Response to Further Issues Letter - 65-67 Elanda Street, Sunshine Beach
9. In relation to stormwater and lawful point of discharge, a revised analysis is
requested which examines the impacts of the development at each point of
discharge from the site. The current assessment appears to consider the site,
however in the developed case the site will discharge sheet flows to the
downstream properties and concentrated flows to Elanda St. The impacts of
each discharge location need to be considered. As no discharge currently flows
to Elanda St in the existing case, the impact to Elanda St will need to consider
the capacity of the drainage system within Elanda St and what upgrades may be
required to accommodate flows from the site.
Response
The accompanying Drainage Layout Plan prepared by WC Designs identifies the proposed
Stormwater connection. The response is further supported by a written response and Site-
Based Stormwater Management Plan.
***
We trust the above and accompanying information suitably addresses the comments of
the Council however should further clarification or information be required please contact
our office.
Yours faithfully
URBAN STRATEGIES PTY LTD
Georgina McNee
TOWN PLANNER
Response to Further Issues Letter - 65-67 Elanda Street, Sunshine Beach 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.