Erosion and Sediment Control
48. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
49. Plans detailing the methods of controlling erosion and sediment are required to be submitted
to the Council for approval prior to obtaining a Development Permit for Operational Works.
General
50. Digital detailed design drawings and calculations shall be submitted with any application for a
Development Permit for Operational Works in respect of roadworks and stormwater drainage
works. To avoid conflict with underground pipes or services, all existing and proposed
services required by the development shall be shown on the plans.
51. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
52. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Environmental Health
53. The developer must provide a suitably screened imperviously paved external area large
enough for all refuse and recycling containers.
54. Swimming pool or spa pumps are to be contained in an acoustically treated enclosure or
located in a manner which prevents a noise nuisance beyond the subject land in accordance
with the nuisance provisions of the Environmental Protection Regulation 1998. On the spot
fines apply for such offences.
55. Noise emission from air conditioning equipment shall comply with the following requirements:
55.1. The equipment shall be installed and located in a manner which prevents noise
nuisance beyond the subject land in accordance with the nuisance provisions of the
Environmental Protection Regulation 1998 and Council’s Local Law No. 12 - Control of
Nuisances. Infringement Notices (on-the-spot fines) may apply for offences.
55.2. Submission of written certification from a suitably qualified person confirming that the
noise levels comply when measured at the nearest residential boundary. This is
required immediately after installation of the equipment and prior to any occupation of
the building, and in a format approved by Council.
55.3. A person must not use equipment on any day if it makes or causes noise to be made–
55.3.1. Before 7am or after 10pm: More than the lower of either –
40 d(B)A
3 d(B)A above the background noise level
55.3.2. From 7am to 7pm: More than the lower of either –
50 d(B)A
5 d(B)A above the background noise level
From 7pm to 10pm: More than 3 d(B)A above the background noise level
Page 7 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - Extend Relevant Period [As Published]Related documentApplication case desk ↗
About this file
- File size
- 135 KB (small file)
- File type
No other editions are linked here.