Decision Letter - Change to an Existing Approval - Extend Relevant Period [As Published] · 132005.1814.02

of 16

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                              Officer:          Jack Lewis
                                              Direct Telephone: (07) 5449 5183
                                              Response Address: Locked Bag 72
                                                                Sunshine Coast Mail Centre QLD 4560
                                              Email:            [email protected]
                                              Our Reference:    2005/1814
                                              Your Reference:
12 January 2010

Beverley Scott
PO Box 7834
GOLD COAST MAIL CENTRE QLD 9726



Dear Madam

                          Change to an Existing Approval
                                   Integrated Planning Act 1997

I refer to your request to make a change to an existing approval. On 7 January 2010 Council decided
your requested changes.
Details of the decision with the consolidated conditions are as follows:

1        APPLICATION DETAILS

    Application No:               2005/1814
    Street address:               25 Hill Street, Sunshine Beach
    Real property description:    Lot 94 RP 94566
    Planning Scheme:              The Noosa Plan

2        DECISION DETAILS

Council on 14 July 2006 decided to issue the following type of approval:-
     Development Permit for a Material Change of Use – Duplex Dwelling


In relation to your request to extend the relevant period for the above development approval, Council
decided to:
A.        Extend the relevant period until 14 July 2012
B.        Approve to change condition 12
C.        Issue a Change to an Existing Approval.

3        RELEVANT PERIOD OF APPROVAL

The relevant period for this Development Approval is identified in the Assessment Manager
conditions.




                                                                                        Page 1 of 16
Full text of the other 15 pages

Page 2

                                                                                       2005/1814


4    ASSESSMENT MANAGER CONDITIONS

Land Use
1.   Development undertaken in accordance with this approval must generally comply with the
     approved plans of development. The approved plans are numbered 3087:SK:01 (Rev D);
     3087:SK:02 (Rev B); 3087:SK:03 (Rev A); 3087:SK:04 (Rev A); 3087:SK:05 (Rev A);
                                                                     st
     3087:SK:06 and 3087:SK:07, prepared by Sayan Design and dated 31 January 2006 and as
     may be amended by these conditions.
2.   The works must be undertaken in a manner that causes no detrimental effect upon the
     amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
     hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions in
     accordance with the nuisance provisions of the Environmental Protection Regulation 1998 or
     Council’s Local Law No. 12 – Control of Nuisances.
3.   The open space and setback areas are to be landscaped in accordance with Council’s Policy
     on Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably
     qualified Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to
     the premises being occupied and maintained at all times thereafter. In this regard:-
     3.1.   The existing advanced Tuckeroo to the southwest of the driveway and advanced
            Banksia to the northeast of the driveway (both near the front boundary) are to be
            retained.
     3.2.   A minimum of 20% of the subject site is to be landscaped with deep planting.
     3.3.   The existing native coastal vegetation species outside the building footprint on the side
            and rear boundaries are to be accurately detailed on a botanical survey. These species
            are to be retained where possible and incorporated into the landscape open space
            design.
     3.4.   Native coastal screening vegetation is to be implemented along the side and rear
            boundaries. The landscaping shall include understorey plantings and a diverse range of
            trees ranging from 45 to 75 Litres.
     3.5.   Significant native trees (minimum 100 Litre) are to be planted to replace any native
            trees proposed to be removed from the rear of the existing dwelling.
4.   Existing trees on the site and within road reserves are to be retained, except where required to
     be removed due to building operations or the conduct of the approved use. These landscape
     plans required to be submitted are to denote areas of existing vegetation or existing trees
     proposed or required to be retained.
5.   All fencing shall be setback at least 1 metre from the front property boundary, with at least half
     of the fencing setback 2 metres. The area of land between the fence and the front property
     boundary shall be densely landscaped to screen any fencing from the street.
6.   Mechanical plant and equipment including air-conditioning units shall be:-
     6.1.   where located at ground level, screened by fencing 1.5 metres in height or by dense
            vegetation of at least 1.5 metres in width incorporating grouped trees and shrubs; or
     6.2.   visually integrated into the line and plane of the building and roof design and do not
            project beyond the height or width of the building when viewed from the street and
            adjoining properties.
7.   Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
     thus remaining as open structures.




                                                                                     Page 2 of 16

Page 3

                                                                                   2005/1814

8.    The proposed development shall have all kitchen, laundry and bathroom fittings that comply
      with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
      Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
      Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
      System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
      Dishwashers and washing machines are excluded from this requirement.
9.    All hot water systems installed shall be either solar systems; electric heat pump systems: or
      gas systems (LPG or natural).
10.   Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for Operational Works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
11.   The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
      this approval to effect compliance with conditions.
12.   The Development Permit for a material change of use of premises lapses if the use has not
      happened by 14 July 2012, unless an application to extend the currency is approved by
      Council.
13.   The developer must obtain all of the other Development Permits referred to in the Decision
      Notice, prior to obtaining a Development Permit for Building Works.
Building Services
14.   A verification survey of the building is to be carried out by a Licensed Surveyor and a
      certificate lodged with Council at completion of the work confirming compliance with the
      maximum building height above natural surface, required by the provisions of the Planning
      Scheme.
Demolition or Relocation of Existing Dwelling
15.   Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be
      protected from damage and made safe to the standard required by the regulatory authority.
16.   All infrastructure must be disconnected, capped or sealed including:-
         electricity meters removed and electrical wires disconnected; and
         telephone lines are disconnected; and
         high speed data cables and television provider boxes are disconnected and removed to
          the standard required by the regulatory authority.
17.   All building materials containing asbestos, including asbestos cement sheeting or roofing and
      lagging, must be removed from the building and disposed of in accordance with industry best
      practice.
18.   Waste generated during construction must be stockpiled in a centralised location and covered
      as required to prevent material being blown onto adjoining properties including the road
      reserve or food waste from generating vermin. All site waste must be disposed of to an
      approved waste disposal facility either directly or via an approved waste receptacle and
      collection service. Storage areas are to be located near the temporary access to the site so
      that access can be gained with out damage to infrastructure.
19.   All building materials containing asbestos products must be disposed on in accordance with
      industry best practice.


                                                                                 Page 3 of 16

Page 4

                                                                                       2005/1814

20.   A temporary crossing must be provided to protect road reserve infrastructure including kerb
      and channel.
21.   Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site,
      the relocation site or between the sites must be repaired or reinstated to at least pre-existing
      conditions.
22.   Sediment and erosion control measures must be placed on site prior to the works
      commencing and shall be maintained until all works are complete. The erosion and sediment
      control measures shall be in accordance with the “Best practice guidelines for control of
      stormwater on building sites” prepared by Healthy Waterways (copy attached or available at
      www.healthywaterways.org).
23.   All disturbed areas must be revegetated or otherwise stabilised at the completion of the works.
      Disturbed areas are revegetated using species identified in PSP3 – Landscaping Plants and
      Guidelines
24.   The transportation of all materials to and from the site must be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying out materials either to
      or from the site shall be covered to prevent materials including dust being windblown from the
      vehicle
Land Development
Vehicle Access
25.   A vehicular access driveway shall be constructed from the Hill Street frontage of the site with a
      maximum width of 5.5m at the property boundary and 3.0m at the kerb as indicated on plan
      No. 2649-2 dated March 2006 and prepared by GG Design Drafting.
26.   The driveway shall be designed and constructed to Council’s design standards and to grades
      that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
      movements along the footpath without any level difference. Should any driveways be
      constructed to grades that do not comply with AS2890.1-2004, Council will require that the
      driveway be removed and reconstructed to levels that do comply.
      Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
      to have the footpath continue at a constant grade to minimise the potential for pedestrians to
      trip or fall.
27.   All vehicles shall enter and leave the site in a forward direction.
Carparking
Off Street
28.   Carparking shall be provided within the site as shown on drawing number 2649 -2 dated
      March 2006 by GG Design Drafting, except as modified herein.
29.   A minimum of 1 uncovered visitor carpark space and 3 covered carpark spaces shall be
      provided on site.
30.   The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for
      user class 1A with allowance for vehicles to enter and leave the site in a forward gear and with
      a minimum head clearance (headroom) at any point of 2.2m.
31.   The proposed turning area at the northern end of the driveway area that serves as turning
      area shall be provide with a sign to indicate that the area is a “Turning Area Only” and that “No
      Parking is Permitted”.
32.   The uncovered visitor space shall be setback 0.5 metres from the property boundary.
Vegetation Protection & Preservation


                                                                                     Page 4 of 16

Page 5

                                                                                        2005/1814

33.   Vehicular pavements within the drip zone of any of the existing trees on site to be retained
      shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
      allow water that falls on this surface to penetrate to the trees root system. The pavement shall
      be constructed so as not to damage the tree or their root system and in this regard temporary
      fencing shall be provided around the trees during construction to help protect them.
      Plans shall be submitted to the Council for approval that clearly show the type and extent of
      the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
      Operational Works.
Park Contributions
34.   A Park contribution of $1,284 towards the acquisition of additional parkland or the
      improvement of existing parkland and facilities in the locality shall be paid to the Council prior
      to obtaining a Development Permit for Operational Works in accordance with Council’s
      Planning Scheme Policy PSP24 Park Requirements for Development Applications. This
      amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from
      December 2005 until the date of payment.
Frontage Works
35.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the Hill
      Street frontage of the site in accordance with Planning Scheme Policy PSP3 Landscaping
      Plants and Guidelines. Grass shall be couch, free of weeds.
36.   A new 2.0m wide concrete path shall be constructed along the Hill Street frontage of the site in
      accordance with Council’s design standards and to an alignment that protects any significant
      vegetation or any underground services.
37.   A new pram ramp shall be installed at the location of existing pram ramp in Hill Street to match
      the new pathway.
38.   All paths and pram ramps shall be designed and constructed to ensure pedestrian safety
      using non-slip materials, to produce an evenly graded surface finish, and to be in accordance
      with the Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for Access
      & Mobility.
Pathway Contributions
39.   A pathway contribution of $289 towards external major pathways, in accordance with Planning
      Scheme Policy PSP41 Pathway Trunk Network Contributions, shall be paid to the Council
      prior to obtaining a Development Permit for Operational Works. This amount will be subject to
      variations in the Consumer Price Index, All Groups Brisbane from December 2005 until the
      date of payment.
Stormwater Drainage
40.   All stormwater drainage shall be collected on site and discharged so there is no net increase
      in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall
      be discharged to Council’s existing drainage structures in Hill Street. Plans of the drainage
      design shall be prepared by a Registered Professional Civil Engineer and submitted to Council
      prior to obtaining a Development Permit for Operational Works.
41.   Roof runoff from any new building shall be directed to a rainwater storage system or tank
      (minimum storage 3000 litres per unit) that is installed to ensure water from the tank can be
      used for external uses (such as watering gardens, irrigation, ornamental ponds, water
      features, topping-up swimming pools, outdoor cleaning, etc) and for use in flushing of toilets
      internal to the building. All rainwater tanks are to be designed and installed in accordance
      with the Queensland Development Code (QDC), Part 25 – Rainwater Tanks, and shall be part
      of the plumbing application in conjunction with the building approval. The location and
      capacity of the tanks shall be clearly shown on the plans submitted for Building Works
      approval and any overflow shall be directed to the stormwater drainage system in Hill Street.
                                                                                      Page 5 of 16

Page 6

                                                                                        2005/1814

42.   To ensure that polluted run-off does not enter Council’s stormwater drainage system,
      stormwater run-off from the carparking areas and the driveways shall have the first flush (the
      first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor provided on site prior to
      being permitted to discharge into Council’s drainage system.
      All other clean stormwater, such as roof water, can be collected on site and discharged
      through a single underground drain line directly into the existing drainage system, bypassing
      the grease/oil arrestor.
      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
      arrestors, which shall be submitted to the Council for approval prior to obtaining a
      Development Permit for Operational Works.
      The approved maintenance plan shall be incorporated in the Community Management
      Statement for the development and a copy of this shall be provided for Council’s records prior
      to commencement of the approved Use.
      A Development Permit for Building Works shall not be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage scheme.
43.   All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
44.   The site shall be connected to Council’s existing sewerage reticulation systems and be
      constructed in accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
45.   Each water connection to the water reticulation system shall extend to the property boundary
      and be metered. Where multiple units are served by a single service, multiple water meters to
      each individual unit shall be installed. All fees for the supply of water meters shall be paid to
      the Council.
Headworks Contributions
46.   Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
      and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
      Contributions respectively and at the rates applicable at the time of payment. An estimate
      only of the contribution rates under the current policies is outlined below. These amounts will
      adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from
      December 2005 until the date of payment.
      Water Supply        $1,926
      Sewerage            $1,598
      TOTAL               $3,524
      All headworks contributions must be paid prior to the issue of a Development Permit for
      Operational Works.
      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
      headworks contributions not be paid at the due time, Council shall call upon the trading bank
      guarantee in full.
      In the event that the Development Permit for Material Change of Use of Premises lapses or is
      cancelled, the contribution or trading bank guarantee will be returned.
Earthworks
47.   Earthworks carried out on site shall not affect the structural integrity of any of the existing
      fences or structures that border the development site. Fences that are affected shall be
      replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
      any fences to be replaced shall be clearly shown on the plans submitted for Operational
      Works approval.
                                                                                      Page 6 of 16

Page 7

                                                                                      2005/1814

Erosion and Sediment Control
48.   Any person acting on this permit shall prevent erosion and sediment export from leaving the
      site. Site control measures such as silt fencing, controlled gravel access to the site and
      controlled disposal of waste, will be necessary.
49.   Plans detailing the methods of controlling erosion and sediment are required to be submitted
      to the Council for approval prior to obtaining a Development Permit for Operational Works.
General
50.   Digital detailed design drawings and calculations shall be submitted with any application for a
      Development Permit for Operational Works in respect of roadworks and stormwater drainage
      works. To avoid conflict with underground pipes or services, all existing and proposed
      services required by the development shall be shown on the plans.
51.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council’s standards and at no cost to Council.
52.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
Environmental Health
53.   The developer must provide a suitably screened imperviously paved external area large
      enough for all refuse and recycling containers.
54.   Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or
      located in a manner which prevents a noise nuisance beyond the subject land in accordance
      with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot
      fines apply for such offences.
55.   Noise emission from air conditioning equipment shall comply with the following requirements:
      55.1. The equipment shall be installed and located in a manner which prevents noise
            nuisance beyond the subject land in accordance with the nuisance provisions of the
            Environmental Protection Regulation 1998 and Council’s Local Law No. 12 - Control of
            Nuisances. Infringement Notices (on-the-spot fines) may apply for offences.
      55.2. Submission of written certification from a suitably qualified person confirming that the
            noise levels comply when measured at the nearest residential boundary. This is
            required immediately after installation of the equipment and prior to any occupation of
            the building, and in a format approved by Council.
      55.3. A person must not use equipment on any day if it makes or causes noise to be made–
            55.3.1.    Before 7am or after 10pm: More than the lower of either –
                        40 d(B)A
                        3 d(B)A above the background noise level
            55.3.2.    From 7am to 7pm: More than the lower of either –
                        50 d(B)A
                        5 d(B)A above the background noise level
From 7pm to 10pm: More than 3 d(B)A above the background noise level




                                                                                    Page 7 of 16

Page 8

                                                                                         2005/1814


5     REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger              Referral Status   Referral Agency         Referral Address

 Contaminated Land             Concurrence       Environmental           GPO Box 2771
                               Agency            Protection Agency       BRISBANE QLD 4001

A copy of any referral agency conditions is attached.
6     APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.       Rev.     Plan / Document Name                       Date
 3087:SK:01                D        Prepared by Sayan Design                   31 January 2006
 3087:SK:02                B        Prepared by Sayan Design                   31 January 2006
 3087:SK:03                A        Prepared by Sayan Design                   31 January 2006
 3087:SK:04                A        Prepared by Sayan Design                   31 January 2006
 3087:SK:05                A        Prepared by Sayan Design                   31 January 2006
 3087:SK:06                –        Prepared by Sayan Design                   31 January 2006
 3087:SK:07                –        Prepared by Sayan Design                   31 January 2006

7     ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES
Not applicable

9     PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable



                                                                                      Page 8 of 16

Page 9

                                                                                    2005/1814


10     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required         Subject of the required Development Permit
 Development Permit for Building Works       All building works

 Development Permit for Operational          Landscaping, car parking and access, frontage
 Works                                       works, stormwater drainage and sediment and
                                             erosion controls

11     SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Not applicable

12     SUBMISSIONS
Not applicable

13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable

14     RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.

15     OTHER DETAILS

Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.


Decision Notice History
14 July 2006 -                 Original Decision Notice.
7 January 2010 -               Extend the relevant period
                               until 14 July 2012 & change
                               condition 12.


Yours faithfully,




Denis Wallace
Senior Development Planner




                                                                                  Page 9 of 16

Page 10

                                        2005/1814


Referral Agency Conditions
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                     Page 10 of 16

Page 11

   2005/1814




Page 11 of 16


[OCR of page images]
2005/1814

 

Postal address: PO Bux 2771, BRISKRANE OLD 4(4)1

Telephoue: 3224 5444 Fax: 32473278  E mail; [email protected] gov.au
Ela no.: AMA 3538

Applivution mut 2005/1814

Property Description: Lotno.:94 Registered Plan no.: RP94566

Properly Loealian: 25 Hill Street, SUNSHINE BEACH

Signed

   

Mark Paton
Chief Scientific Advisor

Ce:

Ms Beverley Scott

CH Martao Consulting Pry Ltd
PO Box 1684

NOOSA 1TRADS QLD 4567

IDAS covering letcex (concurrence agency}

Page 2af2

Page 11 of 16

Page 12

   2005/1814




Page 12 of 16


[OCR of page images]
2005/1814

 

IDAS C-6

Concurrence agency response
Integrates! Plauning Act 1997 ss3.3.16 and 3.3.18

Applicant: Heverley Scott
Cé- Mariage Camsulting Pry [td
PO Box 1684
: NOOSA HEADS QED 4567

Applicativu n0.; 20H15/1814

Date received by EPA: 25 October 2605

Jurisdiction: Environmental Protection Act 1998 *

Role: Coneurtence

Description: Material Change of Use

25 Bill Strest, SUNSHINE KESCH
Lot no.: 94 Registered Plan no.: RP94566 -

1 Type of development

Material change of use

a Reconfiguration of a Lot

where: . .

oO the existing use of the land ta, or if the land is vacant land with nu cxisling use Lhe mus
recent use of the land was, for a notifiable activity under the Environmental Protection Act
F994.

Oo the praposed use of the land is for child care, educational, recreational, residential or .
similar purpuses anv lhe existing use of the land is, or if the land is vacant land with no
existing use Ue inest recent use oF the Jand was, for an industrial activity.

(he land is on Ihe Bavironmental Management Register or Contaminated Land Register ©
under the Exviromnental Protection Act 1994.

the land is wholly or partly willun ati area for which an Area Management Advice lor
industrial activity or natural mineralisation has been issued and the proposed use of the
land is for child care, educational, recreational, residential or sitailar purposes.

a the land is wholly or partly in an ates for which an Area Management Advice for
unexploded ordnance {UXO} has beer essuedd

2 Response ta deyclopment application

The Environmental Protection Agency (EIA), acting 4s a concurrence agency under the fategrated
Planning Act /997, provides the [allowing response to the application detailed above -

oooug

3

conditions must attach to any approval of the development
any approval must be lir-part onty af the development
any approval must be a preliminary approval only

There are ie voncurtence ageney maquirenisnty

the application must be rctused

Reasons for including condition(s} ar refusal

The site (hue subject Job‘s) is pam of an arca of laud within which the Deparlnent al Deleuce
(Delence) has assessed a ‘substantial’ risk of residual UXO contamination exisls.

Detence wlvises thal development or land use rezoning proposals for land within a “subslantial’ zone
should only proceed following the conduct of UXO investigation and clearance activitics. Defence

VERS

Page 12 of 16

Page 13

   2005/1814




Page 13 of 16


[OCR of page images]
2005/1814

 

IDASC-6 *
maintains a list of commercial XO investigation and remedial search cuntractors thal il accredits to
carry oul this work.

~- Defence also recommends that owners or occupicrs of patenlially affected land and workers and
contractors employed on the land need to be aware of lhe procedure if a eee object i is found.
As the EPA. haz.ng recerd af the site being futher investigated or remedied, iti is considered that ,
there remains a possibility of UXO being found on it. -

4 Conditions . '
The following concwrence agency conditions arc to be attached to any approval:

41 Prior to the commencement of any development related excavation, earthworks or spi]
distudance, that part of the site ta be so worked is to be subjected to investigatin aud,
where ocecssary, appropnate rcrncdial action.

a woe ee the 7 ia

Az roy person cmployed ty work on any part of “Uke site where Condition Al has not beun
satisfied is to be forewamed in writing by the applicant.

This warning is to explain that information available to the EPA indicates a potential for
residual UXO exists on the site and work should proceed with due canton. . It is ty state We
procedure to be followed by any person finding an object suspected oF being explosive
cee oF component thereat

.Bo nat disturb.the abjecl. 2. : 5S oo Soe

Tukc.avtion, where apprupriaty, lu prevent. it being disturbed) by aoulher porson.-. sowed
* Note its approximate Uisyensions aul general appearance.

Nols the rele to its location. .

Advise the Police as soon as possible,

 

cress

43 — Fallowing inycatigation and any remedial action taken to satisfy Condition 4.1 above, the
applicant is to submit a report, prepared in accordance with current guidelines, to the EPA for
asaessment ‘The EPA is to subsequently advise the Noosa Council and the appticant of its
assessment in rcyard to Condilion 4.1 being salisfied.

 

4.4 No gravel, rock, sand or soil is to be removed from the site without written EPA approval,
4.5. The applicant is to advise. the owner and any occupicr of the site of the above responsibilitics. .

s Additional comments or advice

Applicants may contact the EPA's Contaminated Land Unit on (07) 3224 3644 or visie the Defence
website btp.vaww, defence. wov.au‘uxe for the details of current UXO investigation and remedial
search contractors. The KPA accepes reports based on investigative and remedial work carried out
by lhes¢ contractors.

Investigalion and remedial action to satis!y Condition 4.1 typically iavelves sampling/search
programs with delection equipment unless the use of such equipment is:
« considered unwarranted by a UXO contracoor due to the extent of any prior cxcavalion or
varlhworks oz, cunversely, oCany GIEng proposed as parl of the develapment program, or
® prevented or made impracticable by the presence of a structure, stockpile, natura] barrier or
metal waste.

‘ VEILE

Page 13 of 16

Page 14

   2005/1814




Page 14 of 16


[OCR of page images]
2005/1814

 

IDAS C-6

In the latter case, alternative action may be appropriate to minimise the risk in the first instance. For
example, where the risk of exposure lv any UXO that may exist is reduced by the prescnec of a
structure or natural barricr, issuance ol the standard LX) warning (see Candition 4.2) may suffice
while the structure, stockpile or bare? remaias in place. Where a structurc is‘to’be removed or “
reduced as part ofthe development program, protective precautions, commensurate with any greater
cisk to Which workers Might then be exposed, ‘may need io be considered. Progressive assessment’
will be necessary where such circumstances exist. Linless; ar the completion of} preliminary works,"
there is evidence then available to the UXO contraclor that any residual risk is negligible, the use of
Ueteclion equipragat will typically be required to confinm the site’s status.

Where investigation, along with any subsequent remedial action and assessment. is to be
implemented by stages to saristy Condition 4.1 and 4.3, a preliminary investigation report should be
subsnitted by [he applicant co the EPA along with a management plan for the proposed work. Stazod
investigation’‘remediation is most likely to be applicable where development of smaller, built-on lots

. (which can present circumstances such as chose discussed ahovc) or hroadhectare sitcs is proposed. in
such cases, the EPA’s assessment of the report and advice: to Council in regard lo approval of the
development will be dependent on agreement with the management plan.

Where Condition 4.1 is to be satisfied by a whole lot or broadhectace develooment stage being
subjccted to investigation and any necessary remudial sction, the EPA, bused on the subsequent...
investi gation/remediation ecport’s findings und Tecommendation’s, may reassess the lot, or [hat portion
comprising the devclopmint staye, as being remedialud or nul neeling memediaben, and advese the
applicant and Council accordingly, Otherwise, any balance of land that has nut been further
investigated wil] retain the risk assessment made bv Defence. This is unless evidence obtained [rom
the investigated part's can-he used to réfute Defence's assessment in regard to all or part of lhe +;
balance. Is the latter case, the EPA may reasgess all of the balauce-or.the applicable partis as being
unallected by UX0. Lovet

6 Additional information

This voucurrence response applies only te coataminated land issues and docs not remove the noed to,
obtain any further approval for this development which may be required by this or other legislation,
Sate and/or Commonweallh, Applicants are advised to check with all relevant statutory autharitics.
Applicants should also comply with all relevant legislation.

The EPA has not provided a notification to native tithe parties for this application. The State's
Native Title Work Procedures indicate that the responsibitity for assessment of native title-issues for
an LDAS application rests with the Assessment Manager. It is cecommended thal the Assossmenl
Manager determines whether native title notitication is required for this application.

“End of response?

IDAS C-6 CLM

  

VERZ

Page 14 of 16

Page 15

                                                                                                        2005/1814


                                                        Appeal Rights
                                                        INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated                         (6) If an application involves assessment against a
Planning Act (Chapter 4).                                           concurrence agency code, appeal rights for submitters
                                                                    for the application are not available against the part of
Division 8 - Appeals to                court   relating   to        the approval that represents the concurrence agency’s
development applications                                            response for the code.
Appeals by applicants                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application               4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following-               jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development           development approval for a development application if-
      application;                                                  (a) the development      application    involves   impact
(b) a matter stated in a development approval, including               assessment; and
      any condition applying to the development, and the            (b) the advice agency told the applicant and the
      identification of a code under section 3.1.6;1                   assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a                 application as a submission for an appeal.
      development permit was applied for;                              (2) The appeal must be started within 20 business
(d) the length of a relevant period;                                days after the day the decision notice or negotiated
                                                                    decision notice is given to the advice agency as a
(e) a deemed refusal.                                               submitter.
    (2) An appeal under subsection (1)(a) to (d) must be            Appeals for matters arising after approval given
started within 20 business days (the “applicant’s appeal
                                                                    (co-respondents)
period”) after the day the decision notice or negotiated
decision notice is given to the applicant.                          4.1.30.(1) For a development approval given for a
                                                                    development application, a person to whom any of the
    (3) An appeal under subsection (1)(e) may be started
                                                                    following notices have been given may appeal to the
at any time after the last day a decision on the matter
                                                                    court against the decision in the notice-
should have been made.
                                                                    (a) a notice giving a decision on a request for extension
Appeals by submitters
                                                                       of the relevanrt period for an approval;
4.1.28.(1) A submitter for a development application may
                                                                    (b) a notice giving a decision on a request to make a
appeal to the court about-
                                                                       minor change to an approval.
(a) the giving of a development approval, including any
                                                                        (2) The appeal must be started within 20 business
      conditions (or lack of conditions) or other provisions
                                                                    days after the day the notice of the decision is given to
      of the approval; or
                                                                    the person.
(b) the length of a relevant period for the approval.
                                                                        (3) Subsection (1)(a) does not apply if the approval
    (2) The appeal must be started within 20 business               resulted from a development application (superseded
days (the “submitters appeal period”) after the day the             planning scheme) that was assessed as if it were an
decision notice or negotiated decision notice is given to           application under a superseded planning scheme.
the submitter.
                                                                       (4) Also, a person who has made a request
    (3) If a person withdraws a submission before the               mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the               against a deemed refusal of the request.
decision.
                                                                       (5) An appeal under subsection (4) may be started at
   (4) If an application involves both impact assessment            any time after the last day the decision on the matter
and code assessment, appeal rights for submitters are               should have been made.
available only for the part of the application involving
impact assessment.                                                  Division 9 - Appeals to court about other matters
    (5) If an application is processed under section                Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application         (no co-respondents)
are available only for the aspects of the development that          4.1.31.(1) A person to whom any of the following notices
would have required public notification under the                   have been given may appeal to the court against the
repealed Act.                                                       decision in the notice-
                                                                    (a) a notice giving a decision on a request to change or
                                                                       cancel a condition of a development approval.
1
    Section 3.1.6 (Preliminary approval may override local
    planning instrument)
                                                                                                    Page 15 of 16

Page 16

                                                                                                2005/1814

(b) a notice under section 6.1.442 giving a decision to      (c) the decision to give a preliminary approval when a
    change or cancel a condition of a development                  development permit was applied for;
    approval.                                                (d) the length of a period mentioned in section 3.5.21
    (2) The appeal must be started within 20 business              relevant period;
       days after the day the notice of the decision is      (e) a deemed refusal.
       given to the person.
                                                                 (2) An appeal under subsection (1)(a) to (d) must be
    (3) Also, a person who has made a request                started within 20 business days (the “applicant’s appeal
       mentioned in subsection (1)(a) may appeal to the      period”) after the day the decision notice or negotiated
       court against a deemed refusal of the request.        decision notice is given to the applicant.
    (4) An appeal under subsection (3) may be started at         (3) An appeal under subsection (1)(e) may be started
       any time after the last day the decision on the       at any time after the last day a decision on the matter
       matter should have been made.                         should have been made.
Appeals against decisions to change approval conditions      The Registrar for the Building and Development
under the repealed Act                                       Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision     http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or        For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court      4.1.36 Appeals about particular infrastructure
against-                                                     charges
(a) the decision; or                                         (1) This section applies to a person who has been
(b) a deemed refusal of the application.                     given, and is dissatisfied with, an infrastructure charges
                                                             notice or a regulated State infrastructure charges notice.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of      (2) The person may appeal to the court against the
the decision is to be given to the person.                   notice.
    (3) An appeal under subsection (1)(b) may be started     (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter      after-
should have been made.                                       (a) if the notice is given because of a development
Appeals against local laws                                        approval or master plan approval-the day the
                                                                  applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a
                                                                  approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the           (b)    otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the   (4)    An appeal under this section may only be about-
planning scheme may appeal to the court against the
                                                             (a) whether a charge in the notice is so unreasonable
decision or the conditions applied.                              that no reasonable relevant local government, State
    (2) The appeal must be started within 20 business            infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the        have imposed it; or
applicant.
                                                             (b) an error in the calculation of the charge.
For Building Works Only                                      (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the           under this section can not be about the methodology
Integrated Planning Act 1997 as follows:                     used to establish the charge in the relevant infrastructure
Division 3 – Appeals to tribunals relating to                charges schedule or regulated State infrastructure
development applications                                     charges schedule.
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
    application;
(b) a matter stated in a development approval, including
    any condition applying to the development, and the
    identification of a code under section 3.1.6;3


2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
  Section 3.1.6 (Preliminary approval may override local
  planning instrument)
                                                                                             Page 16 of 16

Used in these records

About this file

File size
135 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Letter - Change to an Existing Approval - Extend Relevant Period [As Published].pdf · 135 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.