35. All paths, pram ramps, driveways and parking areas shall be designed and constructed to ensure
pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to be in
accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for
Access & Mobility.
36. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
footpath paving and landscaping such as trees and grasses in accordance with Council’s Standard
specifications prior to commencement of the use permitted by this permit.
Roof Water & Stormwater Drainage
37. Roof runoff from the new building shall be directed to a rainwater storage system or tank (minimum
storage 9000 litres) that is installed to ensure water from the tank is used for external uses (such
as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools,
outdoor cleaning, etc) and for use in flushing of toilets internal to the building. All rainwater tanks
are to be designed and installed in accordance with the Queensland Development Code (QDC),
Part 25 – Rainwater Tanks, and shall be part of the plumbing application in conjunction with the
building approval. The location and capacity of the tanks shall be clearly shown on the plans
submitted for Operational Works approval and any overflow shall be directed to the road frontage.
38. All stormwater drainage (including roof water overflow from the rainwater storage system) shall be
collected and discharged so there is no net increase in stormwater runoff from the site.
Stormwater drainage permitted to drain from the site shall be discharged to Council’s:
38.1. existing drainage structures in David Low Way. Plans of the drainage design shall be prepared by
a Registered Professional Civil Engineer and submitted to Council prior to obtaining a
Development Permit for Operational Works, and/or
38.2. kerb & channel street drainage system in David Low Way. Plans of the drainage design shall be
prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a
Development Permit for Operational Works.
The maximum discharge of stormwater drainage allowable to Council’s kerb & channel
street drainage system at any one location is 25 litres/second.
39. As the site is proposed to be filled, appropriate stormwater drainage pipes shall be installed within
the site to collect and discharge stormwater runoff from all adjoining properties to prevent
additional ponding/flooding on these properties.
40. To ensure that polluted run-off does not enter Council’s stormwater drainage system, stormwater
run-off from the carparking areas and the driveways shall have the first flush (the first 12 mm of
rainfall or hose-down) collected in a grease/oil arrestor provided on site prior to being permitted to
discharge into Council’s drainage system.
All other clean stormwater, such as roof water, can be collected on site and discharged through a
single underground drain line directly into the existing drainage system, bypassing the grease/oil
arrestor.
To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors,
which shall be submitted to the Council prior to obtaining a Development Permit for Operational
Works.
The approved maintenance plan shall be incorporated in the management of the development and
a copy of this shall be provided for Council’s records prior to commencement of the approved Use.
A Development Permit for Building Works shall not be granted until a Development Permit for
Operational Works has been issued in regard to the drainage scheme.
41. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
42. The site shall be connected to Council’s existing sewerage reticulation systems and be constructed
in accordance with Council’s standards and requirements at no cost to Council.
43. The existing sewer main that traverses the site and the ‘zone of influence’ (taken as the area within
a 45-degree angle measured from the invert of the sewer main to the finished surface level) shall
be accurately located and determined by a licensed Surveyor and shown on all plans submitted for
Operational Works approval.
To ensure Council’s sewer main is accessible for maintenance purposes and is protected from risk
of damage no structures requiring a building permit (eg. buildings, swimming pools, retaining walls
exceeding 1m in height, raised terraces, etc) shall be constructed within this ‘zone of influence’ or
within 1.5m of the centreline of the sewer main, whichever is the greater. As such the applicant
shall amend Operational Works plans including Building plans to ensure compliance.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@b808a965\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/2552 NEGOTIATED Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 65 KB (small file)
- File type
No other editions are linked here.