Original source · versioned page text
Engineering Drawings Part 1 - OPW14/0197
Attached to the e-mail Doonella Stage C (Email 2 of 7) Engineering Drawings Part 2 - OPW14/0197.
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
N13078-100
N13078-101
N13078-102
N13078-103
N13078-104
N13078-105
N13078-106
N13078-107
N13078-108
N13078-109
N13078-110
N13078-111
N13078-112
N13078-113
N13078-114
N13078-115
N13078-116
N13078-117
N13078-118
N13078-119
N13078-120
N13078-121
N13078-122
N13078-123
N13078-124
N13078-125
N13078-126
N13078-127
N13078-128
N13078-129
N13078-130
N13078-131
N13078-132
N13078-133
N13078-134
N13078-135
N13078-136
N13078-137
N13078-138
N13078-139
N13078-140
N13078-200
N13078-201
N13078-202
N13078-203
N13078-204
N13078-205
N13078-206
N13078-300
N13078-301
N13078-302
LAKE DOONELLA NOOSA
STAGES C1-C6
DRAWING INDEX
ROADWORKS AND DRAINAGE
DRAWING INDEX, LAYOUT AND LOCALITY PLAN
SURVEY SETOUT PLAN SHEET 1 OF 3
SURVEY SETOUT PLAN SHEET 2 OF 3
SURVEY SETOUT PLAN SHEET 3 OF 3
SEDIMENT AND EROSION CONTROL PLAN 1 SHEET 1 OF 3
SEDIMENT AND EROSION CONTROL PLAN 1 SHEET 1 OF 3
SEDIMENT AND EROSION CONTROL PLAN 1 SHEET 1 OF 3
BULK EARTHWORKS LAYOUT PLAN SHEET 1 OF 3
BULK EARTHWORKS LAYOUT PLAN SHEET 2 OF 3
BULK EARTHWORKS LAYOUT PLAN SHEET 3 OF 3
ROADWORKS AND DRAINAGE LAYOUT PLAN SHEET 1 OF 3
ROADWORKS AND DRAINAGE LAYOUT PLAN SHEET 2 OF 3
ROADWORKS AND DRAINAGE LAYOUT PLAN SHEET 3 OF 3
AGATHIS PLACE LONGITUDINAL SECTION
AGATHIS PLACE CROSS SECTIONS
CARISSA PLACE LONGITUDINAL SECTION
CARISSA PLACE CROSS SECTIONS
DODONAEA CLOSE LONGITUDINAL SECTION AND CROSS SECTIONS
MORINDA CIRCUIT LONGITUDINAL SECTION AND CROSS SECTIONS
MULBERRY CLOSE LONGITUDINAL SECTION AND CROSS SECTIONS
SHIRE DRIVE LONGITUDINAL SECTION
SHIRE DRIVE CROSS SECTIONS SHEET 1 OF 2
SHIRE DRIVE CROSS SECTIONS SHEET 2 OF 2
TWIGRUSH COURT LONGITUDINAL SECTION AND CROSS SECTIONS
INTERSECTION DETAILS AND SIGNS AND LINEMARKING PLAN SHEET 1 OF 3
INTERSECTION DETAILS AND SIGNS AND LINEMARKING PLAN SHEET 2 OF 3
INTERSECTION DETAILS AND SIGNS AND LINEMARKING PLAN SHEET 3 OF 3
STORMWATER DRAINAGE CATCHMENT PLAN
STORMWATER DRAINAGE BIO DETENTION BASIN A LAYOUT PLAN AND SECTIONS
STORMWATER DRAINAGE BIO DETENTION BASIN B LAYOUT PLAN AND SECTIONS
STORMWATER DRAINAGE BIO DETENTION BASIN C LAYOUT PLAN AND SECTIONS
STORMWATER DRAINAGE BIO DETENTION NOTES AND DETAILS
STORMWATER DRAINAGE LONGITUDINAL SECTIONS SHEET 1 OF 4&
STORMWATER DRAINAGE LONGITUDINAL SECTIONS SHEET 2 OF 4
STORMWATER DRAINAGE LONGITUDINAL SECTIONS SHEET 3 OF 4
STORMWATER DRAINAGE LONGITUDINAL SECTIONS SHEET 4 4
STORMWATER DRAINAGE CALCULATIONS TABLE SHEET 1 OI
STORMWATER DRAINAGE CALCULATIONS TABLE SHEET 2 OI
STORMWATER DRAINAGE CALCULATIONS TABLE SHEET 3 OI
STORMWATER DRAINAGE CALCULATIONS TABLE SHEET 4 OI
STORMWATER DRAINAGE STRUCTURE DETAILS
\F
F
4
F 4
Fo4
Fa
SEWERAGE RETICULATION
SEWERAGE RETICULATION LAYOUT PLAN SHEET 1 OF 3
SEWERAGE RETICULATION LAYOUT PLAN SHEET 2 OF 3
SEWERAGE RETICULATION LAYOUT PLAN SHEET 3 OF 3
SEWERAGE RETICULATION LONGITUDINAL SECTIONS SHEET 1
SEWERAGE RETICULATION LONGITUDINAL SECTIONS SHEET 2
SEWERAGE RETICULATION LONGITUDINAL SECTIONS SHEET 3
SEWERAGE RETICULATION LONGITUDINAL SECTIONS SHEET 4
WATER RETICULATION
WATER RETICULATION LAYOUT PLAN SHEET 1 OI
WATER RETICULATION LAYOUT PLAN SHEET 2 OF
WATER RETICULATION LAYOUT PLAN SHEET 3 OF
FILE: NIBO78-100.dwg DATE; 24-04-2014 TIME: 1354
Xref's: X-NBBOI8-TIT X-NIBO78-BASE USR: joshua lynch
BECKMANS ROAD, NOOSAVILLE
FOR QM PROPERTIES
Itt |
EXISTING
STAGE B4
SHIRE DRIVE
DODONAEA CL
Ei LAT
a Ia FONE
i Ye NOS) Ix Ape
Si F Bs Birsey _
— 2 JUL
== 5/8 “Grtoon
iene —_ =—__1
{e178
STAGE C1
SITE PLAN
SCALE 1:2000
CONSTRUCTION HOLD POINT
PRIOR TO CONSTRUCTION THE CONTRACTOR
SHALL VERIFY LEVELS OF ALL EXISTING
CROSSINGS AND CONNECTION POINTS.
LOCALITY PLAN
N.T.S.
U.B.D. REF: AUSTRALIAN CITY STREETS VERSION: 6.0.0
(SUNSHINE COAST) MAP: 18 | GRID: A1
R.P. DESCRIPTION
LOT 7 ON RP80412
AND PART OF
LOT 800 ON SP153455
PARISH OF TEWANTIN
COUNTY OF MARCH
NOTE:
IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO CONTACT ALL RELEVANT
SERVICE AUTHORITIES TO VERIFY THE
LOCATION OF ALL EXISTING SERVICES
PRIOR TO START OF CONSTRUCTION.
CONSTRUCTION HOLD POINT
ONCE THE BASE OF MANHOLES, INSPECTION PITS, GULLIES AND
FIELD INLETS FOR STORMWATER DRAINAGE AND SEWER
RETICULATION HAVE BEEN POURED, FURTHER CONSTRUCTION
SHALL NOT PROCEED UNTIL THE SUPERINTENDENT AND OR
ENGINEER HAVE INSPECTED THE WORKS FOR FINISHED LEVELS
AND APPROVED CONSTRUCTION TO CONTINUE.
TOTAL No OF LOTS - 66
STAGE C1 - 9
STAGE (2 - 11
STAGE (3 - 11
STAGE C4 - 16
STAGE (5 - 9
STAGE C6 - 10
AREA OF SITE - 9.05 Ha
FRET [CALCS [DRAWN] _OATE
vesue TTF TL | eon
"SCALE (METRES 7
AMENDMENT DETAILS. DESIGN CHECK
=>
12000 20100 20 40 60-80
DRAWN cHECK | 4000
= eo[@]>
@szmzozm
SURVEYOR: RPS
1 INNOVATION PARKWAY, BIRTINYA
Ph (07) 5436 7888 Fax (07) 5493 6630
APPROVED ‘SHAUN PILCHER RPEQ 14593]
A MATHEW HILL RPEQ 11578
BRENT THOMAS RPEQ 7862
FOR & ON BEHALF OF BROWN CONSULTING (QLD) PTY LTD
‘CLIENT
QM PROPERTIES
PROJECT
LAKE DOONELLA NOOSA
STAGE C1 - C6
BROWN
Smart Consulting
Lovl 3, 16 leva Pare, Brings QLD Ausra 4575. E208
Tephone 07 5470 9260 Face 07 5470 9262 go
Radars Caters tions by fgg Cantos Lc.
coe DRAWING INDEX, LAYOUT
wi AND LOCALITY PLAN
Brown Consut 01) Pty Le
‘DRAWING NUMBER
aed
N13078-100
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.