2016008949 DECISION NOTICE - Signed

Attached to the e-mail Operational Works Application OPW16/0338.

of 16
  CAA
            Other approval requirements and compliance with all laws
   9
            This approval only authorises the connection to Unitywater’s infrastructure. This approval
            does not remove the need for other approvals in order to carry out the necessary work for the
            development.
            For example, the Applicant should consider the need to comply with relevant standards and
            obtain approvals for impacts arising from sediment and erosion control, flora and fauna and
            traffic/roads, including traffic management etc.
            The Applicant is responsible for obtaining all necessary approvals for its development and
            complying with all laws including all environmental laws.
  CAA
            Third party property
   10
            If any infrastructure authorised by this approval is to be constructed on property that is not
            owned or controlled by the Applicant, it is the Applicant’s or developer’s responsibility to gain
            the necessary consents to install that infrastructure.
  CAA
            Connection to Unitywater network/s
   11
            Connections to the existing Unitywater water supply and/or sewerage network/s will only be
            carried out by Unitywater or as agreed with Unitywater’s Private Works section and by
            application. Connections will only be completed after the new infrastructure has been
            accepted ‘On-Maintenance’.
            Works on or in close proximity to existing Unitywater infrastructure require consultation with
            Unitywater Private Works prior to commencement of construction. Private Works shall be
            contacted (allow a minimum of five working days for processing) prior to commencing work.
            The requirement for a Network Intervention application will require additional processing time.
  CAA
            Water service/s installation
   12
            If this application is subject to the payment of Infrastructure Charges, Unitywater will install
            the water service/s within 20 business days after the payment of the Infrastructure Charges.
  CAA
            Errors and Omissions
   13
            This approval shall not be taken to mean that the drawings have been checked in detail,
            Unitywater accepts no responsibility whatsoever for the survey information, the design, or for
            the accuracy of any information or detail contained in the drawings and specifications.
            Where errors or omissions occur in the design drawings or specifications, or where works do
            not conform to or meet Unitywater standards, the Applicant’s Consultant shall rectify such to
            comply with those standards at no cost to Unitywater.
            Where drawings contain insufficient detail or do not contain details of works that are either
            necessary or associated with the development then these works shall be designed and
            constructed to Unitywater standards, as required by Unitywater.
            Unitywater reserves the right to amend the approved drawings or request further information
            should this become necessary. Only the Unitywater approved drawings shall be used for
            construction.
  CAA
            Existing water meter/s
   14
            The Applicant is advised that if the existing water meter currently serving the property will no
            longer be required, an application (Standard Connection Request) must be made to
            Unitywater to disconnect the meter.
            A fee is applicable for the disconnection of services.
                                                                                                                                           Page 7 of 16
Unitywater is a statutory authority that provides water and sewerage services for the                           Unitywater has certification to
                                                                                                                OH&S ISO 4801:2001 Reg No 4260
Moreton Bay, Sunshine Coast and Noosa Council areas.                                                            Environmental ISO 14001:2004 Reg No 4259
                                                                                                                Quality Systems ISO 9001:2008 Reg No 4258

                                                     Revision No: 2                Effective Date: 19/02/2015            Next Review Date:19/02/2018

Log in to download the original (2016008949 DECISION NOTICE - Signed.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.