PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 13 OCTOBER 2015
Decision rules for Standard/Code Applications There is no clear preference for the decision
rules for standard/code applications and it is
Feedback is sought on the decision rules for considered that both options require reworking
Standard/Code Assessable Applications. to be satisfactory. Notably, option 2 as
proposed most closely aligns with the current
Option 1 SPA provisions.
‘(2) To the extent [standard/code?] assessment
is required for the development, after For standard/code assessment applications
carrying out the assessment, the assessment of development proposals should
assessment manager— be ‘bounded’ and only undertaken against
(a) must decide to approve the applicable planning requirements rather than
application to the extent the the whole of the planning scheme. It is also
development complies with the appropriate that there is a presumption for
assessment benchmarks for the code assessable development to be in favour
development; and of approval. This is consistent with the
(b) may impose development conditions drafting of The Noosa Plan, with only
on any approval; and particular codes identified as relevant for code
(c) may, to the extent the development assessable applications. Development which
does not comply with the is identified as consistent with the zoning
assessment benchmarks, decide to intent is also only code assessable. However,
refuse the application only if for any development that is not consistent with
compliance can not be achieved by the planning scheme, clear grounds should be
imposing development conditions. required to be articulated.
‘(3) Nothing stops the assessment manager
approving a development application that
does not comply with some or all of the
assessment benchmarks for the
development.
Option 2
‘(2) To the extent [standard/code?] assessment
is required for the development, after
carrying out the assessment, the
assessment manager must decide—
(a) to approve all or part of the
application; or
(b) to approve all or part of the
application, but impose development
conditions on the approval; or
(c) refuse the application.
Infrastructure The latest time proposed is simply not
workable & also may not be equitable to either
Feedback is sought on whether the following Development or Local Government depending
provision should be included. on the specific scenario that arises. Also
LGIP provision dates may be stated over a
(4) If the LGIP identifies the infrastructure, the period (i.e. 2011–2016).rather than a specific
local government must pay the refund under date so then which date should it be?? (i.e.
subsection (3)(b) no later than the 2011 or 2016??)
construction date for the infrastructure stated
in the LGIP. Possible Scenario 1:
The LGIP infrastructure proposed date is say
2016 and the construction start date &
completion by the developer is later say 2025.
Then under this proposal, the refund would
need to be given immediately before the
infrastructure is even provided. This is totally
unacceptable & unequitable for Local Gov’t.
Possible Scenario 2 (reverse of 1):
Page 19 of 110
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.