Decision Notice OPW20/0243

of 1

Page text shows just the words. Original shows the document exactly as it was published.

Officer: 	Mark Lewis
Direct Telephone: 	07 53296290
Our Reference:	OPW20/0243 : JElder
Your Reference:	17481
15 February 2021
Ms SL King
C/- Superior Jetties
PO Box 202
LABRADOR QLD  4215
[email protected]
Dear Sir,
Decision Notice
Planning Act 2016
I refer to your application and advise that on 9 February 2021, Council decided to approve the application subject to conditions.
Details of the decision are as follows:
application details
Application No:	OPW20/0243
Street address:	27 Cooran Ct Noosa Heads Qld 4567
Real property description:	Lot 205 N 21857
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
Decision details
Council decided to issue the following type of approval:
Development Permit for Operational Works - Prescribed Tidal Works (Pontoon)
CURRENCY PERIOD of approval
The currency period for this development approval is stated in the conditions below.
assessment manager conditions
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
17481-D01	C	Site Plan, Elevation and General Notes prepared by Superior Jetties	21 January 2021
17481-D02	A	Pontoon Construction Details prepared by Superior Jetties	21 January 2021
17481-D03		Gangway Construction Details prepared by Superior Jetties	10 August 2020
17481-D04		Gangway Bracket Construction Details prepared by Superior Jetties	10 August 2020
Currency Period
The Currency Period for this development approval lapses if all conditions have not been complied with by 9 February 2023, unless an application to extend the currency period is approved by Council.
General Conditions
All redundant elements of the existing jetty and boatlifting device, both above and below water level, must be wholly removed as part of these works
All structures must be designed and constructed such that they are free standing within the waterway and are not connected to or behind the revetment wall
All structures must have no detrimental effects on stormwater drains and/or easements.
A rigid handrail must be fitted on at least one side of the walkway.
No posts or vertical supports of the proposed fixed section are to extend vertically from the structure unless they provide necessary support for the handrail.
No boatlifting devices are to be attached or moored at the structures for the purpose of elevating a vessel above the water without Council approval.
There must be no electrical reticulation system carrying electricity in excess of 24 volts beyond the revetment wall unless all switches and power outlets are positioned above the 1%AEP flood level.
Lighting associated with the use must be designed, installed, operated, and maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
The pontoon is to be used for private purposes only with no commercial operations to be undertaken.
Boat repair activities are not permitted on site.
Wastewater and sullage must only be disposed of at approved pumpout facilities.
The mooring facility must not be utilised for live-aboard purposes.
Any construction and post construction activity is not to impact on the condition of the waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009.
Certification by a Registered Professional Engineer of Queensland that states that the pontoon and gangway are constructed in accordance with best practice methods and are structurally sound must be submitted to Council. This certification must be submitted to Council within three (3) months of the completion of the works. A final inspection and approval of the structure by Council’s Inspector is also required. Please contact Council’s Development Assessment Branch on 5329 6500 to arrange the inspection.
This approval lapses where the construction of the pontoon has not commenced within two (2) years of the date of issue of the approval, unless application is made and approved by Council for an extension.
After completion, the proposed works must be maintained in a sound state of repair in accordance with the approved plans
referral agencies
The referral agencies applicable to this application are:
Referral Status	Referral Agency and Address	Referral Trigger	Response

Concurrence	SARA at DILGP SARA at DILGP Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9701 or email:[email protected]	Planning Regulation 2017 Schedule 10, Part 17 – Tidal Works or Works in a Coastal Management District	The agency provided its response on 4 December 2020 (Reference No. 2011-19754 SER). A copy of the response is attached

Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
ADVISORY NOTES:
General Advisory Notes
Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works.  A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ.  The RPEQ bears full responsibility for all aspects of the engineering design.  Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent.
The approval or conditions do not absolve the owner of the land from complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory regulations in the execution and/or performance of said works.
Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time.
Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees.
Building and Construction Industry (Portable Long Service Leave) Levy
The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
property notes
Not applicable.
VARIATION approval details
Not applicable.
further development permits required
Not applicable.
submissions
Not applicable.
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.
OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

Yours faithfully,

Mark Lewis
Coordinator - Engineering

Enc:	Appeal Rights
Referral Agency Response
Approved Plans/Documents

cc.	SARA at DILGP
Via MyDAS2 at https://prod2.dev-assess.qld.gov.au/suite/
(for assistance, contact DILGP at 5352 9701 or email [email protected])
Unitywater

	Referral Agency Response PLANNING ACT 2016 & PLANNING REGULATION 2017

	Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017

Chapter 6 Dispute resolution
Part 1 Appeal rights
229 Appeals to tribunal or P&E Court
(1)	Schedule 1 of the Planning Act 2016 states –
(a)	Matters that may be appealed to –
(i)	either a tribunal or the P&E Court; or
(ii)	only a tribunal; or
(iii)	only the P&E Court; and
(b)	The person-
(i)	who may appeal a matter (the appellant); and
(ii)	who is a respondent in an appeal of the matter; and
(iii)	who is a co-respondent in an appeal of the matter; and
(iv)	who may elect to be a co-respondent in an appeal of the matter.
(2)	An appellant may start an appeal within the appeal period.
(3)	The appeal period is –
(a)	for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or
(b)	for an appeal against a deemed refusal – at any time after the deemed refusal happens; or
(c)	for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or
(d)	for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or
(e)	for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or
(f)	for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person.
Note –
See the P&E Court Act for the court’s power to extend the appeal period.
(4)	Each respondent and co-respondent for an appeal may be heard in the appeal.
(5)	If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal.
(6)	To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about-
(a)	the adopted charge itself; or
(b)	for a decision about an offset or refund-
(i)	the establishment cost of trunk infrastructure identified in a LGIP; or
(ii)	the cost of infrastructure decided using the method included in the local government’s charges resolution.
230 Notice of appeal
(1)	An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that-
(a)	is in the approved form; and
(b)	succinctly states the grounds of the appeal.
(2)	The notice of appeal must be accompanied by the required fee.
(3)	The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to –
(a)	the respondent for the appeal; and
(b)	each co-respondent for the appeal; and
(c)	for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and
(d)	for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and
(e)	each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and
(f)	for an appeal to the P&E Court – the chief executive; and
(g)	for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate.
(4)	The service period is –
(a)	if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or
(b)	otherwise – 10 business days after the appeal is started.
(5)	A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6).
(6)	A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person.
231 Other appeals
(1)	Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable.
(2)	The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error.
(3)	A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter.
(4)	In this section –
decision includes-
(a)	conduct engaged in for the purpose of making a decision; and
(b)	other conduct that relates to the making of a decision; and
(c)	the making of a decision or failure to make a decision; and
(d)	a purported decision; and
(e)	a deemed refusal.
non-appealable, for a decision or matter, means the decision or matter-
(a)	is final and conclusive; and
(b)	may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and
(c)	is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground.
232 Rules of the P&E Court
(1)	A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal.
(2)	However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court

[word/footer1.xml]
Page 16 of 16

[word/footer2.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 16

[Attachment: image10.png (image text)]
‘+ To ensure the development is carried out generally in accordance with the plans of development
submited with the application.

‘+ To facilitate the monitoring ofthe development works for compliance purposes.

‘+ To-ensure that at imes, all ights on or above the development site do not intarfare wih asfe
‘navigation in surrounding waterways.

1+ Totensure the development does nat encroach onthe navigable waterway in a way thatimpedes the
safe passage of vessels.

‘+ Totensure thatthe cosstal resource (State land) is appropriately administered under the Coastal
Protection and Management Act 1996 and the Land Act 1994

1+ To ensure impacts on coastal values (water quality) are avoided or minimised.

1+ To-ensure importation of materials does nt resultin adverse impacts on coastal values. Chemical
and other contaminants have the potential to have an unacceptable impact on coastal values.

1+ To ensure damaged structures donot impact on coastal resources and public safety.

Evidence or other material on which the findings were based
‘© development application

‘+ SDAP, version 26, published by SARA

‘+ Planning Act 2016

‘+ Planning Regulation 2017

‘tt Asseeemert ana Reta Agen) Pagezer2


[Attachment: image11.png (image text)]
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

 

 

 

 

waar MANS

\| BE west

soz 107 D

 

  
   

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


[Attachment: image12.png (image text)]
Development Assessment Rules—Representations about a
teferral agency response

“The following provisions are those set outin sections 22 and 20 ofthe Development Assessment Rulest
regarding representations about a referral agency response

Part 6: Changes to the application and referral agency
Tesponses

28 Concurrence agency changes its response or gives a late response

28.1. Despite part2, a concurrence agency may, afters referal agency assessment period and any
further period agreed ends, change its referral agency response or give a late referral agency
response before the application is decided, subject to section 282 and 28.3.

28.2 A concurence agency may change its referral agency response at any ime before the application
fs decices i
(2) the change isin response to a change which the assessment managers satisfied is a change

under section 26.1: oF
() the Minister has given the concurrence agency a direction under section 98 ofthe Act: or
(6) the applicant has given written agreement to the change to the referral agency response?

28.3. A concurence agency may give alate referral agency response before the application is decided,

Ifthe applicanthas given witten agreement tothe late referral agency response,

28:4. Ifa concurence agency proposes to change is referral agency response under section 2 2(a),
the concurrence agency must—

(3) ive notice ofits intantion to change its referral agency response to the assessment manager
and copy to the applicant within 5 days of recsving ntioe ofthe change under section 26.1;
ond

() the concurrence agency has 10 days ftom the day of giving notice under paragraph (a) or 2
‘further period agreed between the applicant and the concurrence agency, to give an amended
referral agency response tothe assessment manager and 3 copy othe applicant

1 Pursuant to Section 68 ofthe Planning Act 2016

2 Inthe instance an applicant has made representations tothe concurrence agency under section 30,
land the concurrence agency agrees fo make the change included in the representstions,secton
2.2(¢)'s taken to have been satsied


[Attachment: image13.png (image text)]
Part 7: Miscellaneous

30 Representations about a referral agency response

20.1, An applicant may make representations to a concurrence agency st any ime before the application
| decided, about changing a matter in the referral agency response?

2 An applicant may elect, under section 32, to stop the assessment managers decision period in which
1 take this action. If» concurrence agency wishes to amend ther response in relation to
representations made under this section, they must do so in scoordance with section 28.


[Attachment: image14.png (image text)]
ee) NOOSA COUNCIL


[Attachment: image3.png (image text)]
 

eenslané
Sovemment

‘Queensland Treasury

ureeference: ——2011-10754SER

“4 December 2020

‘Sonia King
(Ch Superior Jetes

PO BOX 202

LABRADOR @L0 4215
‘[email protected]

[Atenton: Ms Sonia king

Dear Ms king

Early referral response—with conditions
(Given under sacbon 67 ofthe Planning Act 2016)

“The State Assessment and Referral Agency (SARA) received your request for an early referral response
fn 13 Novernber 2020 forthe proposed development application described below.

Applicant details
“Applicant name: “Sonia King
Applicant contact details: Cl Superior Jettas
PO BOX 202
LABRADOR QLD 4215
‘[email protected]
Location details
‘Steet address: 27 Goran Court, Noosa Heads
Real property description: Lot 208 on N21857
‘Local government area: Noosa Shire Council
Application details
Development permit “Operational work for praserbed tal works (removal ofan existing jy
‘snd the constuction ofa pontoon)
Referral triggers

“This early referral response is given forthe following provisions ofthe Planning Regulation 2017:

Sam acura gor
Whe anem Bulan, Level 12 Fst

‘Aten aeecryaore
Page rote Popo Ts watoosyore GLO Asse


[Attachment: image4.png (image text)]
© torrasa “Tidal works or work in @ coastal management distict
+ torra24 “Tidal works or work in @ coastal management distict
Conditions

Under section £6(1)(0)() ofthe Planning Act 2016 (he Act) the conditions set out in Attachment 1 must
be attached to any development approval

Reasons for decision to impose conditions
‘SARA must provide reasons forthe decision to impose conditions. These reasons are set out in
‘Atachmant 2.

‘Approved plans and specifications
‘SARA requires thatthe plans and specications set out below and enclosed must be attached to any

evelopment approval

 

 

 

Drawinglrepor title Prepared by Date Reference no. | Versionlssue
“Aspect of development: Operational work for pre

“Ste Plan, Elevaton and | Superior Jats ‘oresr2020 | 17481 Dot 5
General Notes

 

 

 

 

 

 

 

Pursuant to section 644) of the Act, you will not be required to refer your application to SARA if you

submit his early referral response i ts entirety when making the application tothe assessment

‘manager, and the folowing conditons are satisfied

‘+ Any changes to the proposal before the application is made tothe assessment manager donot
‘esutin a substantially efferent development o that which was presented to SARA with the request
for an eaty referral response

“+The development application must be made tothe assessment manager within 12 months of the
date ofthis early referral response,

Forfurtnr information please contact Danika Cowie, Principal Planning Officer. on (07) £282 8776 or vis
‘email [email protected] su who wil be plessed to assist.

 

amsics Hewston
Principal Panning Offcer

ene Altachment!—Constons tobe imposes
‘tachment 2—Reasons fer decision fo impose constons
‘Approved plans and spectiatons

‘tt Asseeemert ana Reta Agen) Pagezers


[Attachment: image5.png (image text)]
[Attachment 1—Conditions to be imposed

 

We.

‘Conditions

‘Condition timing

 

‘Operational work for prescribed tidal works (removal ofan existing jety
‘of a pontoon)

‘and the construction

 

10.17

tobet
‘semi

istration and enforcement of any matter relating othe folowing condition

3.1.1—Tidal works of work ina coastal management dstct_—The chief executve administering
the Planning Act 2016 nominates the Director General ofthe Dapartment of
the enforcement authoty forthe development to which this development approval relates forthe

vironment and Scienes

 

7

“The pontoon must be cared oul generally in accordance with te
following plan:

1+ Ste Plan, Elevation and General Notes prepared by Superior
Jeties, dated 10/08/2020, reference 17481 — DOI and
revision &

For the duration ofthe
works and to be
maintained

 

“The works fo which this approval relates are to be fora private
purpose only.

Bratman

 

"Any operator and contactor involved in the works to which tis|
‘approval relates must:
12) be provided a copy of these referral agency conditions:
») install ll measures, plant and equipment necessary to
‘ensure compliance with the conditions of this approval:
2) maintain such measures, plant and equipment in a proper
‘and efficient conltion: and
1) operate such measures, plant and equipmentin = proper
_and effcient manner.

During construction.

 

‘For he pontoon works only use materials which are Fee fom
‘contaminants az dafned under section 11 ofthe Environmental
Protection Aet 1994,

During construction.

 

‘Should the works become damaged as a result of erosion, flooding
for storm tide inundation the registered landowner(s) of the subject
[and shal be responsible forthe removal ofall debris at their own
expense.

Bratman

 

10.17.

'32.1—Tidal works of workin a coastal management dstct_—The chief executve administering
the Planning Act 2016 nominstas the Director-General of the Department of Transport and Main
Roads to be the enforcement authority forthe development to which his deve

{or the administration and enforcement of any matter relating to the following condltons:

lopment approval relates

 

=

"The development must be cared out generally in accordance with
the folowing plans:

1+ Ste Plan, Elevation and General Notes prepared by Superior
‘etic, dated 10/08/2020, reference 17481 —DO1 and
revision

For the duration ofthe
works.

 

 

'2)_ Provide writen notice te
Regional Harbour Master
Mariime Safety Queensiang
Macarthur Avenue East
Pinkenbs, Gig, 4008,

meq idee brisbane mea aldcov.au

 

“Atleast wo (2)
weeks prior tothe
‘commencement of
works.

 

 

 

‘tt Asseeemert ana Reta Agen)

Pagers


[Attachment: image6.png (image text)]
 

‘when the development authorised under this approval is
‘schadulad fo commence,

Each notice must state this application number, the locaton
‘and name of registered place and the coniton number
Under which the notice is being given.

») Provide writen notice to
Regional Harbour Master
Mariime Safety Queensiang
Macarthur Avenue East
Pinkenba, Qld, 4008,
meq dae Brisbane@mea aldgov.au

when the development authorised under this approval has
been completed.

Each notice must state this application number, the locaton
‘and name of registered place and the condition number
under which the notice is being given

) Wein two (2) weeks.
‘of the completion of
works.

 

| As Constuces? drawings ofthe approved structure must be
provided to:

Regional Harbour Master

Maritime Safety Queensland

Macarthur Avenue East

Pinkenba, Qld. 4008,

meq idee brisbane mea aldcov.au

‘Within two @2) weeks of

the completion ofthe
works.

 

| Alvessels, structures, plant and equipment associated withthe

‘onstruction of the approved works must be ivmarked in accordance
with the folowing specications and requirements such that
Lndertaking the construction works does not cause a risk to the safe
navigation of ships:

(@) Any anchors deployed must be marked with yellow buoys,
‘and ited with FL yellow lights ited

(©) Lighting provided must not obscure, disguise or otherwise
interfere wih the effecivensss of navigatona lighting,

‘While the works ae
‘coouring

 

10, _| The sricture must be ifmarked in aocordanoe with the folowing
specfioations, such that it does not cause a isk tothe safe
‘navigation of other ships:

{@) Lighting must be provided in accordance with Martime
‘Safety Queensiand's requirements and section 3ofAS
44222-1007 ‘Control ofthe obtrusive effects of outdoor
lighting.

(©) Lighting provided must not obscure, disguise or otherwise
interfere wih the effectiveness of navigstona lighting,

Bratman

 

1 (@) Any debris o similar cbstrucion encountered whilst
Undertaking the work must be disposed of atthe applicant's

() Allpiles andlor structures to be demolished, both above and
below the watefine must be completely extractediremoved.

 

 

Bratman

 

 

 

‘tt Asseeemert ana Reta Agen)

Pagesers


[Attachment: image8.png (image text)]
‘Attachment 2—Reasons for decision to impose conditions

“The reasons for his dacison are
“The proposed developments loested in a developed tidal waterway (Noosa Rive).

“The proposed davelopmentis forthe ramoval of an existing ety and the constructon of pontoon,

“The proposed structure does not impede the safe movement of vessels in a navigable waterway.

“To ensure the developments eared out ganerallyn accordance wih the plans of development

submited with the application.

“To factate the monitoring ofthe development works for compliance purposes.

4+ Totensure that at imes, all ights on or above the development site do not intarfare wih eafe
‘navigation in surrounding waterways.

“+ Totensure the development does not encroach onthe navigable waterway in a way tatimpedes the
safe passage of vessels.

‘+ Totensure thatthe cosstal resource (State land) is appropriately administered under the Coastal
Protection and Management Act 1996 and the Land Act 1994

1+ To ensure impacts on coastal values (water quality) are avoided or minimised.

‘+ Toensure importation of materials does nt resultin adverse impacts on coastal values. Chemical
{and other contaminants have the potential to have an unacceptable impact on coastal values.

1+ To ensure damaged structures donot impact on coastal resources and public safety.

Evidence or other material on which the findings were based

development application
‘State Development Acsecoment Provisions published by SARA (Version 2.8)
Planning Act 2016

Planning Regulation 2017

‘tt Asseeemert ana Reta Agen) Pagesers


[Attachment: image9.png (image text)]
ieenslané
Sovemment

‘Queensland Trensury
‘State Assessment and Referral Agency (SARA)

‘Statement of reasons for application 2011-19754 SER
(Given under sacton £6 ofthe Planning Act 2016)

 

 

SARA roe: Referal agency
details
‘Applicant name: ‘Sonia King
Applicant contact details: Cl: Superior Jettes
PO BOX 202
LABRADOR QLD 4216
[email protected]
Location details
‘Steet address: 27 Cooran Cour, Noosa Heads
Real property description: Let 205 on N21857
‘Local government area: Noosa Shire Counci
Development details
‘Development permit “Operational work for prescribed tal works (removal fan existing Jy
{and the construction of @ pontoon)
‘Assessment matters
‘Aspect of development ‘Applicable codes:

requiring code assessment

 

Planning Regulation 2017, “Slate Development Azoesoment Provisions (SDAP), version 26
‘Schedule 10, Part 17, Division 3, | State code 8: Coastal development and tidal works

“Table 1 tem 1 ~ Tidal works or

“workin 8 coastal management
dietict

 

Planning Regulation 2017, ‘SDAP, version 26
‘Schedule 10, Part 17, Division 3, | State code 7: Martime safety
“Table 2, em 1 ~ Tidal works or

“workin 3 coastal management
istic

 

 

 

 

“The reasons for his dacison are
1+ The proposed development is locate in a developed tidal waterway (Noosa River).

“+The proposed development is for the removal ofan existing jetty and the constructon of pontoon,
‘+The proposed structure does nat impede the safe movement of vessels in a navigable waterway.

Sam acura gor
Whe anem Bulan, Level 12 Fst

‘Aten aeecryaore
Page ror2 Popo Ts watoosyore GLO Asse
Log in to download the original file

Decision Notice OPW20_0243.docx · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.