Original source · versioned page text
Decision Notice - OPW22 0251 [As Published]
2211-31930 SRA
Attachment 3—Reasons for referral agency response
(Given under section 56(7) of the Planning Act 2016)
The reasons for the SARA’s decision are:
* The proposal is for a development permit for operational works below high-water mark, prescribed
tidal works: revetment wall reconstruction and stabilization of eroded backfill and foreshore terrace
subgrade soils.
* The subject site is located in an area of coastal protection, high risk maritime development zone and
marine plants.
* SARA assessed the development application against State code 7: Maritime Safety, State code 8:
Coastal development and tidal works and State code 11: Removal, destruction or damage of marine
plants of the SDAP, version 3.0 and determined that with conditions, the development achieves
compliance with the performance outcomes of the State codes.
Material used in the assessment of the application:
the development application material and submitted plans
Planning Act 2016
Planning Regulation 2017
the SDAP (version 3.0), as published by SARA
the Development Assessment Rules
SARA DA Mapping system
section 58 of the Human Rights Act 2019
Attachment 4—Representations about a referral agency response
provisions
{page left intentionally blank)
State Assessment and Referral Agency Page 8 of O
Document Set ID: 22549959 Page 14 of 38
Version: 4, Version Date: 23/08/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.