2016008949 DECISION NOTICE - Signed
Attached to the e-mail Operational Works Application OPW16/0338.
C004 Sewer Reticulation Long VT Consulting
14/11/16
Rev C Section Engineers
C005 Sewer Reticulation Build VT Consulting
14/11/16
Rev B Over Sewer Sections Engineers
1620/HWD/ Hydraulic Services Basement
H05 Floor Plan (1 of 2) / Water & BRW Enterprises 20/10/16
Rev DD1 Fire Services
This condition is imposed under section 99BRDJ – conditions about non-
trunk infrastructure of the South-East Queensland Water (Distribution and
Retail Restructuring) Act 2009.
NWA
Pre-start Meeting
3
Construction of the water supply and sewerage works must not Prior to the
commence until a joint Pre-start Meeting has occurred, between: commencement
(a) the responsible consulting engineer; of construction.
(b) the principal contractor and the subcontractor (if any); and
(c) a Unitywater development officer.
NWA
Works at Applicant’s expense
4
The Applicant is responsible for all costs associated with the works that At all times
need to be constructed to comply with conditions unless otherwise stated during
in the condition. construction and
until works are
accepted ‘Off-
Maintenance’.
NWA
Standards
5
At all times
Construct all works in accordance with the approved drawings, the South during
East Queensland Water Supply and Sewerage Design and Construction construction and
Code, Unitywater’s Connections Administration Manual, other conditions until works are
stated in this Decision Notice for a water approval. accepted ‘Off-
Maintenance’.
NWA
Council approval
6
Submit a copy of the Council development permit that is consistent with
the connection approval with the request for the Pre-start Meeting.
Prior to request
Note: If a copy of the Council development permit is not able to be for a Pre-start
provided, a written statement describing the reasons why the approval is Meeting.
not attached must be submitted with the pre-start request form.
NWA
Workplace health and safety
7
Comply with the Work Health and Safety Act and Regulations.
Note: Should the Applicant fail to appoint a Principal Contractor within At all times
the meaning of that Act within the time required, the Applicant shall be during
the Principal Contractor under that Act and shall perform all duties of the construction and
Principal Contractor including but not limited to: until works are
accepted ‘Off-
Giving notice to the Director of Accident Prevention prior to Maintenance’.
commencing notifiable work; and
Page 5 of 16
Unitywater is a statutory authority that provides water and sewerage services for the Unitywater has certification to
OH&S ISO 4801:2001 Reg No 4260
Moreton Bay, Sunshine Coast and Noosa Council areas. Environmental ISO 14001:2004 Reg No 4259
Quality Systems ISO 9001:2008 Reg No 4258
Revision No: 2 Effective Date: 19/02/2015 Next Review Date:19/02/2018
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (2016008949 DECISION NOTICE - Signed.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.