ concepts 09.07.2018
                                                  and design

                                                  Noise barrier plan

                  23110-01                 P3     Site Plan concept – prepared by PJ 21.02.2025
                                                  concepts and design
                                                  As annotated by Council

                  23110-02                 P2     Ground Floor Plan existing – 19.03.2024
                                                  prepared by PJ concepts and design
                                                  As annotated by Council

                  23110-03                 P2     1ST FLOOR – CONCEPT - prepared 19.03.2024
                                                  by PJ concepts and design

                  23110-04                 P2     ELEVATIONS       –  SHEET           1 19.03.2024
                                                  CONCEPT - prepared by              PJ
                                                  concepts and design
                                                  As annotated by Council

                  23110-05                 P2     ELEVATIONS – SHEET 2                    19.03.2024
                                                  CONCEPT – prepared            by   PJ
                                                  concepts and design
                                                  As annotated by Council

                  23110-06                 P2     SECTIONS – prepared           by   PJ 19.03.2024
                                                  concepts and design

                 8.     REFERRAL AGENCIES

                 Not applicable.
                 9.     ADVISORY NOTES

                 The following Advisory Notes are for information purposes only and do not form conditions of
                 approval:
                        Infrastructure Charges
                 1.     All developments and/or changes to existing developments may require payment of
                        “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
                        Resolution” made pursuant to the planning legislation and regulations current at the time
                        of issue. For further information, please refer to https://www.noosa.qld.gov.au/planning-
                        development/development-tools-guidelines/infrastructure-charges
                 2.     The applicant is advised that development contributions and infrastructure charges
                        applicable to this development approval have been based on the following Uses Class/
                        Uses and applicable quantities:-

                                                                                                       Page 19 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 20

                          Existing Development                            Approved Development

                          Existing Use Class /                            Approved           Use Approved
                                               Existing Quantity
                          Use                                             Class / Use            Quantity

                                                                          Visitor                48 beds + 1 x 1
                          Detached House             1 Dwelling           Accommodation        - Bedroom
                                                                          Type 4 - Hostel        Manager Unit

                 3.          The applicant is informed that approval of this development application will trigger an
                             Infrastructure Charge in accordance with the Coastal Major Road Network
                             Infrastructure Charges Plan and is subject to variations in the Consumer Price Index,
                             All Groups Brisbane from September 2009 until the date of payment. An
                             Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the
                             Integrated Planning Act 1997. An estimate only is outlined in the table below:

                                                                                    Stage 1:        Stage 2:

                          Coastal Major Road Network ICP                            $8,384          $10,511
                 4.     The applicant is informed that payment via credit card transaction will not be an
                        acceptable method of payment for development contributions conditioned in this permit
                        or for infrastructure charge notices issued separately.
                 5.     The applicant is advised that a Compliance Permit for all plumbing and drainage works
                        within the boundaries of the development site shall be obtained from Council’s Plumbing
                        Services Section prior to obtaining a Development Permit for Building Works.
                 6.     The applicant is advised that this development may require the provision of fire hydrants
                        and a booster pump in accordance with the Building Code of Australia, and consultation
                        may also be needed with Queensland Fire Services to ensure suitable fire fighting
                        infrastructure is provided. To this end any necessary fire hydrants shall be clearly shown
                        on the plans submitted for both Operational Works and Building Works approval and if
                        a booster pump is deemed necessary, the plans shall indicate where the fire truck is to
                        be accommodated in order to provide boosting to the water supply.
                 7.     Where any food premises is included in a development, the following is required:
                        a.       A separate Material Change of Use Application.
                        b.       Plans and application is to be made to Council’s Environmental Health Section for
                                 approval prior to any building approval, fitting out or use of the premises.
                        c.       A statement indicating the purpose of the food premises, type of food sold,
                                 proposed menu and maximum number of patrons at any time, is to accompany
                                 the application for plan approval.
                        d.       Construction and use of the food premises should comply with Council’s Food
                                 Premises Policy and the Food Safety Standards. (Both available from Council)
                        e.       Toilets for customers and staff to be provided in accordance with Building Code of
                                 Australia. Obtain advice from a building certifier on numbers and standards,
                                 including disable access.
                        f.       Plans and approval is required for any mechanical exhaust ventilation system,
                                 which should comply with AS1668. A certificate from the installer certifying the
                                 system complies with the Standard must be obtained and lodged with Council prior
                                 to commencement of trade.
                        g.       Any Licensable Food Business, as defined in Chapter 3 of the Food Act 2006,
                                 must obtain a Food License from Council, prior to use of those premises.


                                                                                                          Page 20 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 21

                 8.      The development should be undertaken and operated in a manner that causes no
                         detrimental effect upon the amenity of the neighbourhood by reason of the creation of
                         excessive noise, lighting, air-borne hazards, atmospheric pollutants (including dust or
                         odours) nuisance or any other emissions in accordance with the nuisance provisions of
                         the Environmental Protection Regulation 1998 or Council’s Local Law No. 12 – Control
                         of Nuisances.
                 9.      In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud,
                         paint, cement, concrete, builder’s waste or rubbish should not be permitted to enter or
                         be placed where it could reasonably be expected to move into a roadside gutter, storm
                         water drain or a watercourse. On the spot fines apply for such offences.
                         Aboriginal Cultural Heritage Act 2003
                 10.     There may be a requirement to establish a Cultural Heritage Management Plan and/or
                         obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                         The ACH Act establishes a cultural heritage duty of care which provides that: “A person
                         who carries out an activity must take all reasonable and practicable measures to ensure
                         the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply
                         with the duty of care. Substantial monetary penalties may apply to individuals or
                         corporations breaching this duty of care. Injunctions may also be issued by the Land
                         and Resources Tribunal, and the Minister administering the ACH Act can also issue stop
                         orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
                         the cultural heritage value of Aboriginal cultural heritage.
                         You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss
                         any obligations under the ACH Act.
                 10.     PROPERTY NOTES

                 Not applicable.
                 11.     VARIATION APPROVAL DETAILS

                 Not applicable.
                 12.     FURTHER DEVELOPMENT PERMITS REQUIRED

                      Type of Development Permit               Subject of the required Development Permit
                      required

                      Development Permit for Building          All Building Works
                      Works

                      Development Permit for Operational       Landscaping, Car parking & access, Frontage
                      Works                                    works, Stormwater drainage, Erosion &
                                                               sediment control

                 13.     SUBMISSIONS

                 Application 2007/2446 / Development Permit for Material Change of Use - Visitor
                 Accommodation Type 4 - Conventional (Visitor Hostel) - There were (2) properly made
                 submissions about the application.
                 Application – 132007.2446.03
                 There were 5 properly made submissions about the application and 2 not properly made
                 submissions supporting the application.




                                                                                                          Page 21 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 22

                 Application – 132007.2446.05
                 There were 3 properly made submissions about the application. In accordance with the
                 Planning Act 2016, the name, address and electronic address of the principal submitter for
                 each properly made submission is provided and attached.
                 14.      RIGHTS OF APPEAL

                 You are entitled to appeal against this decision. A copy of the relevant appeal provisions from
                 the Planning Act 2016 is attached.
                 During the appeal period, you as the applicant may suspend your appeal period and make
                 written representations to Council about the conditions contained within the development
                 approval. If Council agrees or agrees in part with the representations, a negotiated decision
                 notice will be issued. Only one negotiated decision notice may be given.
                 15.      OTHER DETAILS

                 If you wish to obtain more information about the decision, electronic copies are available online
                 at www.noosa.qld.gov.au or at Council Offices.




                 Yours faithfully,




                 Patrick Murphy
                 Manager, Development Assessment
                 Development & Regulation


                 Enc:     List of Submitters
                          Appeal Rights
                          Infrastructure Charge Notice
                          Approved Plans/Documents


                 DECISION NOTICE HISTORY
                 •     Original Decision Notice – 17 August 2009.

                 •     Decision Notice – Minor – 132007.2446.02 – 17 December 2009, change to conditions 1, 3, 16 & 46, change to advisory
                       note 2 and additional conditions 60, 61, 62, & 63.

                 •     Decision Notice – Other Change – 132007.2446.03 – 15 November 2018 – add additional conditions 64 – 103.

                 •     Decision Notice – Other Change 132007.2446.04 – 24 September 2001 – Withdrawn.

                 •     Decision Notice – Other Change 132007.2446.05 – 21 August 2025 – add additional conditions 104 -123.




                                                                                                                              Page 22 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 23

                                               List of Submitters
                                               PLANNING ACT 2016 & PLANNING REGULATION 2017




                Name                        Email                            Address

                Jackie Keogh                [email protected]          29 Nebula Street,
                                                                             Sunshine Beach 4567
                Elizabeth & Luke McKenzie   [email protected]             27 Nebula Street,
                                                                             Sunshine Beach 4567
                Dylan & Danielle Lunn       [email protected]              100 Pacific Avenue,
                                                                             Sunshine Beach 4567




                                                                                              Page 23 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Page 24

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –                                              1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and                                                application; and
                   (b) The person-                                                                (e) each person who may elect to become a co-respondent for the
                                                                                                      appeal, other than an eligible submitter who is not a principal
                         (i)   who may appeal a matter (the appellant); and
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and                 (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and             (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the                 person who the registrar considers appropriate.
                              matter.                                                         (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.                     (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –                                                             Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the          (5) A notice of appeal given to a person who may elect to be a co-
                       agency; or                                                                 respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the         (6) A person elects to be a co-respondent by filing a notice of election,
                       deemed refusal happens; or                                                 in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter            appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of        231 Other appeals
                       premises – 20 business days after a notice us published under
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                       section 269(3)(a) or (4); or
                                                                                                  the Supreme Court decides a decision or other matter under this
                   (d) for an appeal against an infrastructure charges notice – 20                Act is affected by jurisdictional error, the decision or matter is non-
                       business days after the infrastructure charges notice is given             appealable.
                       to the person; or
                                                                                              (2) The Judicial Review Act 1991, part 5 applies to the decision or
                   (e) for an appeal about a deemed approval of a development                     matter to the extent it is affected by jurisdictional error.
                       application for which a decision notice has not been given –
                                                                                              (3) A person who, but for subsection (1) could have made an
                       30 business days after the applicant gives the deemed
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                       approval notice to the assessment manager; or
                                                                                                  decision or matter, may apply under part 4 of that Act for a
                   (f)   for any other appeal – 20 business days after a notice of the            statement of reasons in relation to the decision or matter.
                         decision for the matter, including an enforcement notice, is
                                                                                              (4) In this section –
                         given to the person.
                                                                                                  decision includes-
               Note –
                   See the P&E Court Act for the court’s power to extend the appeal               (a) conduct engaged in for the purpose of making a decision; and
                   period.                                                                        (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard                   (c) the making of a decision or failure to make a decision; and
                   in the appeal.
                                                                                                  (d) a purported decision; and
               (5) If an appeal is only about a referral agency’s response, the
                   assessment manager may apply to the tribunal or P&E Court to                   (e) a deemed refusal.
                   withdraw from the appeal.                                                      non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an                  matter-
                   infrastructure charges notice must not be about-                               (a) is final and conclusive; and
                   (a) the adopted charge itself; or                                              (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-                                      set aside or called into question in any other way under the
                                                                                                      Judicial Review Act 1991 or otherwise, whether by the
                         (i)   the establishment cost of trunk infrastructure identified in           Supreme Court, another court, a tribunal or another entity; and
                               a LGIP; or
                                                                                                  (c) is not subject to any declaratory, injunctive or other order of
                         (ii) the cost of infrastructure decided using the method                     the Supreme Court, another court, a tribunal or another entity
                              included in the local government’s charges resolution.                  on any ground.
               230 Notice of appeal                                                           232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the        (1) A person who is appealing to the P&E Court must comply with the
                   tribunal or P&E Court, a notice of appeal that-                                rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                                                                                              (2) However, the P&E Court may hear and decide an appeal even if
                   (b) succinctly states the grounds of the appeal.                               the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                  Page 24 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025

Used in these records

About this file

File size
254 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Other Change Decision Notice - Council Meeting Decision 132007 2446 05.pdf · 254 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.