Original source · versioned page text
Engineering Drawings Part 1 - OPW14/0197
Attached to the e-mail Doonella Stage C (Email 2 of 7) Engineering Drawings Part 2 - OPW14/0197.
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Zz NOTE: REFER TO N13078-103 FOR SURVEY SETOUT DATA. NOTE: REFER TO N13078-101 FOR KERB PROFILES. FILE: NIBO78-102.dwg DATE: 16-04-2014 TIME: 08:12 PXref's: X-NBOI8-TIT X-NB078-BASE X-NBO78-SURVEY SETOUT USR: nathan taylor REFER DRG _N13078-103 FOR CONTINUATION REFER DRG N13078-101 FOR CONTINUATION 901 TP 14.588 SHIRE DRIVE E 140 160 180 200 220 240 250 260 FRST TCALCS [DRAWN] _ DATE "MICROFILM No. ‘CLIENT a “CCM PIRNGVATION PARKWAY, BIRTINYA QM PROPERTIES \ A SURVEY SETOUT PLAN tB nM Ph (07) 5436 7888 Fax (07) 5493 6630 — wh SHEET 2 OF 3 Nic PROJECT No. [appaoveD gp 8 Zot — nati HL ota LAKE DOONELLA NOOSA Ss 5 Brow Constng (LD) Pty ans Enel i AT OAS PED ‘mart Consulting — 'i%\imontas hati cn hai iF N13078 LE COSUING RLY STAGE C1 - C6 Bee RT oan OT N13078-102
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.