Council archive · source document
planning report hayward · OPW26/0149
3.0 Proposed development details
The application proposes 3 x 1-bedroom cabins located ~280m away from the existing house and
operational works, with the following details:
Short Term Accommodation Cabins:
• 3 cabins with a GFA of 37m2 each located on an existing hill overlooking Mt Tinbeerwah;
• Each cabin includes separate kitchen/dinging and a bedroom/ensuite connected by a veranda;
• A separate carport adjoining the entry with material finishes of zincalume and timber, including
a pitched roof of 30 degrees with eaves;
• The cabins are accessed via a separate internal driveway from the entrance to Hayward Rd;
and
• Individual 15kL water tanks and effluent disposal system.
Operational Works
• A 300m2 dam with a maximum depth of 2m using a cut/fill balance located in the Riparian Buffer
Area; and
• Associated operational works including earthworks, driveway and stormwater disposal.
Figure 3: Proposed STA cabin location and site plans
Page 5 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
planning report hayward.pdfRelated documentApplication case desk ↗
planning report hayward.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.