Original source · versioned page text
2023-03-07 - P&E Agenda - Item 4 - Attachment 1 - Environmental Services - Threatened Fauna Recovery Road Map
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
6.5 Stakeholder input
Using the Decision Matrix, the twenty-nine shortlisted fauna species were scored against the selection criteria.
For criteria ‘Conservation Advice’ (which is critical to the delivery of the NES), a suitably qualified Noosa Council
environmental staff member completed this section of the distributed matrix, through reference to the
supporting information identified in Section 3.
For item two ‘Suitability for Longitudinal Population Trend Monitoring’, along with all other nine (9) criteria
(identified threatening processes), members of the Expert Panel were presented with the opportunity to score
and rank each of the twenty-nine shortlisted species, in turn nominating their priority species to jointly develop
the Noosa Nine species list.
6.5.1 Expert Panel
Stakeholders from an Expert Panel completed the Decision Matrix through scoring the shortlisted species against
the set criteria. The Expert Panel was formed from key stakeholders invested in Shire-wide threatened fauna
conservation. To increase the scientific robustness of the process, panel members were sourced from a variety of
stakeholder groups. The participants who completed the Decision Matrix are identified below in Table 6. In total,
ten participants (71%) out of the fourteen approached completed the Decision Matrix.
Table 6: Expert Panel members
Noosa Nine Decision Makers
Stakeholder Groups Panel Members
Mary River Catchment Committee
Non-for-profit environmental organisations Noosa & District Landcare
Noosa Biosphere Reserve Foundation
Noosa Integrated Catchment Association members
Wildwise Environmental
Wildlife consultants
Future-Plus Environmental
Ecological Australia
Internal Noosa Council staff David O’Gorman
David Burrows and Vanessa Moscato
Sunshine Coast Council Tyron de Kauwe
Acknowledgments are also extended to Professor Hugh Possingham (UQ), who provided valuable guidance during
the development of this Road Map.
Please refer to Attachment Two, Stakeholder Consultation Plan for full details.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.