Skip to the record
Accept no imitations.

Original source · versioned page text

Engineering Drawings Part 1 - OPW14/0197

Attached to the e-mail Doonella Stage C (Email 2 of 7) Engineering Drawings Part 2 - OPW14/0197.

of 20

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

 

iref's:

  
 
    

3.0m FIRE PROTECTION ZONE
PRIVATE OPEN SPACE BUFFER

FILE: NIBO78-107.dug DATE; 10-04-2014 TIME: 09:23

X-NBOTS-TIT X-N13078-BASE X-NIB078-BULK EARTHWORKS X-NEBO78-CONTOURS X-N13078-CUT-FILL USR: Joshua Beddow

158

1 IN 4 BATTER TO

NATURAL (TYP.)

REFER DRG _N13078-108 FOR CONTINUATION

Se NS
SS Place

 

901

REFER N13078-130 FOR.
BASIN EARTHWORK
LEVELS AND DETAILS.

REFER N13078-129 FOR

BASIN EARTHWORK

LEVELS AND DETAILS.

REFER N13078-128 FOR
) BASIN EARTHWORK
| | LEVELS AND DETAILS.

    

 

 

 

 

J eTow.15.57

 

 

 

 

 

 

eZ

y4
,, a
ae “

“ Tes AO
ABO Cys i
=

20°90 ay9721.30 Bea 21.80

 

 

 

 

is (2.10) ol

4

 

 

STAGE C1 *

3.0m FIRE PROTECTION zone
RIVATE OPEN SPACE BUFFER

1 IN & BATTER TO
NATURAL (TYP.)

fe TOW.19.16

Jo TOW.20.46

JoTOW.22.48

 

 

 

‘LEGEND

PROPOSED STAGE BOUNDARY
PROPOSED FINISHED SURFACE LEVEL
PROPOSED BLOCKWORK RETAINING WALL

PROPOSED CONCRETE SLEEPER WALL

EXISTING SURFACE CONTOUR
(0.5m INTERVAL)

 

 

 

 

 

 

82.0 ____ DESIGN SURFACE CONTOUR
— (0.25m INTERVAL)
AREA OF FILL
AREA OF CUT
(1.00) DENOTES WALL HEIGHTS

NOTES

1. THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL
EXISTING SERVICES WITH THE RELEVANT AUTHORITY BEFORE
COMMENCING CONSTRUCTION.

2. ALL WORKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH
CURRENT COUNCIL SPECIFICATIONS AND STANDARD DRAWINGS.

3. THE CONTRACTOR SHALL REMOVE ALL STRUCTURES, DEBRIS
AND FENCES FROM THE SITE TO THE SATISFACTION OF THE
SUPERINTENDENT.

4, NOTWITHSTANDING THE LIMITS OF CUTTING AND FILLING
SHOWN ON THE DRAWINGS, THE ACTUAL LIMITS SHALL BE
DETERMINED ON SITE BY THE SUPERINTENDENT DURING
CONSTRUCTION. SIMILARLY, THE FINISHED SURFACE LEVELS
MAY BE ADJUSTED BY THE WRITTEN DIRECTION OF THE
SUPERINTENDENT DURING CONSTRUCTION AFTER AMENDED
DRAWINGS HAVE BEEN APPROVED BY COUNCIL.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tar [once am ore —— TOES TR SN — Tan
mdr Tk eae 7 INNOVATION PARKWAY, BIRTINYA QM PROPERTIES \ CONSULT AUSTRALIA BULK EARTHWORKS
als Ph (07) 5436 7888 Fax (07) 5493 6630 ww LAYOUT PLAN
He rn oa] a P| encsccr no, Per Tancame | LAKE DOONELLA NOOSA Brown Cnt =a SHEET 1 OF 3
o > i
ie N13078 (Fee fates baa TAGE Ci Smart Consulting ‘suri tin a nails Cong [oe Ko ae
AG FOR & ON BEHALF OF BROWN CONSULTING (QLD) PTY LTD STAGE C1 - C6 ace Geter Kew ty Bien teotiwceat Te Anh N13078-107

 

 

 

 

 

 
Log in to download the original file

Engineering Drawings Part 1 - OPW14_0197.pdf · 11.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.