115. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
excessive noise, lighting, air-borne hazards, atmospheric pollutants (including dust or
odours) nuisance or any other emissions in accordance with the nuisance provisions of
the Environmental Protection Act 1994.
ENGINEERING
Site Access and Driveways
116. A sealed access driveway must be provided from Pacific Avenue to all parking and
manoeuvring areas of the development. The new works proposed to access No 106
must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. a driveway crossover generally in accordance with Council’s Standard Drawings
RS-051 and the associated addendum
b. the works must match neatly with existing road and verge/footpath features.
Additional works beyond the driveway may be required to provide an acceptable
transition to existing road and verge/footpath profiles
Car Parking
117. All vehicles, excluding passenger vehicles accessing car parks 1 & 2, must enter and
exit the site in a forward gear.
118. The internal access driveway servicing car parks 1 and 2 and the hardstand for 1 new
car space adjacent to the frontage of the site must be constructed generally in
accordance with the approved plans.
119. Carparks 1 and 2 must be constructed generally in accordance with the approved plans
and AS/NZS2890.1 at the time of the construction, including the relocation of car park 1
further eastward by 500mm.
120. An additional 2 bicycle and 2 motorcycle spaces are to be provided within the site.
121. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Stormwater Drainage
122. Stormwater runoff from the development must be connected to the existing stormwater
drainage systems within the sites.
Damage to Services and Assets
123. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
5. REASONS FOR APPROVAL DESPITE CONFLICT WITH THE PLANNING SCHEME
Find the following matters relevant to the assessment and sufficient reason to approve the
application:
a. The proposed development will occur within a site already approved for visitor
accommodation.
Page 17 of 24
Document Set ID: 24061481
Version: 7, Version Date: 28/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Other Change Decision Notice - Council Meeting Decision 132007 2446 05.pdfRelated documentApplication case desk ↗
About this file
- File size
- 254 KB (small file)
- File type
No other editions are linked here.