Town Planning Report - Material Change of Use Outdoor Sport and Recreation - Temporary relocation ~ Lake Macdonald Dr Lake Mac
Town Planning Report
Material Change of Use – Outdoor Sport and Recreation (Temporary Use)
treatments, screening or landscaping, whilst allowing for flow through of flood waters on the AO6.4 – Orientation and activation of street frontage
ground floor.
The development does not involve a conventional building design or active street
Editor's Note— The use of flood resilient building materials is also encouraged for building works up to frontage, given its temporary, utilitarian storage function. The lightweight nature of the
the probable maximum flood to reduce the consequences of flooding. structure allows floodwaters to pass around it without obstruction.
AO6.5 AO6.5 – Basements and underground car parking
Basements and underground car parking areas are designed to drain and function safely No basements or underground car parking areas are proposed as part of the
during a flood event and power failure. development.
Editor's note—Basements should have flood immunity above the 1%AEP defined flood event with
alternative means to mechanical pumping used to achieve such immunity.
Disaster management
PO7 AO7.1
Complies
Development is located to support self-evacuation of people and ensure sufficient warning
Development supports, and does not unduly burden, disaster management response or
time for the nature of the use. AO7.1 – Self-evacuation and warning time
recovery capacity or capabilities. AO7.2
Development does not: The development supports effective self-evacuation and provides sufficient flood
(e) increase the number of people calculated to be at risk from flooding; warning time for the nature of the use. The proposal involves a non-habitable storage
(b) increase the number of people likely to need evacuation; container only, and rowing and associated activities will not occur during flood events.
(c) shorten flood warning times for other uses in the floodplain; or This operational restriction will be incorporated into the Operational Management Plan,
(e) impact on the ability of traffic to use evacuation routes, or unreasonably increase ensuring people are not present on site during flood conditions.
traffic volumes on evacuation routes.
AO7.3 AO7.2 – Flood risk to people and evacuation
Materials stored on site: The development does not increase flood risk to people elsewhere on the floodplain. In
(d) are readily able to be moved in a flood event to a flood free area; or particular, the proposal:
(b) are contained in order to minimise movement in times of flood.
Editor's Note— Businesses should ensure that necessary emergency and continuity plans are in place to • Does not increase the number of people at risk from flooding, as the structure is
account for the potential need to evacuate personnel and to relocate property prior to a flood event. not occupied during flood events;
• Does not increase the number of people requiring evacuation;
• Does not shorten flood warning times for other floodplain uses; and
• Does not impact evacuation routes or increase traffic volumes, as no additional
population or traffic generation is associated with the development.
Accordingly, AO7.2 is satisfied.
AO7.3 – Storage of materials
All materials associated with the use (rowing equipment) will be stored wholly within
the shipping container, which will be securely anchored. This ensures stored materials
are contained and will not become mobile during flood events, minimising risk to
people, property, and downstream areas.
Essential network infrastructure
PO8 AO8
Not Applicable
Essential network infrastructure maintains effective function during and immediately after Essential network infrastructure that is likely to fail to function or may result in
The proposed development does not involve the installation, relocation, or operation of
flood and storm tide inundation events. contamination when inundated by flood water (e.g. water supply pipeline air valves and the
essential network infrastructure. No water supply infrastructure, air valves, sewerage
like) is located above the DFE level (or where the DFE has not been modelled for the area,
infrastructure, or other services that could fail or cause contamination during inundation
above the highest recorded flood level for the area).
are proposed.
Version No: Version Date: Document title Seqwater Document Number Page:
02 11/06/2026 Town Planning Report – Material Change of Use – Temporary Use D 58 of 59
This document is the property of Seqwater. It must not be copied or reproduced in any way whatsoever without the authority of Seqwater. This document is uncontrolled when printed. An electronic database manages and stores the controlled version.