Decision Letter - Change to an Existing Approval - Extend Relevant Period [As Published] · 132005.1814.02
2005/1814
8. The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
Dishwashers and washing machines are excluded from this requirement.
9. All hot water systems installed shall be either solar systems; electric heat pump systems: or
gas systems (LPG or natural).
10. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for Operational Works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
11. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
12. The Development Permit for a material change of use of premises lapses if the use has not
happened by 14 July 2012, unless an application to extend the currency is approved by
Council.
13. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
Building Services
14. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum building height above natural surface, required by the provisions of the Planning
Scheme.
Demolition or Relocation of Existing Dwelling
15. Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be
protected from damage and made safe to the standard required by the regulatory authority.
16. All infrastructure must be disconnected, capped or sealed including:-
electricity meters removed and electrical wires disconnected; and
telephone lines are disconnected; and
high speed data cables and television provider boxes are disconnected and removed to
the standard required by the regulatory authority.
17. All building materials containing asbestos, including asbestos cement sheeting or roofing and
lagging, must be removed from the building and disposed of in accordance with industry best
practice.
18. Waste generated during construction must be stockpiled in a centralised location and covered
as required to prevent material being blown onto adjoining properties including the road
reserve or food waste from generating vermin. All site waste must be disposed of to an
approved waste disposal facility either directly or via an approved waste receptacle and
collection service. Storage areas are to be located near the temporary access to the site so
that access can be gained with out damage to infrastructure.
19. All building materials containing asbestos products must be disposed on in accordance with
industry best practice.
Page 3 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - Extend Relevant Period [As Published]Related documentApplication case desk ↗
About this file
- File size
- 135 KB (small file)
- File type
No other editions are linked here.