Original source · versioned page text
Reference Documents - MCU23-0142
Original PDF page 19, section 1. The text section number identifies this passage in the reader.
and beyond construction. All constructed retaining walls must have effective drainage measures upslope and beyond the walls to relieve any sub-surface water pressure/build-up. These drains must be maintained and flushed out regularly. To achieve this we recommend bringing the upstream end of the drain to surface and capping off to allow future flush out. 6.4 Climate Change Consideration for Year 2100 To consider the impacts of climate change a 20% increase in rainfall intensity was adopted for the year 2100. All stormwater infrastructure is to be designed with a rainfall multiplier of 1.2 in accordance with the design storms mentioned above. 7.0 FLOODING The Noosa Council Flood Search Certificate (Appendix E) confirms a defined flood event of 2.5m AHD. The proposed development will include a minimum floor level of 2.8m AHD to allow for 300mm freeboard as required by the Noosa Plan 2020. SCG Consulting engineers 16 SCG Ref: 33094(SWM).Rev A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Reference Documents - MCU23-0142.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.