Annexure B SDAP Coastal

Attached to the e-mail Planning report & IDAS Forms, Annexure A,B,D,E,F,G - Email 1 of 2 MCU17/0035.

of 16

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                                                                         Response column key:
10.1     Tidal works, or development in the coastal management district state code                                                                               Achieved
                                                                                                                                                             P/S Performance solution
                                                                                                                                                             N/A Not applicable
Table 10.1.1: All development
Performance outcomes                        Acceptable outcomes                                              Response      Comment
PO1 Development in a coastal hazard         AO1.1 Development is located outside a high coastal                            Complies – development located outside high coastal
area is compatible with the level of        hazard area unless it is:                                                      hazard area. Proposal for extension to the existing
severity of the coastal hazard.             (1) coastal-dependent development, or                                          Wilderness Campground is coastal dependent and able to
                                                                                                                           respond to inundation due to the temporary nature of the
                                            (2) compatible with inundation due to its nature or                            camping use.
                                                function, or
                                            (3) temporary, readily relocatable, or able to be
                                                abandoned, or
                                            (4) essential community service infrastructure, or
                                            (5) small- to-medium scale tourist development, or
                                            (6) redevelopment within an existing built-up urban area,
                                                or is redevelopment of built structures that cannot be
                                                relocated or abandoned.
                                            And
                                            AO1.2 Development referred to in AO1.1(6) avoids being           N/A
                                            located within a high coastal hazard area, or where this is
                                            not practicable, minimises the exposure of people and
                                            permanent structures to coastal hazard impacts.
PO2 Development siting, layout and          AO2.1 Development within a coastal hazard area is                              Complies - development located outside medium and high
access in a coastal hazard area             located, designed, constructed and operated to maintain                        storm inundation.
responds to potential inundation due to a   or enhance the community’s resilience to a defined storm
defined storm tide event and minimises      tide event by limiting the exposure of people and
associated risks to personal safety and     structures to associated impacts.
property.                                   And
                                            AO2.2 Development mitigates any residual impacts from                          Complies - development located outside medium and high
                                            storm tide inundation in a coastal hazard area including by                    storm inundation
                                            ensuring:
                                            (1) habitable rooms of built structures are located above
                                                the defined storm tide event level and any additional
                                                freeboard level that would ordinarily apply in a flood
                                                prone area under a relevant planning scheme
                                                standard, or
                                            (2) a safe refuge is available for people within the
                                                premises during a defined storm tide event, or
                                            (3) at least one evacuation route remains passable for


State development assessment provisions                                     Module 10 — Coastal protection         10.1 Tidal works, or development in the coastal management district state code
5 December 2016 V1.10                                                                                                                                                              Page 1 of 15
Log in to download the original file

Annexure B SDAP Coastal.pdf · 116 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.