ACID SULFATE SOIL REPORT: Proposed Residence

                           30 Mossman Court

                                Noosa Heads

            DD Sunnyside CD Sunnyside Pty Ltd

                              November 2023

                                    PG-10899

                                   VERSION 3
Full text of the other 29 pages

Page 2

Ref:           PG-10899, 2023-10-16, ASR VER 3
Author:        Robert Maxwell



                                                               28th November, 2023

DD Sunnyside CD Sunnyside Pty Ltd
Email: [email protected]

ATTENTION:          DAVID DODD

Dear Sir,

            ACID SULFATE SOIL INVESTIGATION – PROPOSED RESIDENCE
                      30 MOSSMAN COURT, NOOSA HEADS


Enclosed is a copy of our report for the above project dated November 2023. An
electronic copy of the report has been issued.

It should be noted that access to the site was restricted by the existing on-site
residence and testing was therefore restricted to one location only. Additional
borehole drilling and testing will be required when access becomes available.

Should you have any queries regarding this report, please do not hesitate to contact
Robert Maxwell or Peter Elkington at this office.

Yours faithfully,




R. MAXWELL (RPEQ 16596)

For and on behalf of
PACIFIC GEOTECH PTY LTD




                                 [email protected]
                                 www.pacgeo.com.au

Page 3

                                      TABLE OF CONTENTS
1.0     INTRODUCTION ..................................................................................................... 1
2.0     METHODOLOGY .................................................................................................... 2
3.0     SITE DESCRIPTION ................................................................................................. 2
4.0     GEOLOGICAL MODEL .......................................................................................... 4
5.0     GROUNDWATER .................................................................................................... 4
6.0     LABORATORY TESTING ......................................................................................... 5
7.0     LIMITATIONS .......................................................................................................... 7


Appendices
 Appendix A
      Notes relating to this report

 Appendix B
      Borehole Record Sheets

 Appendix C
      Laboratory Test Certificates

 Appendix D
      Site Plan

 Appendix E
      Acid Sulfate Soil Management Plan

Page 4

 Project No. PG-10899                                                                                                      Page | 1
 November 2023
 Ref: PG-10899, 2023-10-16, ASR VER 3
 DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




1.0 INTRODUCTION

This report contains the results of the acid sulfate soil investigation by Pacific Geotech
and contains advice and recommendations relating to:

          Acid sulfate soil conditions
          Development of an Acid Sulfate Soil Management Plan
Proposed Development

It is understood that the proposed development is to consist of the construction of a
two-storey residence above a single level basement at the above site. Earthworks are
envisaged to consist of cuts of up to 3m for the basement. The total volume of material
to be disturbed is in the order 900m3.

The proposed development is indicated below.

                                                   PROPOSED DEVELOPMENT




                                                        PROPOSED SECTION

Page 5

 Project No. PG-10899                                                                                                      Page | 2
 November 2023
 Ref: PG-10899, 2023-10-16, ASR VER 3
 DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




2.0 METHODOLOGY

The investigation comprised the drilling and sampling of one (1) boreholes to a depth
of 9.0m, using a Compac 018 drilling rig fitted with 100mm solid flight augers, and one
(1) hand auger across the proposed building area. Dynamic Cone Penetrometer
(DCP) testing was conducted adjacent to the boreholes.

The deeper borehole was sampled for Acid Sulfate purposes, in addition to
geotechnical sampling.

Additional borehole drilling and testing will be required when access to the remainder
of the site becomes available.

The boreholes were located by an experienced geotechnical engineer with
reference to the site features and locations were recorded. At the completion of the
drilling, the holes were checked for groundwater intrusion and then backfilled.

The soil classification descriptions and field tests were carried out in general
accordance with Australian Standards.

               AS 1726                                      Geotechnical Site Investigations

               QASSIT                                       Queensland Acid Sulfate Soil Investigation
                                                            Team Dept. of Natural Resources, 'Guidelines
                                                            for Sampling and Analysis of Lowland Acid
                                                            Sulfate Soils (ASS) in Queensland, 1998' (Oct.
                                                            1998, Revision 4.0).

               NOOSA COUNCIL                                'SC6.9.3 Acid Sulfate Soils (ASS) Investigation
                                                            and management plan

               QUEENSLAND                                   State Planning Policy Guideline, December
               GOVERNMENT                                   2013, Acid Sulfate Soils

Borehole records, Dynamic Cone Penetrometer test results and a site plan showing
the test locations are appended to the report.

3.0 SITE DESCRIPTION

The site of the proposed development is located at 30 Mossman Court, Noosa Heads.
The site was bordered by Mossman Court to the south, existing residences to the east
and west, and a canal to the north.

At the time of the investigation, the site was occupied by an existing two storey
residence and detach single garage. The site was relatively level and drainage was
considered poor to fair.



Refer following aerial and site photographs for typical site conditions.

Page 6

Project No. PG-10899                                                                                                      Page | 3
November 2023
Ref: PG-10899, 2023-10-16, ASR VER 3
DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                                                            AERIAL IMAGE




                                                       SITE PHOTOGRAPHS

Page 7

 Project No. PG-10899                                                                                                        Page | 4
 November 2023
 Ref: PG-10899, 2023-10-16, ASR VER 3
 DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




4.0 GEOLOGICAL MODEL

The subsurface profile encountered in borehole BH01 generally consisted of a surficial
concrete layer associated with the driveway, overlying very loose to loose sand fill to
a depth of 2.3m, overlying natural sands that were generally medium dense to dense,
becoming indurated at a depth of 6.6m, and continued to the termination of
borehole BH01 of 9.0m.

In HA02, loose silty sand fill was encountered to a depth of 0.6m, overlying loose sand
fill to the termination depth of 1.0m.

Table 1. presents a summary of the encountered subsurface profile. Detailed borehole
record sheets are appended to this report.

TABLE 1                           SUBSURFACE PROFILE SUMMARY

                                                          NATURAL
                                                            SAND
 BH No.                FILL                                                                                                BH TD
                                                                 Dense to Very Dense
                                        Medium Dense to Dense
                                                                     (Indurated)
   BH01              0.0-2.3                   2.3-6.6                  6.6-TD                                              9.0
   BH02              0.0-TD                      NE                       NE                                                1.0

Notes:
1. All depths in metres below ground level at time of investigation.
2. NE - Not Encountered; TD - Termination Depth.

5.0 GROUNDWATER

Groundwater was noted in borehole BH01 at a depth of 2.8m at the time of drilling.
Water levels can be expected to similar to the tidal levels of the neighbouring canal
and may vary with seasonal and climatic conditions.

Page 8

 Project No. PG-10899                                                                                                      Page | 5
 November 2023
 Ref: PG-10899, 2023-10-16, ASR VER 3
 DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




Typically the groundwater levels in the area are encountered at levels of
approximately RL 0.5m to RL 1.0m. Fluctuations of +/- 0.5m are typically noted in the
area.

Increases in the groundwater levels often occur following significant rainfall events
(floods) with the groundwater levels to as much as RL 1.5m to RL 2.0m being noted in
the area.

6.0 LABORATORY TESTING

Laboratory testing was undertaken in general accordance with the
recommendations outlined in the QASSIT 'Acid Sulfate Soils Laboratory Methods
Guidelines 2004' and was undertaken by Pacific Geotech. The results of the testing
program are appended to this report.

The testing program comprised of initial screening tests on recovered samples,
followed by quantitative testing using the Chromium Reducible Sulfur (CRS) suite.

Screening Tests

Screening tests were undertaken on soil samples collected from borehole BH01. Two
small sub-samples of each soil sample were prepared; one sub-sample from each
sample was mixed with approximately 20mL of distilled water, and the other sub-
sample mixed with approximately 20mL of hydrogen peroxide (H2O2), buffered to a
pH of 5.4 with sodium hydroxide.

Slurry pHs were measured with a calibrated pH meter. The pH of the distilled water/soil
slurry (pHF) was measured approximately one hour after mixing, whilst the pH of the
hydrogen peroxide/soil slurry (pHFOX) was measured approximately one to two hours
after mixing.

The pH screening tests can be used for the preliminary identification of a potential or
actual ASS using a combination of three trigger factors as follows:

     a) The strength of the reaction with peroxide is a useful indicator but cannot be
        used alone. Organic matter and other soil constituents such as manganese
        oxides can also cause a reaction.

     b) A pHFOX value at least one unit below pHF may indicate a potential ASS. The
        great the difference between the two measurements, the more indicative the
        value is of a potential ASS. The lower the final pHFOX value the better the
        indication of a positive result.

     c) If the pHFOX is less than 3, and the other two conditions apply, then it strongly
        indicates a potential ASS. The more the pHFOX drops below 3, the more positive
        the presence of sulfides.

In broad summary, several of the ‘natural’ soil samples tested did show a strong
indication of ASS presence at depths greater than 3m below ground level. The results

Page 9

 Project No. PG-10899                                                                                                         Page | 6
 November 2023
 Ref: PG-10899, 2023-10-16, ASR VER 3
 DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




of the screening tests were used to assist in the selection of samples for more detailed,
quantitative laboratory testing.

Chromium Suite Analysis

Chromium suite analysis was undertaken to quantify existing soil acidity and potential
future acid generation from possible ASS. Soil samples were refrigerated until
transported to Pacific Geotech’s laboratory, under standard chain of custody
protocol. A summary of results is given in Table 2.

TABLE 2                           CHROMIUM SUITE TESTING SUMMARY

                                                               Nett Acidity                                     Liming Rate
 BH No.                Depth (m)
                                                                (mol H+/t)                                     (kg CaCO3/t)
  BH 01                       1.0                                   <5                                               <1
  BH 01                       2.0                                   11                                               <1
  BH 01                       3.0                                   23                                                2
  BH 01                       4.0                                   35                                                3

Summary

On the basis of the testing undertaken, some samples provided nett acidity values
above the QASSIT defined action criteria at depths greater than 3m below ground
level. Therefore, soils disturbed on-site should be treated in accordance with the
attached Acid Sulfate Soil Management Plan.

The results of the laboratory testing are appended to this report.

Page 10

 Project No. PG-10899                                                                                                      Page | 7
 November 2023
 Ref: PG-10899, 2023-10-16, ASR VER 3
 DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




7.0 LIMITATIONS

We have prepared this report for the Proposed Residence at 30 Mossman Court,
Noosa Heads. The report is provided for the exclusive use of DD Sunnyside CD
Sunnyside Pty Ltd, for this project only and for the purposes outlined in the report. It
should not be used by, or relied upon, for other projects on the same or different sites
or by a third party. In preparing this report, we have relied upon information provided
by the client or their agents.

The results are indicative of the subsurface conditions on site only at the specific
testing locations. Subsurface conditions can change between test locations and the
design and construction should take the spacing of the testing and testing methods
adopted and the potential for variation between the test locations.

This is not to reduce the level of responsibility accepted by Pacific Geotech, but rather
to ensure that the parties who may rely on the information contained in this report are
aware of the responsibilities they assume in doing so.




R. MAXWELL (RPEQ 16596)

For and on behalf of
PACIFIC GEOTECH PTY LTD

Page 11

Project No. PG-10899
November 2023
Ref: PG-10899, 2023-10-16, ASR VER 3
DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                                                                                                                          APPENDICES

Page 12

Project No. PG-10899
November 2023
Ref: PG-10899, 2023-10-16, ASR VER 3
DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                                                                                                                          APPENDIX A
                                                                  NOTES RELATING TO THIS REPORT

Page 13

                                                     Notes Relating to this Report


Reports                                                other particles present (e.g. sandy clay) as set
                                                       out below:
The report has been prepared by qualified
personnel, is based on the information                         Soil
                                                                                   Particle Size
obtained from field and laboratory testing, and           Classification
has been undertaken to current engineering             Clay                less than 0.002mm
standards of interpretation and analysis.              Silty               0.002 to 0.06mm
                                                       Sand                0.06 to 2mm
                                                       Gravel              2 to 60mm
Every care has been taken with the report as it
relates  to     interpretation   of   subsurface
                                                       Non-cohesive soils are classified on the basis of
conditions,     discussion    of    geotechnical
                                                       relative density which can be correlated from
conditions and contains recommendations or
                                                       the results of Standard Penetration Test (SPT) as
suggestions for design and construction.
                                                       below:
However, unexpected variations in ground
conditions will occur. The potential for this will
                                                                                   SPT ‘N’ Value
depend partly on testing, spacing and                  Relative Density
                                                                                  (blows/300mm)
sampling frequency.                                    Very Loose          less than 4
                                                       Loose               4 – 10
If variations are identified, Pacific Geotech          Medium Dense        10 – 30
would be pleased to assist with additional             Dense               30 – 50
investigations or advice to resolve the matter.        Very Dense          greater than 50

Copyright                                              Cohesive soils are classified on the basis of
                                                       strength (consistency) and can be quantified
This report is the property of Pacific Geotech         by the Pocket Penetrometer test, Vane Shear
Pty Ltd. The report may only be used for the           test,    laboratory testing   or  engineering
purpose for which it was commissioned and in           examination. The strength terms are defined as
accordance with the Terms of Engagement of             follows:
proposal. Unauthorised use of this report is
prohibited.                                                                  Unconfined Compressive
                                                        Classification
                                                                                    Strength kPa
Borehole and Test Pit Logs                             Very Soft           less than 25
                                                       Soft                25 - 50
The borehole and test pit logs presented in this       Firm                50 – 100
report are an engineering and/or geological            Stiff               100 – 200
interpretation of the subsurface conditions, and       Very Stiff          200 - 400
                                                       Hard                greater than 400
their reliability will depend to some extent on
                                                       Friable             strength not attainable – soil
frequency of sampling and the method of                                    crumbles
drilling or excavation.
                                                       Rock types are classified by their geological
Interpretation of the information and its
                                                       names, together with descriptive terms
application to design and construction should
                                                       regarding weathering, strength, defects, etc.
therefore take into account the spacing of
boreholes or pits, the frequency of sampling,                               Planarity
and the possibility of other than ‘straight line’      CU                  Curved
variations between the test locations.                 DIS                 Discontinuous
                                                       IR                  Irregular
Description and Classification Methods                 PR                  Planar
                                                       ST                  Stepped
The description and classification of soils and        UN                  Undulose
rocks used in this report are based on AS 1726.

Soil types are described according to the
predominating particle size and behaviour as
set out in the attached Unified Soil
Classification Table qualified by the percent of



October 2017                                                                                       pg. 1

Page 14

                  Roughness                        Investigation Methods
POL                Polished
RJ                 Rough                           Test Pits: These are typically undertaken with a
S                  Smooth                          backhoe or a tracked excavator, allowing
SL                 Slickened                       examination of the insitu soils. Limitations of test
VR                 Very Rough
                                                   pits are the problems associated with collapse
                                                   of the pits, disturbance and difficulty of
      Defects                   Type               reinstatement and the consequent effects on
BP                 Bedding Parting                 close-by structures. Care must be taken if
CL                 Cleavage                        construction is to be carried out near test pit
CO                 Contact                         locations to either properly recompact the
CS                 Crushed Seam                    backfill during construction or to design and
CZ                 Crushed Zone
                                                   construct the structure so as not to be
DB                 Drilling Break
                                                   adversely affected by poorly compacted
DK                 Dyke
DL                 Drill Lift                      backfill at the test pit location.
DZ                 Decomposed Zone
FC                 Fracture                        Hand Auger Drilling: A borehole of typical
FL                 Foliation                       diameter of between 50mm to 75mm advance
FZ                 Fracture Zone                   manually operated equipment.         Premature
HB                 Handling Break                  refusal of the hand augers can occur on a
IS                 Infilled Seam                   variety of materials such as fill, gravel, hard
JT                 Joint                           clays and collapse of the borehole (typically in
H                  Schistosity                     non-cohesive soil).
SI                 Sill
SM                 Seam                            Continuous Spiral flight Augers: The borehole is
SS                 Shear Seam                      advanced using 65mm to 100mm diameter
SZ                 Shear Zone
                                                   continuous spiral flight augers, which are
VN                 Vein
                                                   withdrawn at intervals to allow sampling and
VO                 Void
                                                   insitu testing.  Augers of up to 300mm in
Sampling                                           diameter are used to recover larger volumes of
                                                   sample. Samples are returned to the surface
Sampling is undertaken during the fieldwork to     by the flights or may be collected after
allow examination of the soil or rock and to       withdrawal of the auger flights. Samples can
allow laboratory testing to be undertaken.         be disturbed and layers may become mixed.
                                                   Augering below the groundwater table can be
Disturbed samples taken during drilling provide    less reliable than augering above the water
information on plasticity, grain size, colour,     table.
moisture content and minor constituents. Bulk
samples are similar but of greater volume          A Tungsten Carbide (TC) bit for auger drilling
required for some test procedures such as CBR      into rock can be used to indicate rock strength
testing.                                           and continuity by variation in drilling resistance
                                                   and from examination of recovered rock
Undisturbed samples are taken by pushing a         fragments but provides only an indication of
thin-walled sample tube, usually 50mm              the likely rock strength. Where rock strengths
diameter (known as a U50), into the soil and       may have a significant impact on construction
collecting a sample of the soil contained in a     feasibility or costs, then further investigation by
relatively undisturbed state. Such samples yield   means of cored boreholes may be warranted.
information on structure and strength, and are
necessary for laboratory determination of shear    Wash Boring: The borehole is advanced by a
strength and compressibility.       Undisturbed    bit attached to the end of a hollow rod string,
sampling is generally effective only in cohesive   with water being pumped down the drill rods
soils.                                             and returned up the annulus of the borehole,
                                                   carrying the drill cuttings.      Changes in
Details of the type and method of sampling         stratification can be determined from the
used are given on the attached logs.               return, together with information from “feel”
                                                   and rate of penetration.

Page 15

The borehole can be stabilised through the use       using a Cone Penetrometer in            general
of drilling mud as a circulating fluid. The term     accordance with AS 1289 6.5.1, 1999.
‘mud’ encompasses a range of products
ranging from bentonite to polymers such as           In the tests, a 36mm diameter rod with a
Revert or Biogel.                                    conical tip is pushed continuously into the soil,
                                                     the reaction being provided by a hydraulic
Continuous Core Drilling: A continuous core          ram system. Measurements are made of the
sample is obtained using a diamond tipped            end bearing resistance on the cone and the
core barrel. This technique provides a reliable      fractional resistance on a separate 135mm
(but    relatively   expensive)    method     of     long sleeve, immediately behind the cone.
investigation. In rocks, an NMLC triple tube         Pore Pressure is recovered through a pore ring
core barrel is used, which gives a core of about     located either within, or more usually
50mm diameter. The length of core recovered          immediately behind the cone/tip.
is compared to the length drilled and any
length not recovered is shown as CORE LOSS.          As penetration occurs (at a rate of
                                                     approximately 20mm per second) and data is
Standard       Penetration    Tests:     Standard    recorded every 20mm of penetration, the
Penetration Tests (SPT) are used mainly in non-      results are presented graphically.
cohesive soils, but can also be used in cohesive
soils as a means of indicating density or            The information     provided     on    the   plot
strength and also of obtaining a disturbed           comprises:
sample. The test procedure is described in
                                                            Cone resistance – expressed in mPa
Australian Standard 1289, “Methods of Testing
                                                            Sleeve friction – expressed in kPa
Soils for Engineering Purposed”, Test 6.3.1.
                                                            Friction ratio – the ratio of sleeve
The test is carried out in a borehole by driving a           friction to cone resistance expressed as
50mm diameter split sample tube with a                       a percentage.
tapered shoe, under the impact of a 63kg                    Pore pressure in kPa
hammer, with a free fall of 760mm. The sample               Tilt of probe (in degrees).
is driven in three successive 150mm increments
and the ‘N’ value is taken as the number of
                                                     The ratios of the sleeve resistance to cone
blows for the last 300mm. In dense soils, hard
                                                     resistance will vary with the type of soil
clays or weak rock, the full 450mm penetration
                                                     encountered, with higher relative friction in
may not be practicable and the test is
                                                     clays than in sands. Friction ratios of 1% to 2%
discontinued.
                                                     are commonly encountered in sands and rising
The test results are reported in the following       to 2% to as high as 8%, and higher in organic
form:                                                soils.   Soil descriptions based on cone
                                                     resistance and friction ratios are only inferred
       In the case where full penetration is        and must not be considered as exact.
        obtained with successive blow counts
        for each 150mm of , say, 4, 6 and 7          Stratification can be inferred from the cone
        blows, as                                    and friction traces and from experience and
        N = 13                                       information from nearby boreholes, etc. Where
        4, 6, 7                                      shown, this information is presented for general
       In a case where the test is discontinued     guidance, but must be regarded as
        short of full penetration, say after 15      interpretive.
        blows for the first 150mm and 30 blows
                                                     Dynamic Cone Penetrometers:
        for the next 40mm, as
        N > 30
                                                     Dynamic Cone Penetrometer (DCP) tests are
        15, 30/40mm
                                                     carried out by driving a 16mm diameter rod
                                                     into the ground with a 9kg sliding hammer
Cone Penetrometer Testing (CPT): Cone
                                                     dropping 510mm and counting the blows for
Penetrometer Testing with or without pore
                                                     successive 100mm increments of penetration.
pressure measurement (CPTu) is carried out

Page 16

Logs                                                   for fill, it may be difficult to reliably determine
                                                       the extent of the fill.
The borehole or test pit logs are an
interpretation of the subsurface conditions, and       Laboratory Testing
their reliability will depend to some extent on
the frequency of sampling and the method of            Laboratory testing is carried out in general
drilling or excavation.                                accordance with Australian Standard 1289
                                                       ‘Methods of Testing Soil for Engineering
Interpretation of the information shown on the         Purposes’.
logs, and its application to design and
construction, should therefore take into               Site Anomalies
account the spacing of the boreholes or test
                                                       In the event that conditions encountered on
pits, the method of drilling or excavation, the
                                                       site during construction appear to vary from
frequency of sampling and testing and the
                                                       those which were expected from the
possibility of other than “straight line” variations
                                                       information contained in the report, the
between the boreholes or test pits. Subsurface
                                                       company requests that it immediately be
conditions between boreholes or test pits may
                                                       notified. Most problems are much more readily
vary significantly from conditions encountered
                                                       resolved when conditions are exposed than at
at the borehole or test pit locations.
                                                       some later stage.
Groundwater
                                                       Review of Design
Where groundwater levels are measured in
                                                       Where major civil or structural developments
boreholes, there  are   several potential
                                                       are proposed or where only a limited
problems:
                                                       investigation has been completed or where the
         Although      groundwater        may   be    geotechnical conditions/constraints are quite
          present, in low permeability soils it may    complex, it is prudent to have a design review.
          enter the hole slowly or perhaps not at
                                                       Site Inspection
          all during the time it is left open.
         A localised perched water table may
                                                       Pacific Geotech would be pleased to provide
          lead to an erroneous indication of the
                                                       engineering        inspection services   for
          true water table.
                                                       geotechnical aspects of work to which this
         Water table levels will vary from time to
                                                       report is related:
          time with seasons or recent weather
          changes and may not be the same at           Requirements could range from:
          the time of construction.
         The use of water or mud as a drilling           i.    a site visit to confirm that conditions
          fluid will mask any groundwater inflow.               exposed are no worse than those
          Water has to be flushed from the hole                 interpreted, to
          and drilling mud must be washed out            ii.    a visit to assist the contractor or other
          of the hole or ‘reverted’ chemically if               site personnel in identifying various
          water observations are to be made.                    soil/rock types such as appropriate
More reliable measurements can be made by                       footing or pier founding depths, or
installing standpipes from which ongoing                 iii.   full time engineering present on site.
monitoring can be undertaken.

Fill

The present of fill materials can often be
determined only by the inclusion of foreign
objects (e.g. bricks, steel ,etc.) or by distinctly
unusual colour, texture or fabric. Identification
of the extent of fill materials will also depend on
investigation methods and frequency. Where
natural soils similar to those at the site are used

Page 17

Project No. PG-10899
November 2023
Ref: PG-10899, 2023-10-16, ASR VER 3
DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                                                                                                                          APPENDIX B
                                                                                    BOREHOLE RECORD SHEETS

Page 18

                                                                                                                                                                                                                                                                                                                                                                                                              Borehole No.

                                                                                                                                                                                                                                                                                                                                                                                                                   BH01
                                                                                                                                                                                                                                                                                                                                                                                                              Page 1 of 2

                                                                                                                                                                                                                                                                                                                                                       Project No.:             PG-10899

                                                                                                                                                                                                            Client:                          DD Sunnyside CD Sunnyside Pty Ltd                                                                         Commenced:               06/10/2023
                                                                                                                                                                                                            Project Name:                    Proposed Residence                                                                                        Logged By:               RR
                                                                                                                                                                                                            Hole Location:                   30 Mossman Court, Noosa Heads                                                                             Checked By:
                                                                                                                                                                                                            Hole Position:
                                                                                                                                                                                                            Drill Model and Mounting:                          Compac 018                                                                              RL Surface:         No survey
                                                                                                                                                                                                            Hole Diameter:                                                                                                                             Datum:              AHD              Operator:    RR

                                                                                                                                                                                                                                  Drilling Information                                                                            Soil Description                                                           DCP



                                                                                                                                                                                                                                                                                                Classification
                                                                                                                                                                                                                                                                                Graphic Log
                                                                                                                                                                                                                                     Samples                                                                                              Material Description
                                                                                                                                                                                                                                                    Recovery




                                                                                                                                                                                                                                      Tests                                                                                       Fraction, Colour, Structure, Bedding,
                                                                                                                                                                                                                                                                                                Symbol
                                                                                                                                                                                                        Method

                                                                                                                                                                                                                 Casing




                                                                                                                                                                                                                                     Remarks                                                                                        Plasticity, Sensitivity, Additional
                                                                                                                                                                                                                          Water




                                                                                                                                                                                                                                                               RL    Depth
                                                                                                                                                                                                                                                               (m)    (m)                                                                                                               0       5       10     15    20   25

                                                                                                                                                                                                                                                                                                                 Concrete (CCT)
                                                                                                                                                                                                                                                                         0.15
                                                                                                                                                                                                                                                                                                   SP            FILL SAND (SP) Very loose to loose, fine to medium grained, pale
                                                                                                                                                                                                                                                                                                                 yellow brown, moist.


                                                                                                                                                                                                                                  ASS 0.50-1.00 m




                                                                                                                                                                                                                                                                     1
                                                                                                                                                                                                                                  ASS 1.00-1.50 m
                                                                                                                                                                                                                                  D 1.10-1.50 m




                                                                                                                                                                                                                                  ASS 1.50-2.00 m
ER PACGEO 1.01.2 LIB.GLB Log PACGEO BOREHOLE PG-10899.GPJ <<DrawingFile>> 17/10/2023 10:45 10.03.00.09 Datgel Lab and In Situ Tool - DGD | Lib: pacgeo 1.01.2 2022-05-25 Prj: Precise 1.01 2016-11-23




                                                                                                                                                                                                                                                                     2
                                                                                                                                                                                                                                  ASS 2.00-2.50 m

                                                                                                                                                                                                                                                                         2.30
                                                                                                                                                                                                                                                                                                   SP            NATURAL SAND (SP) Medium dense, fine to medium grained, pale
                                                                                                                                                                                                                                                                                                                 yellow brown, moist.
                                                                                                                                                                                                        AD/T




                                                                                                                                                                                                                                  ASS 2.50-3.00 m
                                                                                                                                                                                                                                  D 2.60-3.00 m
                                                                                                                                                                                                                                                                         2.80
                                                                                                                                                                                                                                                                                                   SP            SAND (SP) Medium dense to dense, fine to medium grained, pale grey,
                                                                                                                                                                                                                                                                                                                 wet.
                                                                                                                                                                                                                                                                     3
                                                                                                                                                                                                                                  ASS 3.00-3.50 m




                                                                                                                                                                                                                                  ASS 3.50-4.00 m




                                                                                                                                                                                                                                                                     4
                                                                                                                                                                                                                                                                         4.10
                                                                                                                                                                                                                                  D 4.10-4.50 m                                                    SP            SAND (SP) Medium dense, fine to medium grained, pale grey, wet.




                                                                                                                                                                                                                 Method                                                                       Water                               Samples and Tests                  Remarks
                                                                                                                                                                                                            AS - Auger                                                                 Level (Date)                        U - Undisturbed Sample
                                                                                                                                                                                                            RR - Rock Roller                                                                                               D - Disturbed Sample                      1. Groundwater encountered at 2.80m.
                                                                                                                                                                                                            WB- Washbore                                                               Inflow                              SPT - Standard Penetration Test           2. DCP refusal at 3.07m.
                                                                                                                                                                                                                                                                                                                           B - Bulk Sample                           3. Standpipe installed to 3.15m.


                                                                                                                                                                                                                                                                                                                               Classification Symbols and
                                                                                                                                                                                                                   Support                                                                                                          Soil Descriptions
                                                                                                                                                                                                                  C - Casing
                                                                                                                                                                                                                                                                                                                                  Based on Unified Soil
                                                                                                                                                                                                                                                                                                                                  Classification System

Page 19

                                                                                                                                                                                                                                                                                                                                                                                                            Borehole No.

                                                                                                                                                                                                                                                                                                                                                                                                                 BH01
                                                                                                                                                                                                                                                                                                                                                                                                            Page 2 of 2

                                                                                                                                                                                                                                                                                                                                                     Project No.:             PG-10899

                                                                                                                                                                                                            Client:                          DD Sunnyside CD Sunnyside Pty Ltd                                                                       Commenced:               06/10/2023
                                                                                                                                                                                                            Project Name:                    Proposed Residence                                                                                      Logged By:               RR
                                                                                                                                                                                                            Hole Location:                   30 Mossman Court, Noosa Heads                                                                           Checked By:
                                                                                                                                                                                                            Hole Position:
                                                                                                                                                                                                            Drill Model and Mounting:                        Compac 018                                                                              RL Surface:         No survey
                                                                                                                                                                                                            Hole Diameter:                                                                                                                           Datum:              AHD              Operator:    RR

                                                                                                                                                                                                                                  Drilling Information                                                                         Soil Description                                                            DCP



                                                                                                                                                                                                                                                                                              Classification
                                                                                                                                                                                                                                                                              Graphic Log
                                                                                                                                                                                                                                     Samples                                                                                            Material Description
                                                                                                                                                                                                                                                  Recovery




                                                                                                                                                                                                                                      Tests                                                                                     Fraction, Colour, Structure, Bedding,
                                                                                                                                                                                                                                                                                              Symbol
                                                                                                                                                                                                        Method

                                                                                                                                                                                                                 Casing




                                                                                                                                                                                                                                     Remarks                                                                                      Plasticity, Sensitivity, Additional
                                                                                                                                                                                                                          Water




                                                                                                                                                                                                                                                             RL    Depth
                                                                                                                                                                                                                                                             (m)    (m)                                                                                                               0       5       10     15    20   25

                                                                                                                                                                                                                                                                                                 SP            SAND (SP) Medium dense, fine to medium grained, pale grey, wet.
                                                                                                                                                                                                                                                                                                               (continued)




                                                                                                                                                                                                                                                                   6




                                                                                                                                                                                                                                                                       6.60
ER PACGEO 1.01.2 LIB.GLB Log PACGEO BOREHOLE PG-10899.GPJ <<DrawingFile>> 17/10/2023 10:45 10.03.00.09 Datgel Lab and In Situ Tool - DGD | Lib: pacgeo 1.01.2 2022-05-25 Prj: Precise 1.01 2016-11-23




                                                                                                                                                                                                                                                                                                SM             Silty SAND (SM) Dense to very dense, fine to medium grained, dark
                                                                                                                                                                                                                                                                                                               brown, wet (indurated sand).
                                                                                                                                                                                                        AD/T




                                                                                                                                                                                                                                                                   7




                                                                                                                                                                                                                                                                   8




                                                                                                                                                                                                                                  D 8.60-9.00 m



                                                                                                                                                                                                                                                                       9.00
                                                                                                                                                                                                                                                                   9
                                                                                                                                                                                                                                                                                                               Hole Terminated at 9.00 m




                                                                                                                                                                                                                 Method                                                                     Water                              Samples and Tests                   Remarks
                                                                                                                                                                                                            AS - Auger                                                               Level (Date)                       U - Undisturbed Sample
                                                                                                                                                                                                            RR - Rock Roller                                                                                            D - Disturbed Sample                       1. Groundwater encountered at 2.80m.
                                                                                                                                                                                                            WB- Washbore                                                             Inflow                             SPT - Standard Penetration Test            2. DCP refusal at 3.07m.
                                                                                                                                                                                                                                                                                                                        B - Bulk Sample                            3. Standpipe installed to 3.15m.


                                                                                                                                                                                                                                                                                                                             Classification Symbols and
                                                                                                                                                                                                                   Support                                                                                                        Soil Descriptions
                                                                                                                                                                                                                  C - Casing
                                                                                                                                                                                                                                                                                                                                Based on Unified Soil
                                                                                                                                                                                                                                                                                                                                Classification System

Page 20

                                                                                                                                                                                                                                                                                                                                                                                                          Borehole No.

                                                                                                                                                                                                                                                                                                                                                                                                               HA02
                                                                                                                                                                                                                                                                                                                                                                                                          Page 1 of 1

                                                                                                                                                                                                                                                                                                                                                   Project No.:             PG-10899

                                                                                                                                                                                                            Client:                         DD Sunnyside CD Sunnyside Pty Ltd                                                                      Commenced:               06/10/2023
                                                                                                                                                                                                            Project Name:                   Proposed Residence                                                                                     Logged By:               RR
                                                                                                                                                                                                            Hole Location:                  30 Mossman Court, Noosa Heads                                                                          Checked By:
                                                                                                                                                                                                            Hole Position:
                                                                                                                                                                                                            Drill Model and Mounting:                      Hand Auger                                                                              RL Surface:         No survey
                                                                                                                                                                                                            Hole Diameter:                                                                                                                         Datum:              AHD              Operator:    RR

                                                                                                                                                                                                                                  Drilling Information                                                                       Soil Description                                                            DCP



                                                                                                                                                                                                                                                                                            Classification
                                                                                                                                                                                                                                                                            Graphic Log
                                                                                                                                                                                                                                     Samples                                                                                          Material Description
                                                                                                                                                                                                                                                Recovery




                                                                                                                                                                                                                                      Tests                                                                                   Fraction, Colour, Structure, Bedding,
                                                                                                                                                                                                                                                                                            Symbol
                                                                                                                                                                                                        Method

                                                                                                                                                                                                                 Casing




                                                                                                                                                                                                                                     Remarks                                                                                    Plasticity, Sensitivity, Additional
                                                                                                                                                                                                                          Water




                                                                                                                                                                                                                                                           RL    Depth
                                                                                                                                                                                                                                                           (m)    (m)                                                                                                               0       5       10     15    20   25

                                                                                                                                                                                                                                                                                              SM             FILL Silty SAND (SM) Loose, fine to medium grained, dark brown, with
                                                                                                                                                                                                                                                                                                             fine sized gravel, dry.
                                                                                                                                                                                                        HA




                                                                                                                                                                                                                                                                     0.60
                                                                                                                                                                                                                                                                                               SP            FILL SAND (SP) Loose, fine to medium grained, pale yellow brown,
                                                                                                                                                                                                                                                                                                             moist to dry.


                                                                                                                                                                                                                                                                     1.00
                                                                                                                                                                                                                                                                 1
                                                                                                                                                                                                                                                                                                             Hole Terminated at 1.00 m
ER PACGEO 1.01.2 LIB.GLB Log PACGEO BOREHOLE PG-10899.GPJ <<DrawingFile>> 17/10/2023 10:45 10.03.00.09 Datgel Lab and In Situ Tool - DGD | Lib: pacgeo 1.01.2 2022-05-25 Prj: Precise 1.01 2016-11-23




                                                                                                                                                                                                                                                                 2




                                                                                                                                                                                                                                                                 3




                                                                                                                                                                                                                                                                 4




                                                                                                                                                                                                                 Method                                                                   Water                              Samples and Tests                   Remarks
                                                                                                                                                                                                            AS - Auger                                                             Level (Date)                       U - Undisturbed Sample
                                                                                                                                                                                                            RR - Rock Roller                                                                                          D - Disturbed Sample                       1. Groundwater not encountered.
                                                                                                                                                                                                            WB- Washbore                                                           Inflow                             SPT - Standard Penetration Test            2. DCP refusal at 2.38m.
                                                                                                                                                                                                                                                                                                                      B - Bulk Sample


                                                                                                                                                                                                                                                                                                                           Classification Symbols and
                                                                                                                                                                                                                   Support                                                                                                      Soil Descriptions
                                                                                                                                                                                                                  C - Casing
                                                                                                                                                                                                                                                                                                                              Based on Unified Soil
                                                                                                                                                                                                                                                                                                                              Classification System

Page 21

Project No. PG-10899
November 2023
Ref: PG-10899, 2023-10-16, ASR VER 3
DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                                                                                                                          APPENDIX C
                                                                       LABORATORY TEST CERTIFICATES

Page 22

                                                                         pH Screen Report
    CLIENT:                          DD Sunnyside CD Sunnyside Pty Ltd                  PROJECT NUMBER:                                          PG-10899
    ADDRESS:                          30 Mossman Court, Noosa Heads                     REPORT NUMBER:                             23-536           Rev. No.0
                                                                                        REPORT DATE:                                             10.10.23
    PROJECT NAME:                              Proposed Residence
                                                                                        TEST METHOD:                                              ENV04

                                                                        SAMPLE LOCATION
                                SAMPLING METHOD:                                                                                 Disturbed
                                   SAMPLED BY:                                                                                 Pacific Geotech
                                  DATE SAMPLED:                                                                                    6.10.23
                                  DATE RECEIVED:                                                                                   9.10.23
                                   DATE TESTED:                                                                                    9.10.23


                                     Sample
       Lab Ref. No.                                              Depth (m)                     pH                   pHFOX                   pHFOX Reaction Rating
                                    Description
    E23-536-1                             BH01                           0.5                   6.4                       5.1                             X
    E23-536-2                             BH01                           1.0                   6.3                       5.2                             X
    E23-536-3                             BH01                           1.5                   6.6                       5.1                             X
    E23-536-4                             BH01                           2.0                   6.5                       5.1                             X
    E23-536-5                             BH01                           2.5                   6.5                       5.1                             X
    E23-536-6                             BH01                           3.0                   5.7                       3.1                             XX
    E23-536-7                             BH01                           3.5                   5.2                       3.0                            XXXX
    E23-536-8                             BH01                           4.0                   4.8                       3.0                            XXXX

                                                       pH Screen Reaction Rating Table
                                                  Reaction Scale                            Reaction
                                                            X                           Slight Reaction
                                                            XX                          Moderate Reaction
                                                            XXX                         High Reaction
                                                            XXXX                        Vigorous Reaction, gas evolved, heat generated

   Pacific Geotech accepts no responsibilty for the collection and transport of samples submitted by external parties.
   Measurement uncertainty data is available upon request. LOR denotes Limit of Reporting
   All samples are analysed on an as received basis and the results in rhis report pertain only to the sample submitted.
   This report supercedes any previous report(s) issued with this reference number. This document shall not be reproduced except in full.

                     Accredited for Compliance with ISO/IEC 17025 - Testing                          Approved Signatory

                           Pacific Geotech Pty Ltd - Accreditation No. 21130
                                                                                                         Daryl Surkitt
                                Gold Coast Laboratory - Site No. 25487                       Environmental Laboratory Manager


Form ER003.1.




                                                                                                                                                                Page 1 of 1

Page 23

                                                                                              Acid Sulfate Soil Report
CLIENT:                                                     DD Sunnyside CD Sunnyside Pty Ltd                  PROJECT NUMBER:                                                         PG-10899
ADDRESS:                                                 30 Mossman Court, Noosa Heads                         REPORT NUMBER:                                         23-537                Rev. No.0
PROJECT NAME:                                                 Proposed Residence                               REPORT DATE:                                                            13.10.23


                                                                                                          SAMPLE LOCATION
                                         SAMPLING METHOD:                                                                                                         Disturbed
                                            SAMPLED BY:                                                                                                         Pacific Geotech
                                           DATE SAMPLED:                                                                                                            6.10.23
                                           DATE RECEIVED:                                                                                                           9.10.23
                                            DATE TESTED:                                                                                                            9.10.23
                                   PREPERATION/ANALYSIS METHOD:                                                                                                 ENV01/ENV02


Lab Ref Number                                                             E23-537-1            E23-537-2       E23-537-3            E23-537-4
Sample Description                            Unit             LOR           BH01                 BH01            BH01                 BH01
Depth (m)                                                                     1.0                  2.0             3.0                  4.0
pHKCL                                        pH Unit            0.1              6.4                     6.6          5.3                 5.1
Chromium Reducible Sulfur                    %w/w S           0.005            <0.005                0.017          0.037                0.056
Chromium Reducible Sulfur                   mol H+/t             3                <3                     11           23                   35
TAA pH to 6.5                               mol H+/t             2                <2                     <2           <2                   <2
s-TAA pH to 6.5                              %w/w S           0.005            <0.005               <0.005          <0.005              <0.005
KCl Ext S                                    %w/w S           0.005             0.006                0.005          0.006                0.006
HCl Ext S                                    %w/w S           0.005             0.012                0.010          0.015                0.012
Retained Acidity (SNAS)                      %w/w S           0.005              N/R                     N/R         N/R                  N/R
Retained Acidity (SNAS)                     mol H+/t             3               N/R                     N/R         N/R                  N/R
ANC                                         %CaCO3              0.1              0.1                     0.1          0.1                 0.1
ANC                                         mol H+/t             5                12                     13           13                   11
Net Acidity                                 mol H+/t             5                <5                     11           23                   35
Net Acidity                                  %w/w S           0.005            <0.005                0.018          0.037                0.056
Net Acidity - ANC                           mol H+/t             1                <1                     <1           10                   24
Liming Rate                                kg CaCO3/t            1                <1                      1            2                    3
Liming Rate - ANC                          kg CaCO3/t            1                <1                     <1            1                    2

Liming rate only includes ANC when its effectiveness has been corroborated by simulative oxidation procedures such as incubation. Unless corroborated, the results for ANC analyses should not be used when determining Net Acidity for
for comparison with action criteria. The Liming Rate-ANC calculation is only inluded when the amount of acid neutralising present in the soil is capable of buffering the soil at pH 6.5 or above. A liming safety factror of 1.5 has been applied.
Results apply to samples that have been dried at 85±5oC. LOR denotes Limit of Reporting. N/R denotes Not Required. The results in this report pertain only to the samples as received. This document shall not be reproduced except in full.
Method uncertainty data is available at www.pacgeo,com,au/safety-and -quality-assurance. This report supercedes anty previous report(s) isssued with this reference number.
Pacific Geotech accepts no responsibilty for the collection and transport of samples submitted by external parties.




                                               Accredited for Compliance with ISO/IEC 17025 - Testing                              Approved Signatory

                                                     Pacific Geotech Pty Ltd - Accreditation No. 21130
                                                                                                                                       Daryl Surkitt
                                                         Gold Coast Laboratory - Site No. 25487                              Environmental Laboratory Manager


Form ER004.1




                                                                                                                                                                                                                                                      Page 1 of 1

Page 24

Project No. PG-10899
November 2023
Ref: PG-10899, 2023-10-16, ASR VER 3
DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                                                                                                                          APPENDIX D
                                                                                                                            SITE PLAN

Page 25

HA02




                        BH01




   Drawn
            Project:    Proposed Residence
    RM
                                                            Drawing No.
    Date
            Location:   30 Mossman Court, Noosa Heads                     A4
   Oct 23
                                                            PG-10899-01
  Checked
             Client:    DD Sunnyside CD Sunnyside Pty Ltd

Page 26

Project No. PG-10899
November 2023
Ref: PG-10899, 2023-10-16, ASR VER 3
DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Investigation - Proposed Residence, 30 Mossman Court, Noosa Heads




                                                                                                                          APPENDIX E
                                                 ACID SULFATE SOIL MANAGEMENT PLAN

Page 27

Project No. PG-10899                                                                                                        Page | 1
November 2023
Ref: PG-10899, 2023-10-16, ASSMP VER 2
DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Management Plan – Proposed Residence, 30 Mossman Court, Noosa Heads




                  ACID SULFATE SOIL MANAGEMENT PLAN (ASSMP)
                                    PROPOSED RESIDENCE
                              30 MOSSMAN COURT, NOOSA HEADS
Objective                            The objective of the ASSMP is to control any acid generation from
                                     insitu ASS materials and to restrict to an acceptable level any
                                     potential on-site and off-site environmental impacts. A further
                                     objective is to manage earthworks activities and provide measures
                                     to maintain water quality within the site and in adjacent areas.
Proposed                             It is understood that the proposed development is to comprise the
Development                          construction of a two storey residence with a basement.
                                     Earthworks are envisaged to consist of cuts of up to 3m for the
                                     basement.        A total volume of material to be disturbed is
                                     approximately 900m3. Additional investigation and testing will be
                                     required to confirm the results and recommendations of this
                                     management plan.
Subsurface                           Mapping
Conditions                           The site is located in an area that is mapped on the Noosa Council
                                     Acid Sulfate Soils Mapping as Disturbed Land likely to contain ASS.
                                     ASS Investigation
                                     Drilling and sampling encountered a reasonably consistent profile
                                     of sand that:
                                     • did not indicate any obvious ASS presence from a visual and
                                           tactile perspective in the fill or the natural profile.
                                     •     indicated that the upper level sands were not acid sulfate soils
                                           and the lower level sands below 3.0m indicated a low level of
                                           acid sulfate soil present.
                                     •     had the highest liming rate required to neutralise the acidity of
                                           4kg/m3 (based on laboratory testing of selected samples) for
                                           the lower level sands.
                                     •     The proposed excavations for the basement (up to 3.0m
                                           depth)are not expected to disturb the acid sulfate soils but may
                                           just indicate the acid sulfate strata.
Management                           To mitigate and manage potential adverse environmental impacts
Strategy                             during site construction operations, the following will be
                                     undertaken:
                                     • an ASS consultant should review the site earthworks schedule
                                         and plan of operations;
                                     •     adoption of appropriate erosion control measures to limit
                                           sediment loss due to run-off from site works area;
                                     •     where excavation below the water table, or if disturbance of
                                           any silty sands is necessary, a materials handling and
                                           management strategy and procedures for lime treatment of
                                           any disturbed material will be required;
                                     •     monitoring and treatment (if necessary) of waters in detention
                                           basins to a level suitable for discharge into external waterways;
                                           and
                                     •     site supervision by approved persons and regular reporting to
                                           the Project Engineer/Manager throughout the construction
                                           phase.

Page 28

Project No. PG-10899                                                                                                        Page | 2
November 2023
Ref: PG-10899, 2023-10-16, ASSMP VER 2
DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Management Plan – Proposed Residence, 30 Mossman Court, Noosa Heads




Tasks/Actions                        Investigations of ASS to date have targeted soils to a maximum
                                     depth of 4.0m below the existing ground level. Zones of materials
                                     with nett acidity above the action criteria have been identified
                                     over the site at depths greater than 3m below ground level. The
                                     materials to a depth of approximately 3.0m have been shown by
                                     testing to not contain acid sulfate. If material below 3m is disturbed
                                     they will require lime treatment to neutralize acidity.

                                     In order to assess potential impacts and treatment requirements for
                                     ASS, the Earthworks Contractor shall prepare an earthworks
                                     schedule for the proposed construction activities prior to
                                     commencement of the construction and earthworks activities.
                                     ASS Treatment:
                                     The spoil to be removed from site will either be treated onsite prior
                                     to removal, or:
                                     • treated on-site in accordance with the procedures given below;
                                         or
                                           −   A temporary stockpile and treatment area will be
                                               established where all excavated material may be
                                               conditioned (dried) and lime treated, for subsequent use for
                                               site landscaping or general fill requirements.
                                           − Bunding will be constructed around the perimeter of the
                                               designated ASS treatment pad to intersect and contain run-
                                               off from the pad during the soil treatment operations.
                                           − A suitably sized drain or temporary retention basin will be
                                               constructed to collect drainage water from the treatment
                                               pad in the vent of heavy rainfall during the construction
                                               period. This will be constructed in a manner to protect
                                               water quality in adjacent waterways.
                                           − Alternatively, the basement excavation can be used as a
                                               treatment platform with drainage water or run-off collected
                                               in the retention basin will be tested to determine the quality
                                               of the water.        If the water quality falls outside the
                                               performance indicators (described below), the water will
                                               be treated prior to discharge from the site.
                                           − The excavated spoil will be spread out in a designated
                                               treatment area in layers up to 0.25m loose thickness. Aglime
                                               with a neutralising value of 100% will be applied evenly over
                                               the surface and thoroughly blended into the spoil at a
                                               uniform minimum rate of 4kg (CaC0 3 )/m3.
                                           − When incorporation of the lime is complete, Chromium Suite
                                               validation testing of the treated spoil will be carried out to
                                               establish that sufficient lime has been added (and uniformly
                                               mixed) to neutralise the acid generation potential of the
                                               spoil. The validation test will be deemed to have passed if
                                               the net acidity is 18 mol H+/t. A higher result will require the
                                               application of additional lime, until a satisfactory validation
                                               result has been achieved.
                                           − Once lime treatment is complete, the treated spoil will be
                                               removed from site or may then be stockpiled for later use
                                               for landscaping or for general site fill requirements.
                                           − Selection of the most appropriate test methods and
                                               determination of liming requirements for neutralisation will
                                               be the responsibility of the ASS Consultant.
                                     •     Treated at an off-site facility in accordance with the approved
                                           ASSMP for the facility.

Page 29

Project No. PG-10899                                                                                                        Page | 3
November 2023
Ref: PG-10899, 2023-10-16, ASSMP VER 2
DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Management Plan – Proposed Residence, 30 Mossman Court, Noosa Heads




Performance                          ASS
Indicators                           Chromium Suite testing carried out for validation of applied liming
                                     rates will be deemed to be acceptable if the net acidity recorded
                                     is 18 mol H+/t.

                                     Water
                                     Laboratory testing of retained water will be carried out for pH,
                                     electrical conductivity (ED), iron (Fe), aluminium (Al), dissolved
                                     oxygen and turbidity. Levels of these parameters considered
                                     acceptable are as follows:

                                     pH                              6.5 to 8.5 pH units
                                     EC                              <1,500 S/cm
                                     Fe                              <1,000 ug/L
                                     Al                              <5.0 ug/L if pH <= 6.5 pH units
                                                                     <100.0 ug/L if pH > 6.5 pH units
                                     Turbidity                       <20NTU
                                     Dissolved Oxygen                >80% saturated

                                     Testing for the Fe and Al will only be necessary if the pH of the water
                                     falls below pH 6.0.
Frequency/Timing                     ASS
                                     The sampling and testing of any lime treated material will be
                                     subject to QA testing, which will be repeated until satisfactory
                                     results are obtained. Chromium Suite validation testing will be
                                     carried out at a rate of 1 test/250m3 of treated spoil.

                                     Water
                                     The following monitoring frequency is recommended during
                                     dewatering operations (if required):
                                     • daily measurements of pH, dissolved oxygen (DO), turbidity and
                                        suspended solids; and
                                     •     weekly measurements of the full list of Performance Indicators
                                           nominated above (if dewatering has been required).
                                     If the results of monitoring prove consistent, the frequency of
                                     monitoring may be reduced, subject to the approval of the ASS
                                     Consultant.
Corrective Action                    ASS
                                     If lime treatment of ASS is unsuccessful, whereby performance
                                     targets are not being met as indicated by the QA and water quality
                                     testing procedures:
                                     • The earthworks schedule will be reassessed and action taken to
                                          determine the problems causing the breach of standards.
                                     •     If the problems are related to ineffective implementation of the
                                           ASSMP, then the plan will be audited to ensure improved
                                           implementation. Monitoring and testing will be increased to
                                           ensure compliance with the established standards.
                                     •     Any significant changes to the ASSMP will be subject to
                                           discussions with and the approval of, the relevant regulatory
                                           authorities.
                                     Water
                                     Compliance failures regarding specified performance criteria shall
                                     be recorded including the date, time, nature of failure and actions
                                     taken to rectify the situation. Monitoring results should be reviewed

Page 30

Project No. PG-10899                                                                                                        Page | 4
November 2023
Ref: PG-10899, 2023-10-16, ASSMP VER 2
DD Sunnyside CD Sunnyside Pty Ltd – Acid Sulfate Soil Management Plan – Proposed Residence, 30 Mossman Court, Noosa Heads




                                     in relation to site management practices on a regular basis and
                                     improvement strategies should be developed as required.
Responsibility                       The satisfactory implementation of the ASSMP will be the
                                     responsibility of the Earthworks Contractor. The ASS Consultant will
                                     ensure that:
                                     • the contractor is made aware of site specific conditions and
                                         implications for the management of ASS within the site; and
                                     •     correct methods for the collection of samples and testing are
                                           employed and the reporting of results to the relevant site
                                           authorities.
                                     The Earthworks Contractor’s responsibilities will include:

                                     •     awareness of site conditions and requirements for the
                                           implementation of the ASSMP;
                                     •     modifying earthworks/construction procedures to comply with
                                           the ASSMP and erosion control plan;
                                     •     propose any corrective action measures to be approved by
                                           the ASS Consultant; and
                                     •     implementing approved correction actions.
Reporting                            The ASS Consultant shall report to the Project Manager on a regular
                                     basis on the performance of the site management plan.

                                     The Contractor’s Representative shall report to the Project
                                     Manager and to the ASS Consultant on:

                                     •     the effectiveness of the operating strategies;
                                     •     problems in implementing the ASSMP management strategies;
                                     •     compliance with testing requirements run-off control and
                                           materials handling; and
                                     •     effectiveness of any corrective action adopted.

Used in these records

About this file

File size
2.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Pacific Geotech report Nov 2023 v3.pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.