Original source · versioned page text
Reference Documents - MCU23-0142
Original PDF page 66, section 1. The text section number identifies this passage in the reader.
3.2. On-going Management The tables below are not assessable as part of the development application instead for the demonstration of required tasks during the operational phase of the development and therefore intentionally left blank. Responsibilities have to be assigned for all on-going refuse management operations. This is generally done by a building operation staff. The following lists (Table 3.3 to Table 3.9) are designed to help managing responsibilities and monitor the refuse operations in order to maintain efficient services and a safe environment. Table 3.3: General Refuse Management Checklist Objectives Checked Remarks Organise temporary additional bins or collections to cater May also be required for high occupant turnover for additional waste generated during initial tenant move events. in. Organising of weekly pick-ups for all refuse streams. Liaise with council as required. Managing daily bin transfers between refuse storage / collection areas if required. 3.2.1. Safety Transferring refuse bins and using refuse management equipment are considered hazardous tasks. Therefore, contractors must ensure that a full risk assessment of equipment, surfaces and related gradients is complete. The contractor must provide procedural documentation to appropriate personnel prior to delivery of equipment and occupancy of the development. Table 3.4: Safety Checklist Objectives Checked Remarks Abiding by all relevant occupational health and safety legislation, regulations and guidelines to ensure site safety for occupants, visitors, staff and contractors. Assessment of any manual handling risks and preparation of a manual handling control plan for waste and bin transfers. Provision of equipment manuals, training, health and safety procedures, risk assessments and personal protective equipment to staff / contractors in order to control hazards associated with all waste management activities. Site: 23 – 25 Sidoni Street, Tewantin 22 Reference: 23BRW0171
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Reference Documents - MCU23-0142.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.