Original source · versioned page text
03. Hales - Engineer certificate of Design
Attached to the e-mail Operational Works Application OPW20/0117 - 37 Mossman Crt Noosa Heads.
Certification of design of prescribed tidal work In relation to a proposal for a development approval for prescribed tidal work, this certification must be completed and submitted by a suitably qualified professional engineer to certify that the design of the prescribed tidal work is in accordance with the relevant Australian Standards, Schedule 3 – Code for assessable development that is prescribed tidal works of the Coastal Protection and Management Regulation 2017 and is suitable for intended use. Re: 35-37 Mossman Court, Noosa Heads For Jetty and Boundary Retaining Wall At 35-37 Mossman Court, Noosa Heads I Sean Richardson Of SCG Consulting Engineers, 1/11 Project Av, Noosaville Q 4566 state that: 1. I am a registered Professional Engineer of Queensland, under the provisions of the Professional Engineers Act 2002. 2. I certify that: (a) the works including any other associated works have been designed in accordance with the relevant Australian Standards and Schedule 3 – Code for assessable development that is prescribed tidal works of the Coastal Protection and Management Regulation 2017. (b) The works: - (i) are suitable for their intended use; (ii) are designed to be structurally adequate for their intended location and anticipated use; (iii) are designed to be structurally adequate to allow for the scour resulting from flood and tidal conditions; (iv) are designed not to impose loads on existing structures such that the design capabilities of these existing structures are exceeded (structures include walls without limiting the definition of structures); (v) are designed not adversely affect the stability of the bed and the banks of the waterway in which the works are constructed and the works are designed for significant scour; (vi) are designed in accordance with all appropriate Australian standards and guidelines; (vii) are designed not to adversely affect the usage of existing adjacent structures; and (viii) have been designed to have a non-slip surface. (c) the prescribed tidal work has been designed to comply with Schedule 3 – Code for assessable development that is prescribed tidal works of the Coastal Protection and Management Regulation 2017. Sean Richardson RPEQ 5835 Signed Print name and RPEQ registration number (person making this declaration) DATE:- 07/07/2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.