Original source · versioned page text
Reference Documents - MCU23-0142
Original PDF page 69, section 1. The text section number identifies this passage in the reader.
3.2.6. Monitoring and Review Regular monitoring and inspections of waste and related equipment and facilities from the development should be conducted by building management or designated staff. Table 3.9: Monitoring and Review Checklist Objectives Checked Remarks Continual monitoring of equipment uses and scheduling to ensure best operational outcomes. Regular review of refuse management equipment and facilities such as bin volumes, refuse storage capacities and stormwater management arrangements. Review service frequency and methodology on 6 monthly intervals with collecting contractor. Update and amend OWMP based on review outcomes. Site: 23 – 25 Sidoni Street, Tewantin 25 Reference: 23BRW0171
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Reference Documents - MCU23-0142.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.