Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Annexure B SDAP Coastal

Attached to the e-mail Planning report & IDAS Forms, Annexure A,B,D,E,F,G - Email 1 of 2 MCU17/0035.

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Performance outcomes                             Acceptable outcomes                                                Response      Comment
                                                     of the receiving waters
                                                 (3) dredged material is not disposed of in tidal water
                                                     beyond the artificial waterway unless there is a
                                                     beneficial reuse, e.g. beach nourishment.
                                                 Editor’s note: For more information on environmental values and
                                                 water quality objectives see schedule 1 of the Environment
                                                 Protection (Water) Policy 2009.
                                                 And
                                                 AO12.4 The location of the artificial waterways avoids             N/A
                                                 matters of state environmental significance, or does not
                                                 result in any significant adverse impact on matters of state
                                                 environmental significance.
PO13 Development does not involve                No acceptable outcome is prescribed.                               N/A
reclamation of land below tidal water,
other than for the purposes of:
(1) coastal-dependent development,
     public marine development or
     community infrastructure
(2) strategic ports, boat harbours or
     strategic airports and aviation
     facilities, in accordance with a
     statutory land use plan, where there
     is a demonstrated net benefit for the
     state or region and no feasible
     alternative exists
(3) coastal protection work or work
     necessary to protect coastal
     resources or physical coastal
     processes.


Table 10.1.2: Operational work
Performance outcomes                             Acceptable outcomes                                                Response      Comment
PO1 Tidal works that is private marine           AO1.1 The location and design of tidal works that is               N/A
development does not result in adverse           private marine development:
impacts to tidal land.                           (1) is on private land abutting tidal water and used for
Editor’s note: In addressing this performance         property access purposes
outcome, the applicant should comply with the
performance criteria and acceptable standards    (2) occupies the minimum area reasonably required for
set out in the Operational Policy Building and        its designed purpose
engineering standards for tidal works,

State development assessment provisions                                            Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
5 December 2016 V1.10                                                                                                                                                                     Page 11 of 15
Log in to download the original file

Annexure B SDAP Coastal.pdf · 116 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.