33.   Vehicular pavements within the drip zone of any of the existing trees on site to be retained
      shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
      allow water that falls on this surface to penetrate to the trees root system. The pavement shall
      be constructed so as not to damage the tree or their root system and in this regard temporary
      fencing shall be provided around the trees during construction to help protect them.
      Plans shall be submitted to the Council for approval that clearly show the type and extent of
      the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
      Operational Works.
Park Contributions
34.   A Park contribution of $1,284 towards the acquisition of additional parkland or the
      improvement of existing parkland and facilities in the locality shall be paid to the Council prior
      to obtaining a Development Permit for Operational Works in accordance with Council’s
      Planning Scheme Policy PSP24 Park Requirements for Development Applications. This
      amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from
      December 2005 until the date of payment.
Frontage Works
35.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the Hill
      Street frontage of the site in accordance with Planning Scheme Policy PSP3 Landscaping
      Plants and Guidelines. Grass shall be couch, free of weeds.
36.   A new 2.0m wide concrete path shall be constructed along the Hill Street frontage of the site in
      accordance with Council’s design standards and to an alignment that protects any significant
      vegetation or any underground services.
37.   A new pram ramp shall be installed at the location of existing pram ramp in Hill Street to match
      the new pathway.
38.   All paths and pram ramps shall be designed and constructed to ensure pedestrian safety
      using non-slip materials, to produce an evenly graded surface finish, and to be in accordance
      with the Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for Access
      & Mobility.
Pathway Contributions
39.   A pathway contribution of $289 towards external major pathways, in accordance with Planning
      Scheme Policy PSP41 Pathway Trunk Network Contributions, shall be paid to the Council
      prior to obtaining a Development Permit for Operational Works. This amount will be subject to
      variations in the Consumer Price Index, All Groups Brisbane from December 2005 until the
      date of payment.
Stormwater Drainage
40.   All stormwater drainage shall be collected on site and discharged so there is no net increase
      in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall
      be discharged to Council’s existing drainage structures in Hill Street. Plans of the drainage
      design shall be prepared by a Registered Professional Civil Engineer and submitted to Council
      prior to obtaining a Development Permit for Operational Works.
41.   Roof runoff from any new building shall be directed to a rainwater storage system or tank
      (minimum storage 3000 litres per unit) that is installed to ensure water from the tank can be
      used for external uses (such as watering gardens, irrigation, ornamental ponds, water
      features, topping-up swimming pools, outdoor cleaning, etc) and for use in flushing of toilets
      internal to the building. All rainwater tanks are to be designed and installed in accordance
      with the Queensland Development Code (QDC), Part 25 – Rainwater Tanks, and shall be part
      of the plumbing application in conjunction with the building approval. The location and
      capacity of the tanks shall be clearly shown on the plans submitted for Building Works
      approval and any overflow shall be directed to the stormwater drainage system in Hill Street.
                                                                                      Page 5 of 16

Used in these records

About this file

File size
135 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Letter - Change to an Existing Approval - Extend Relevant Period [As Published].pdf · 135 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.