PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 13 OCTOBER 2015
Stormwater Drainage
14. Stormwater runoff from the development must be either discharged to Council’s
existing kerb and channel in Park Crescent and/or disposed of on-site without causing
scour or damage to the subject site or any adjoining property.
Geotechnical Stability
15. All works must be carried out in accordance with the recommendations contained in
the submitted Geotechnical Investigation prepared by Soil Surveys, Project No.115-
17158 dated April 2015.
16. Certification must be submitted to Council which certifies that the development has
been constructed in accordance with the recommendations contained in the submitted
Geotechnical Investigation prepared by Soil Surveys Project No.115-17158 dated April
2015 and that the development has a minimum factor of safety against landslip of 1.5
in the long term. All certification must be prepared by a Geotechnical Engineer and
must be addressed to Noosa Council. Where a member of an engineering company,
certification must be by the engineering company or an appropriate officer or employee
of the engineering company on behalf of the company
Earthworks and Retaining Walls
17. Earthworks required on site must be carried out in accordance with Council’s Planning
Scheme Policy PSP5 – Engineering Design Standards so as not to cause the
additional ponding of water on any adjoining lands or the blockage of, or interference
with, any natural watercourses.
18. The use of vibratory equipment of any kind is not permitted to be used (including
vibrating rollers and the use of vibrating installation techniques for sheet piling and
other construction vibrations caused by excavating, earthmoving or demolition
machinery or other similar construction techniques) unless approved and supervised
by a Certified Geotechnical Engineer. Under such circumstances the operator of such
equipment must at all times comply with the directions of the Geotechnical Engineer.
19. The excavation of the site and the construction of the proposed works must not have
any adverse effects on the stability of adjoining buildings and/or structures and/or
services and/or lands. In this respect, a Registered Professional Engineer Queensland
must supervise the excavation of the site and the construction of the new works to
determine whether any additional measures are required to protect the stability of
adjoining buildings and/or structures and/or services and/or lands.
Damage to Services and Assets
20. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
Advisory Notes
PLANNING
Development Compliance Inspection
21. Prior to the commencement of the use, please contact Council's DA Planning Section
to arrange a Development Compliance Inspection.
Page 24 of 110
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.