Decision Notice - OPW22 0251 [As Published]

of 38

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

               21.    The developer must ensure sediment does not leave the site or enter onto adjoining
                      properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
                      machinery. It is essential to implement appropriate approved erosion and sediment control
                      measures throughout the site during all phases of construction including vehicle shakedown
                      pad/grid (or similar) at the access to the construction site. Where sediments or other
                      contaminants are deposited on a road, they must be removed so as not to enter Council’s
                      drainage system or waterways.
               22.    Prior to the completion of the development and commencement of use, all site surfaces must
                      be effectively stabilised using methods which have achieved effective short-term stabilisation
                      and which will continue to achieve effective stabilisation in the medium to long-term.
               23.    Certification by a Registered Professional Engineer of Queensland that states that the
                      revetment wall and associated structures are constructed in accordance with best practice
                      methods and are structurally sound must be submitted to Council. This certification must be
                      submitted to Council within three (3) months of the completion of the works. A final inspection
                      and approval of the structure by Council’s Inspector is also required. Please contact Council’s
                      Development Assessment Branch on 5329 6500 to arrange the inspection.
               24.    This approval lapses where the construction of the revetment wall and associated structures
                      have not commenced within two (2) years of the date of issue of the approval unless
                      application is made and approved by Council for an extension.
               25.    After completion, the proposed works must be maintained in a sound state of repair in
                      accordance with the approved plans.
               5.     REFERENCE DOCUMENTS

                      Not applicable
               6.     REFERRAL AGENCIES

               The referral agencies applicable to this application are:

                Referral Status        Referral Agency and Referral Trigger                 Response
                                       Address

                Concurrence            State Assessment        Planning Regulation          The agency provided its
                                       Referral Agency         2017 Schedule 10, Part       response on 17 July
                                       (SARA)                                               2023 (Reference No.
                                                               17 – Tidal Works or
                                       South East                                           2211-31930 SRA). A
                                                               Works in a Coastal           copy of the response is
                                       Queensland (North)
                                                               Management District          attached
                                       Regional Office
                                       PO Box 1129,
                                       Maroochydore QLD
                                       4558

               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      General Advisory Notes
               1.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
                      the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.




                                                                                                       Page 4 of 38
Document Set ID: 22549959
Version: 4, Version Date: 23/08/2023
Log in to download the original file

Decision Notice - OPW22 0251 [As Published].pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.