Skip to the record
Accept no imitations.

Original source · versioned page text

Planning Report (004)

of 15
                                                                                                          proposal report

spaces provided around the Lower Mill site are subject to a separate application process and will
be constructed prior to the playground works commencing.

Attachment C provides a layout of the carparking proposed for the area.

Table 3: Summary of development aspects
Material                                             change                             of                           use
(If your development application does not include a material change of use, please delete this section)


Building height                                            Amenities building and shelters: 1 Storeys and 5 metres
                                                           Playground Equipment: approximately 5 metres

Gross floor area (GFA)                                     Amenities building: approximately 21m2
                                                           Pump room: approximately: 15m2

Car parking                                                Existing carparking – 88 spaces
                                                           Maple Street – additional 12 spaces
                                                           Lower Mill site – additional 52 spaces
                                                           Bike racks – 15

Site access                                                Existing vehicular access from Marara Street to be
                                                           maintained. Additional maintenance/service access along
                                                           Marara Street and Maple Street proposed.

The overall concept plan for the playground locates a picnic shelter and other landscaping works
within the road reserve. At time of lodgement, the applicant is seeking advice from the State
Government as to a future road closure for the areas detailed below.




       martoo consulting
       town planners + urban designers + development managers                                                   page 9 of 15

Log in to download the original (Planning Report (004).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.