Minor Change Existing Approval DBW22 0186 01 (As Published) · DBW22/0186.01

of 7

Text shows just the words. Original shows the document exactly as it was published.

                                                                              Officer:            Georgina Schramm
                                                                              Direct Telephone:   07 53296569
                                                                              Our Reference:      DBW22/0186.01
                                                                              Your Reference:     n/a

               01 December 2025


               NV Haber & JJ Haber
               C/- Brennan Planning Pty Ltd
               44 Maple St
               COOROY QLD 4563

               [email protected]



               Dear Sir/Madam,
                                              Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 31 October 2025, requesting a minor change to an existing
               development approval. Council decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              DBW22/0186.01

                   Street address:              35 Cooran Ct Noosa Heads Qld 4567

                   Real property description:   Lot 209 N 21857

                   Planning Scheme:             Noosa Plan 2020 (26 September 2025)

               2.      DECISION DETAILS

               The following type of approval was issued on 12 April 2023.
               •          Development Permit for Building Work Assessable Against the Planning Scheme -
                          Dwelling House.
               In relation to the request to make a minor change to the existing approval, Council on 26 November
               2025, decided to approve the requested changes. The changes are detailed below.
               A.      Approve the change.
               B.      Delete Condition 15.
               C.      Amend Conditions 3, 18, 23, 24 and Section 10.
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.




               ABN 97.969.214.121                                                              PO Box 141
               noosa.qld.gov.au                                                         Tewantin QLD 4565
               [email protected]                                                         07 5329 6500
                                                                                                        Page 1 of 7
Document Set ID: 24342237
Version: 3, Version Date: 01/12/2025
Log in to download the original file

Minor Change Existing Approval DBW22 0186 01 (As Published).pdf · 164 KB (small file)

Full text of the other 6 pages

Page 2

               4.     ASSESSMENT MANAGER CONDITIONS

               PLANNING
                      When Conditions must be Complied With
               1.     Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                      the use of the building commencing, and then compliance maintained at all times while the
                      use continues.
                      Currency Period
               2.     This development approval lapses if the works have not substantially started by 12 April
                      2025, unless an application to extend the currency period is approved by Council.
                      Approved Plans
               3.     Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans listed in the tables below.

                         Plan No.           Rev.    Plan/Document Name                             Date

                         000                Q       Cover Sheet      prepared    by   Lightbody 23/02/2023
                                                    Architects

                         0110               O       Site Plan Proposed prepared by Lightbody 23/02/2023
                                                    Architects

                         1001               X       Level 1 – Floor Plan prepared by Lightbody 23/03/2023
                                                    Architects

                         1002               N       Basement – Floor Plan prepared by 23/02/2023
                                                    Lightbody Architects

                         1003               V       Roof Plan prepared by Lightbody Architects 23/02/2023

                         2000               V       Building Elevations prepared by Lightbody 23/02/2023
                                                    Architects

                         2001               K       Building Elevations prepared by Lightbody 23/02/2023
                                                    Architects

                         2002               V       Building Elevations prepared by Lightbody 23/02/2023
                                                    Architects

                         2003               I       Building Elevations prepared by Lightbody 23/02/2023
                                                    Architects

                         2101               T       Building Sections prepared by Lightbody 23/02/2023
                                                    Architects

                         2102               S       Building Sections prepared by Lightbody 23/02/2023
                                                    Architects

                         1000               X       Ground Floor – Floor Plan prepared by 23/02/2023
                                                    Lightbody Architects
                                                    (Annotated by Council)

                         2103               T       Building Sections prepared by Lightbody 23/02/2023
                                                    Architects
                                                    (Annotated by Council)


                                                                                                       Page 2 of 7
Document Set ID: 24342237
Version: 3, Version Date: 01/12/2025

Page 3

                      Building Height
               4.     The maximum height of the development must not exceed 8 metres above the ground level,
                      including where excavation is undertaken the exposed portion of the external façade of the
                      building.
               5.     The ground level must be reinstated around the basement level to ensure no part of which is
                      more than 1 metre above ground level, apart from the driveway entrance.
               6.     Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
                      certifies that the building does not exceed the maximum height requirement of this Decision
                      Notice.
                      Performance Bond
               7.     Security in the form of a cash bond or trading bank guarantee to the sum of $5000 must be
                      submitted to Council, to secure performance of all conditions of this approval, prior to the
                      issue of a Development Permit for Building Works. The cash bond or trading bank guarantee
                      will be returned on performance of the conditions of approval less any costs incurred by
                      Council in respect of enforcing performance of this permit. Council reserves the right to call
                      upon the bond or guaranteed sum to effect compliance with conditions.
                      Streetscape
               8.     Any shipping containers, railway carriages or similar must be placed behind the dwelling
                      house and not visible from the street.
                      Lighting Amenity
               9.     No flood lighting must be used on site. Any vertical illumination resulting from direct, reflected
                      or other incidental external lighting emanating from the site must not exceed 8 lux when
                      measured at any point 1.5 metres outside the boundary and at any level from ground level
                      upward.
                      Environment
               10.    Sediment or any other material including building materials or waste products must not be
                      deposited or released into the road reserve, stormwater drain or adjacent properties.
                      Landscaping Works
               11.    A minimum of 20% of the site must be retained as soft landscaping.
               12.    Existing native trees on the site must be retained, except where required to be removed to
                      accommodate the approved dwelling.
               13.    The development site must be landscaped. The works must be undertaken in accordance
                      with the Noosa Plan for that specific area and must include:
                      a.      provision of 1 street tree with a minimum pot size of 45 litres within the road reserve
                              for every 8 metres of road frontage.
               14.    All planting areas on the eaves must be planted and maintained at all times, with replacement
                      planting undertaken promptly where plants fail or do not have a healthy and vigorous growth.
                      Prior to the Commencement of Works
               15.    Deleted.
                      Site Access and Driveways
               16.    A sealed access driveway must be provided from Cooran Court to all parking and
                      manoeuvring areas of the development. The works must be undertaken generally in
                      accordance with Lightbody Architect’s Site Plan Proposed (revision o) dated 23 February
                      2023 and Council’s standard drawings RS-049 and RS-050.




                                                                                                          Page 3 of 7
Document Set ID: 24342237
Version: 3, Version Date: 01/12/2025

Page 4

                      Car Parking
               17.    A minimum of 2 covered car parking spaces must be provided and marked on the site. The
                      works must be undertaken in accordance with Lightbody Architect’s Ground Floor – Floor
                      Plan (revision x) dated 23 February 2023 and must include in particular dimensions,
                      crossfalls and gradients in accordance with Australian Standard AS2890: Parking Facilities.
                      Stormwater Drainage
               18.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be generally in accordance with H Design’s Basement & Ground
                      Floor Plans Drainage (Sheet 1 of 4, Revision C) dated September 2022 and associated
                      addendum.
                      Easements
               19.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               20.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               21.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Geotechnical Stability
               22.    All works must be carried out in accordance with the recommendations contained in Douglas
                      Partners’ Investigation Summary Report (210359.00) dated 19 September 2022.
                      Earthworks and Retaining Walls
               23.    All fill and associated batters must be contained entirely within the subject site unless written
                      permission from the respective landowner(s) is provided to Council
               24.    Building Work must be undertaken in accordance with the dewatering management plan
                      based on the document titled ‘Dewatering Management Plan’ (prepared by ADG Consulting,
                      dated February 2023) and the following:
                      •    Undertake additional calculations or groundwater modelling as necessary to provide both
                           sectional and plan views showing the extent of the cone of depression associated with
                           the proposed dewatering and that potential acid sulfate soil material which will remain in-
                           situ post-construction will not become oxidised by the dewatering;
                      •    Identify all property and infrastructure (public and private) located within the cone of
                           depression and provide dilapidation reports for this property and infrastructure;
                      •    Nominate proposed location(s) for groundwater monitoring bores, required to check for
                           dewatering outside of the estimated cone of depression;
                      •    Providing sizing for the proposed treatment system for managing the quality of extracted
                           groundwater and provide a plan showing how the primary, secondary and tertiary
                           treatment tanks can all be accommodated inside the property boundary; and
                      •    The requirements of Section 6.5.2 (Water Quality Monitoring) are to be increased to
                           include continuous monitoring of pH and dissolved oxygen at the release point from the
                           treatment system. Total iron and aluminum are to be sampled where identified in the
                           document as ‘if required’.
               25.    All excavation and dewatering works below the elevation of 5m AHD must be undertaken in
                      accordance a Dewatering Management Plan that is prepared by a suitably qualified person,
                      certified by the sites qualified person experienced with Acid Sulfate Soils Management and
                      endorsed by Council prior to the commencement of the works. All excavation and dewatering
                      works must be undertaken in a manner that will not cause environmental harm or damage to



                                                                                                         Page 4 of 7
Document Set ID: 24342237
Version: 3, Version Date: 01/12/2025

Page 5

                      surrounding infrastructure or property as a result of the developments interaction with actual
                      or potential Acid Sulphate Soils or groundwater.
               26.    All excavated material must be treated for acid sulfate soils generally in accordance with the
                      recommendations provided by Douglas Partners Investigation Summary Report dated 19
                      September 2022. Treated material must undergo verification testing at the rate of one sample
                      per 250 m3 throughout the duration of the excavation phase of the development. The
                      verification testing must be undertaken by a qualified person in accordance with the
                      Queensland Acid Sulfate Soil Technical Manual: Soil Management Guidelines v4.0, and the
                      results must be submitted to Council for appraisal when requested during construction and
                      prior to commencement of use and must demonstrate that the material has been adequately
                      neutralised. Certification of the verification results for compliance with this condition must be
                      provided by a suitably qualified Geotechnical Engineer prior to the issuing of the certificate
                      of classification for the dwelling.
                      Damage to Services and Assets
               27.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               5.     REFERENCE DOCUMENTS

                Plan No.               Rev.   Plan/Document Name                                  Date

                Sheet 1 of 4                  H Design Pty Ltd Basement and & ground Floor September 2022
                                              Plans Drainage

                R.001.docx                    Douglas Partners Investigation Summary Report       19   September
                                                                                                  2022

                ADG1490.23               0    ADG Dewatering Management Plan                      February 2023

               6.     REFERRAL AGENCIES

               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Development Compliance Inspection
               1.     Prior to the commencement of the use, please contact Council's Development Assessment
                      Branch to arrange a Development Compliance Inspection.
                      Sustainability
               2.     Council encourages sustainable and energy efficient building design for all development,
                      including the use of sustainable building materials, energy efficient fittings, solar hot water,
                      photovoltaic systems (including the use of inverter/charges), solar panels, water saving
                      devices and rainwater harvesting.
                      Fires in Urban Areas




                                                                                                         Page 5 of 7
Document Set ID: 24342237
Version: 3, Version Date: 01/12/2025

Page 6

               3.        In urban areas fires are prohibited except where in an appliance is used for domestic heating
                         or cooking purposes, which must comply with particular standards. Any area identified as a
                         fire pit area on approved plans is to be in accordance with Local Law & Subordinate Local
                         Law No. 3, Schedule 3. Refer to the following link for details:
                         https://www.noosa.qld.gov.au/community/local-laws/local-laws-overview
                         Building and Construction Industry (Portable Long Service Leave) Levy
               4.        The QLeave levy must be paid prior to the issue of a development permit where it is required.
                         Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                         been paid.
                         Infrastructure Charges
               5.        All developments and/or changes to existing developments may require payment of
                         “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                         made pursuant to the planning legislation and regulations current at the time of issue. For
                         further information, please refer to https://www.noosa.qld.gov.au/planning-
                         development/development-tools-guidelines/infrastructure-charges
               8.        PROPERTY NOTES

               Not applicable.
               9.        VARIATION APPROVAL DETAILS

               Not applicable.
               10.       FURTHER DEVELOPMENT PERMITS REQUIRED

                   Type of Development Permit Required                          Subject of the required Development Permit

                   Development Permit for Building Works                        All building work

               11.       SUBMISSIONS

               Not applicable.
               12.       RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               13.       OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.


               Yours faithfully,

               Georgina Schramm
               Senior Development Planner | Development Assessment
               Development & Regulation



               Enc:      Appeal Rights
                         Approved Plans/Documents
                         Statement of Reasons – Notice about decision

               DECISION NOTICE HISTORY
               •     Original Decision Notice – 12 April 2023.

               •     Decision Notice - Minor – DBW22/0186.01 - with an amendment to conditions 3, 18, 23, 24 & section 10 and delete condition 15.



                                                                                                                                 Page 6 of 7
Document Set ID: 24342237
Version: 3, Version Date: 01/12/2025

Page 7

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                    Page 7 of 7
Document Set ID: 24342237
Version: 3, Version Date: 01/12/2025

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.