Original source · versioned page text
Attachment D_ Waste_Strategy
Conclusion
TTM considers all aspects of the waste management concept outlined above to adequately cater for the
generated refuse by each of the developments uses. Additionally, to be compliant with the requirements set
out in the Planning Scheme Policy 9 – Waste Management of the Noosa Plan.
Yours sincerely,
Neville Lee
Lead Consultant – Waste
TTM Consulting Pty Ltd
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original