Delegated Report - Code - Planning MCU24 0139 (As Published) · MCU24/0139

of 25

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

               2.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
               3.     Performance Bond Agreement An applicant for a development application may make an
                      agreement with an assessment manager, referral agency or other person to establish the
                      responsibilities, or secure the performance, of a party to the agreement about a development
                      condition.
                      Building and Construction Industry (Portable Long Service Leave) Levy
               4.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
                      Co-ordination of Operational Works Assessment
               5.     Additional application fees apply to Operational Work applications where the different
                      aspects of the works are lodged separately. Significant savings in application fees will result
                      if all works are lodged in a single application.
                      Preparation of a Preliminary Construction Management Plan
               6.     A preliminary Construction Management Plan must be submitted with the Operational Works
                      application and must address the following:
                      a.      Traffic management during all phases of construction;
                      b.      Adequate parking arrangements for works and deliveries;
                      c.      appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
                              Devices (MUTCD); and
                      d.      provision for safe vehicle and pedestrian access across the frontage of the site both
                              during daily construction and after daily construction has ceased.
               16.    PROPERTY NOTES

               Not applicable.
               17.    VARIATION APPROVAL DETAILS

               Not applicable.
               18.    FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required               Subject of the required Development Permit

                Development Permit for Operational Works          Roadwork/ Frontage Works, Carparking and
                                                                  access, Stormwater, Drainage work, Earthworks,
                                                                  Landscaping, Signage

                Development Permit for Building Works             All building work.

               19.    SUBMISSIONS

               Not applicable.
               20.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.



                                                                                                      Page 24 of 25

Document Set ID: 23369912
Version: 4, Version Date: 21/07/2025

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU24 0139 (As Published).pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.