Original source · versioned page text
Decision Notice OPW20/0243
Officer: Mark Lewis Direct Telephone: 07 53296290 Our Reference: OPW20/0243 : JElder Your Reference: 17481 15 February 2021 Ms SL King C/- Superior Jetties PO Box 202 LABRADOR QLD 4215 [email protected] Dear Sir, Decision Notice Planning Act 2016 I refer to your application and advise that on 9 February 2021, Council decided to approve the application subject to conditions. Details of the decision are as follows: application details Application No: OPW20/0243 Street address: 27 Cooran Ct Noosa Heads Qld 4567 Real property description: Lot 205 N 21857 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details Council decided to issue the following type of approval: Development Permit for Operational Works - Prescribed Tidal Works (Pontoon) CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 17481-D01 C Site Plan, Elevation and General Notes prepared by Superior Jetties 21 January 2021 17481-D02 A Pontoon Construction Details prepared by Superior Jetties 21 January 2021 17481-D03 Gangway Construction Details prepared by Superior Jetties 10 August 2020 17481-D04 Gangway Bracket Construction Details prepared by Superior Jetties 10 August 2020 Currency Period The Currency Period for this development approval lapses if all conditions have not been complied with by 9 February 2023, unless an application to extend the currency period is approved by Council. General Conditions All redundant elements of the existing jetty and boatlifting device, both above and below water level, must be wholly removed as part of these works All structures must be designed and constructed such that they are free standing within the waterway and are not connected to or behind the revetment wall All structures must have no detrimental effects on stormwater drains and/or easements. A rigid handrail must be fitted on at least one side of the walkway. No posts or vertical supports of the proposed fixed section are to extend vertically from the structure unless they provide necessary support for the handrail. No boatlifting devices are to be attached or moored at the structures for the purpose of elevating a vessel above the water without Council approval. There must be no electrical reticulation system carrying electricity in excess of 24 volts beyond the revetment wall unless all switches and power outlets are positioned above the 1%AEP flood level. Lighting associated with the use must be designed, installed, operated, and maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting. The pontoon is to be used for private purposes only with no commercial operations to be undertaken. Boat repair activities are not permitted on site. Wastewater and sullage must only be disposed of at approved pumpout facilities. The mooring facility must not be utilised for live-aboard purposes. Any construction and post construction activity is not to impact on the condition of the waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009. Certification by a Registered Professional Engineer of Queensland that states that the pontoon and gangway are constructed in accordance with best practice methods and are structurally sound must be submitted to Council. This certification must be submitted to Council within three (3) months of the completion of the works. A final inspection and approval of the structure by Council’s Inspector is also required. Please contact Council’s Development Assessment Branch on 5329 6500 to arrange the inspection. This approval lapses where the construction of the pontoon has not commenced within two (2) years of the date of issue of the approval, unless application is made and approved by Council for an extension. After completion, the proposed works must be maintained in a sound state of repair in accordance with the approved plans referral agencies The referral agencies applicable to this application are: Referral Status Referral Agency and Address Referral Trigger Response Concurrence SARA at DILGP SARA at DILGP Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9701 or email:[email protected] Planning Regulation 2017 Schedule 10, Part 17 – Tidal Works or Works in a Coastal Management District The agency provided its response on 4 December 2020 (Reference No. 2011-19754 SER). A copy of the response is attached Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: ADVISORY NOTES: General Advisory Notes Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. The approval or conditions do not absolve the owner of the land from complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory regulations in the execution and/or performance of said works. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Building and Construction Industry (Portable Long Service Leave) Levy The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act). The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act. property notes Not applicable. VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Mark Lewis Coordinator - Engineering Enc: Appeal Rights Referral Agency Response Approved Plans/Documents cc. SARA at DILGP Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9701 or email [email protected]) Unitywater Referral Agency Response PLANNING ACT 2016 & PLANNING REGULATION 2017 Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 229 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 230 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 231 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 232 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer1.xml] Page 16 of 16 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 16 [Attachment: image10.png (image text)] ‘+ To ensure the development is carried out generally in accordance with the plans of development submited with the application. ‘+ To facilitate the monitoring ofthe development works for compliance purposes. ‘+ To-ensure that at imes, all ights on or above the development site do not intarfare wih asfe ‘navigation in surrounding waterways. 1+ Totensure the development does nat encroach onthe navigable waterway in a way thatimpedes the safe passage of vessels. ‘+ Totensure thatthe cosstal resource (State land) is appropriately administered under the Coastal Protection and Management Act 1996 and the Land Act 1994 1+ To ensure impacts on coastal values (water quality) are avoided or minimised. 1+ To-ensure importation of materials does nt resultin adverse impacts on coastal values. Chemical and other contaminants have the potential to have an unacceptable impact on coastal values. 1+ To ensure damaged structures donot impact on coastal resources and public safety. Evidence or other material on which the findings were based ‘© development application ‘+ SDAP, version 26, published by SARA ‘+ Planning Act 2016 ‘+ Planning Regulation 2017 ‘tt Asseeemert ana Reta Agen) Pagezer2 [Attachment: image11.png (image text)] waar MANS \| BE west soz 107 D [Attachment: image12.png (image text)] Development Assessment Rules—Representations about a teferral agency response “The following provisions are those set outin sections 22 and 20 ofthe Development Assessment Rulest regarding representations about a referral agency response Part 6: Changes to the application and referral agency Tesponses 28 Concurrence agency changes its response or gives a late response 28.1. Despite part2, a concurrence agency may, afters referal agency assessment period and any further period agreed ends, change its referral agency response or give a late referral agency response before the application is decided, subject to section 282 and 28.3. 28.2 A concurence agency may change its referral agency response at any ime before the application fs decices i (2) the change isin response to a change which the assessment managers satisfied is a change under section 26.1: oF () the Minister has given the concurrence agency a direction under section 98 ofthe Act: or (6) the applicant has given written agreement to the change to the referral agency response? 28.3. A concurence agency may give alate referral agency response before the application is decided, Ifthe applicanthas given witten agreement tothe late referral agency response, 28:4. Ifa concurence agency proposes to change is referral agency response under section 2 2(a), the concurrence agency must— (3) ive notice ofits intantion to change its referral agency response to the assessment manager and copy to the applicant within 5 days of recsving ntioe ofthe change under section 26.1; ond () the concurrence agency has 10 days ftom the day of giving notice under paragraph (a) or 2 ‘further period agreed between the applicant and the concurrence agency, to give an amended referral agency response tothe assessment manager and 3 copy othe applicant 1 Pursuant to Section 68 ofthe Planning Act 2016 2 Inthe instance an applicant has made representations tothe concurrence agency under section 30, land the concurrence agency agrees fo make the change included in the representstions,secton 2.2(¢)'s taken to have been satsied [Attachment: image13.png (image text)] Part 7: Miscellaneous 30 Representations about a referral agency response 20.1, An applicant may make representations to a concurrence agency st any ime before the application | decided, about changing a matter in the referral agency response? 2 An applicant may elect, under section 32, to stop the assessment managers decision period in which 1 take this action. If» concurrence agency wishes to amend ther response in relation to representations made under this section, they must do so in scoordance with section 28. [Attachment: image14.png (image text)] ee) NOOSA COUNCIL [Attachment: image3.png (image text)] eenslané Sovemment ‘Queensland Treasury ureeference: ——2011-10754SER “4 December 2020 ‘Sonia King (Ch Superior Jetes PO BOX 202 LABRADOR @L0 4215 ‘[email protected] [Atenton: Ms Sonia king Dear Ms king Early referral response—with conditions (Given under sacbon 67 ofthe Planning Act 2016) “The State Assessment and Referral Agency (SARA) received your request for an early referral response fn 13 Novernber 2020 forthe proposed development application described below. Applicant details “Applicant name: “Sonia King Applicant contact details: Cl Superior Jettas PO BOX 202 LABRADOR QLD 4215 ‘[email protected] Location details ‘Steet address: 27 Goran Court, Noosa Heads Real property description: Lot 208 on N21857 ‘Local government area: Noosa Shire Council Application details Development permit “Operational work for praserbed tal works (removal ofan existing jy ‘snd the constuction ofa pontoon) Referral triggers “This early referral response is given forthe following provisions ofthe Planning Regulation 2017: Sam acura gor Whe anem Bulan, Level 12 Fst ‘Aten aeecryaore Page rote Popo Ts watoosyore GLO Asse [Attachment: image4.png (image text)] © torrasa “Tidal works or work in @ coastal management distict + torra24 “Tidal works or work in @ coastal management distict Conditions Under section £6(1)(0)() ofthe Planning Act 2016 (he Act) the conditions set out in Attachment 1 must be attached to any development approval Reasons for decision to impose conditions ‘SARA must provide reasons forthe decision to impose conditions. These reasons are set out in ‘Atachmant 2. ‘Approved plans and specifications ‘SARA requires thatthe plans and specications set out below and enclosed must be attached to any evelopment approval Drawinglrepor title Prepared by Date Reference no. | Versionlssue “Aspect of development: Operational work for pre “Ste Plan, Elevaton and | Superior Jats ‘oresr2020 | 17481 Dot 5 General Notes Pursuant to section 644) of the Act, you will not be required to refer your application to SARA if you submit his early referral response i ts entirety when making the application tothe assessment ‘manager, and the folowing conditons are satisfied ‘+ Any changes to the proposal before the application is made tothe assessment manager donot ‘esutin a substantially efferent development o that which was presented to SARA with the request for an eaty referral response “+The development application must be made tothe assessment manager within 12 months of the date ofthis early referral response, Forfurtnr information please contact Danika Cowie, Principal Planning Officer. on (07) £282 8776 or vis ‘email [email protected] su who wil be plessed to assist. amsics Hewston Principal Panning Offcer ene Altachment!—Constons tobe imposes ‘tachment 2—Reasons fer decision fo impose constons ‘Approved plans and spectiatons ‘tt Asseeemert ana Reta Agen) Pagezers [Attachment: image5.png (image text)] [Attachment 1—Conditions to be imposed We. ‘Conditions ‘Condition timing ‘Operational work for prescribed tidal works (removal ofan existing jety ‘of a pontoon) ‘and the construction 10.17 tobet ‘semi istration and enforcement of any matter relating othe folowing condition 3.1.1—Tidal works of work ina coastal management dstct_—The chief executve administering the Planning Act 2016 nominates the Director General ofthe Dapartment of the enforcement authoty forthe development to which this development approval relates forthe vironment and Scienes 7 “The pontoon must be cared oul generally in accordance with te following plan: 1+ Ste Plan, Elevation and General Notes prepared by Superior Jeties, dated 10/08/2020, reference 17481 — DOI and revision & For the duration ofthe works and to be maintained “The works fo which this approval relates are to be fora private purpose only. Bratman "Any operator and contactor involved in the works to which tis| ‘approval relates must: 12) be provided a copy of these referral agency conditions: ») install ll measures, plant and equipment necessary to ‘ensure compliance with the conditions of this approval: 2) maintain such measures, plant and equipment in a proper ‘and efficient conltion: and 1) operate such measures, plant and equipmentin = proper _and effcient manner. During construction. ‘For he pontoon works only use materials which are Fee fom ‘contaminants az dafned under section 11 ofthe Environmental Protection Aet 1994, During construction. ‘Should the works become damaged as a result of erosion, flooding for storm tide inundation the registered landowner(s) of the subject [and shal be responsible forthe removal ofall debris at their own expense. Bratman 10.17. '32.1—Tidal works of workin a coastal management dstct_—The chief executve administering the Planning Act 2016 nominstas the Director-General of the Department of Transport and Main Roads to be the enforcement authority forthe development to which his deve {or the administration and enforcement of any matter relating to the following condltons: lopment approval relates = "The development must be cared out generally in accordance with the folowing plans: 1+ Ste Plan, Elevation and General Notes prepared by Superior ‘etic, dated 10/08/2020, reference 17481 —DO1 and revision For the duration ofthe works. '2)_ Provide writen notice te Regional Harbour Master Mariime Safety Queensiang Macarthur Avenue East Pinkenbs, Gig, 4008, meq idee brisbane mea aldcov.au “Atleast wo (2) weeks prior tothe ‘commencement of works. ‘tt Asseeemert ana Reta Agen) Pagers [Attachment: image6.png (image text)] ‘when the development authorised under this approval is ‘schadulad fo commence, Each notice must state this application number, the locaton ‘and name of registered place and the coniton number Under which the notice is being given. ») Provide writen notice to Regional Harbour Master Mariime Safety Queensiang Macarthur Avenue East Pinkenba, Qld, 4008, meq dae Brisbane@mea aldgov.au when the development authorised under this approval has been completed. Each notice must state this application number, the locaton ‘and name of registered place and the condition number under which the notice is being given ) Wein two (2) weeks. ‘of the completion of works. | As Constuces? drawings ofthe approved structure must be provided to: Regional Harbour Master Maritime Safety Queensland Macarthur Avenue East Pinkenba, Qld. 4008, meq idee brisbane mea aldcov.au ‘Within two @2) weeks of the completion ofthe works. | Alvessels, structures, plant and equipment associated withthe ‘onstruction of the approved works must be ivmarked in accordance with the folowing specications and requirements such that Lndertaking the construction works does not cause a risk to the safe navigation of ships: (@) Any anchors deployed must be marked with yellow buoys, ‘and ited with FL yellow lights ited (©) Lighting provided must not obscure, disguise or otherwise interfere wih the effecivensss of navigatona lighting, ‘While the works ae ‘coouring 10, _| The sricture must be ifmarked in aocordanoe with the folowing specfioations, such that it does not cause a isk tothe safe ‘navigation of other ships: {@) Lighting must be provided in accordance with Martime ‘Safety Queensiand's requirements and section 3ofAS 44222-1007 ‘Control ofthe obtrusive effects of outdoor lighting. (©) Lighting provided must not obscure, disguise or otherwise interfere wih the effectiveness of navigstona lighting, Bratman 1 (@) Any debris o similar cbstrucion encountered whilst Undertaking the work must be disposed of atthe applicant's () Allpiles andlor structures to be demolished, both above and below the watefine must be completely extractediremoved. Bratman ‘tt Asseeemert ana Reta Agen) Pagesers [Attachment: image8.png (image text)] ‘Attachment 2—Reasons for decision to impose conditions “The reasons for his dacison are “The proposed developments loested in a developed tidal waterway (Noosa Rive). “The proposed davelopmentis forthe ramoval of an existing ety and the constructon of pontoon, “The proposed structure does not impede the safe movement of vessels in a navigable waterway. “To ensure the developments eared out ganerallyn accordance wih the plans of development submited with the application. “To factate the monitoring ofthe development works for compliance purposes. 4+ Totensure that at imes, all ights on or above the development site do not intarfare wih eafe ‘navigation in surrounding waterways. “+ Totensure the development does not encroach onthe navigable waterway in a way tatimpedes the safe passage of vessels. ‘+ Totensure thatthe cosstal resource (State land) is appropriately administered under the Coastal Protection and Management Act 1996 and the Land Act 1994 1+ To ensure impacts on coastal values (water quality) are avoided or minimised. ‘+ Toensure importation of materials does nt resultin adverse impacts on coastal values. Chemical {and other contaminants have the potential to have an unacceptable impact on coastal values. 1+ To ensure damaged structures donot impact on coastal resources and public safety. Evidence or other material on which the findings were based development application ‘State Development Acsecoment Provisions published by SARA (Version 2.8) Planning Act 2016 Planning Regulation 2017 ‘tt Asseeemert ana Reta Agen) Pagesers [Attachment: image9.png (image text)] ieenslané Sovemment ‘Queensland Trensury ‘State Assessment and Referral Agency (SARA) ‘Statement of reasons for application 2011-19754 SER (Given under sacton £6 ofthe Planning Act 2016) SARA roe: Referal agency details ‘Applicant name: ‘Sonia King Applicant contact details: Cl: Superior Jettes PO BOX 202 LABRADOR QLD 4216 [email protected] Location details ‘Steet address: 27 Cooran Cour, Noosa Heads Real property description: Let 205 on N21857 ‘Local government area: Noosa Shire Counci Development details ‘Development permit “Operational work for prescribed tal works (removal fan existing Jy {and the construction of @ pontoon) ‘Assessment matters ‘Aspect of development ‘Applicable codes: requiring code assessment Planning Regulation 2017, “Slate Development Azoesoment Provisions (SDAP), version 26 ‘Schedule 10, Part 17, Division 3, | State code 8: Coastal development and tidal works “Table 1 tem 1 ~ Tidal works or “workin 8 coastal management dietict Planning Regulation 2017, ‘SDAP, version 26 ‘Schedule 10, Part 17, Division 3, | State code 7: Martime safety “Table 2, em 1 ~ Tidal works or “workin 3 coastal management istic “The reasons for his dacison are 1+ The proposed development is locate in a developed tidal waterway (Noosa River). “+The proposed development is for the removal ofan existing jetty and the constructon of pontoon, ‘+The proposed structure does nat impede the safe movement of vessels in a navigable waterway. Sam acura gor Whe anem Bulan, Level 12 Fst ‘Aten aeecryaore Page ror2 Popo Ts watoosyore GLO Asse
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.