Original source · versioned page text
Planning Report (004)
proposal report
spaces provided around the Lower Mill site are subject to a separate application process and will
be constructed prior to the playground works commencing.
Attachment C provides a layout of the carparking proposed for the area.
Table 3: Summary of development aspects
Material change of use
(If your development application does not include a material change of use, please delete this section)
Building height Amenities building and shelters: 1 Storeys and 5 metres
Playground Equipment: approximately 5 metres
Gross floor area (GFA) Amenities building: approximately 21m2
Pump room: approximately: 15m2
Car parking Existing carparking – 88 spaces
Maple Street – additional 12 spaces
Lower Mill site – additional 52 spaces
Bike racks – 15
Site access Existing vehicular access from Marara Street to be
maintained. Additional maintenance/service access along
Marara Street and Maple Street proposed.
The overall concept plan for the playground locates a picnic shelter and other landscaping works
within the road reserve. At time of lodgement, the applicant is seeking advice from the State
Government as to a future road closure for the areas detailed below.
martoo consulting
town planners + urban designers + development managers page 9 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Planning Report (004).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.