               APPLICATION FOR A MINOR CHANGE TO A DEVELOPMENT APPROVAL
               Author                  Senior Town planner, Andrew Gaffney
                                       Development Assessment



                    APPLICATION DETAILS

                    Application No.                 MCU21/0117.02 & OPW21/0199.02

                    Development Approval            MCU21/0117.01 & OPW21/0199.01

                    Applicant                       Cooroy Villas Ltd

                    Request Received On             26 August 2025

                    Report Reviewed By              Andrew Gaffney – 10 April 2026

                    Decision Due Date               10 April 2026


                    PROPERTY DETAILS

                    Property Address                5 Pearl St Cooroy Qld 456354 Elm St Cooroy Qld 4563

                    RP Description                  Lot 2 RP 64750, Lot 2 RP 153798

                    Land Area                       5 Pearl St - 759 m² 54 Elm St – 1,518m²

                    Existing Use of Land            Vacant


                    STATUTORY DETAILS

                    SEQRP Designation               Urban Footprint

                    Zone                            Medium Density Residential

                    Precinct                        Not applicable

                    Local Area Plan                 Cooroy Local Plan Area Code

                    Overlays                        Regional Infrastructure Overlay Code (Water Supply Pipeline)

                    Assessment Type                 Minor Change to Development Approval



               1.      PROPOSAL
               The application seeks approval for a minor change to an existing Material Change of Use and
               associated Operational Works approval.



                                                                                                    Page 1 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026
Full text of the other 28 pages

Page 2

               The proposed changes involve increasing the number of bedrooms within Units 11 and 12 from
               two to three bedrooms, together with minor internal layout alterations and minor changes to
               building façades. The requested changes include;
                -   conversion of Units 11 and 12 to 3 bedroom units which now results in 8 x two bedroom units
                    and 4 x two bedroom units;
                -   the extension of ground-level decks over the existing stormwater swale drain at the rear of the
                    site;
                -   updates to landscaping to reflect a 0.5-metre wide landscaped setback along the internal
                    driveway;
                -   amendments to car parking numbers to reflect the additional bedrooms; and
                -   updates to the approved stormwater and engineering plans to align with detailed operational
                    works drawings.
               Changes to the following Conditions is required;
               •      Condition 2: Update approved plans list;
               •      Condition 29: Landscaping—include 0.5m setback along driveway;
               •      Condition 32: Update car parking numbers;
               •      Conditions 34 & 35: Stormwater drainage and quality treatment updates;

               •      Condition 48: Update approved engineering and landscaping plans;
               •      Condition 63: Update MCU reference to MCU21/0117.02;
               •      Condition 97: Align landscaping with MCU condition; and
               •      Delete Item 9 (Reference Documents): Remove Site-Based Stormwater Management Plan

               The overall number of dwellings, building height, scale and development footprint remain
               unchanged.
               The locality and proposal plan are included below.




                                                                                                     Page 2 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 3

a ,
il eT) TE =
= | etal

\

-

 

Figure 1 — Locality

Page 3 of 29

Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 4

2
z
2
3?
ai

 

 

 

 

 

 

 

 

 

 

 

 

BUILDING 62 ~~~~-~--

BUILDING 01

          

BUILDING 03

Page 4 of 29

Version: 7, Version Date: 17/04/2026

Document Set ID: 24138568

Page 5

                                       Figure 3 – Floor Plan




                                                               Page 5 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 6

                                                       Figure 4 – Elevations

               2.     BACKGROUND
               19 January 2021 -       MCU21/0117 - A development approval for a (Multiple Dwelling - 11 units)
                                       was approved.
               12 July 2024 -                MCU21/0117.01 - A change request for a (Multiple Dwelling - 12
                                       units) was approved.


               3.     ASSESSMENT
               3.1. Instruments for Statutory Assessment
               Under the Planning Act 2016 the application must be assessed against each of the following
               statutory planning instruments to the extent they are relevant to the development:
               •      State Planning Policy;
               •      South East Queensland Regional Plan;
               •      Planning Regulation 2017; and
               •      Noosa Plan 2020 (25 September 2020).
               3.2. Statutory Process
               The applicant has requested to make a minor change to a development approval under s78 of the
               Planning Act 2016. An application for a minor change to a development approval can only be made
               in circumstances where a change would constitute a ‘minor change’.
               The proposed change to the development approval requested by the applicant is determined to
               constitute a minor change on the grounds that:
               •      the development would not result in substantially different development as the proposal does
                      not:
                      o     involve a new use; or
                      o     result in the application applying to a new parcel of land; or
                      o     dramatically change the built form in terms of scale, bulk and appearance; or
                      o     change the ability of the proposed development to operate as intended; or
                      o     remove a component that is integral to the operation of the development; or



                                                                                                    Page 6 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 7

                      o     significantly impact on traffic flow and the transport network, such as increasing traffic
                            to the site; or
                      o     introduce new impacts or increase the severity of known impacts; or
                      o     remove an incentive or offset component that would have balanced a negative impact
                            of the development; or
                      o     impact on infrastructure provisions.
               •      the change does not include prohibited development;
               •      the change would not require the application to be referred to an additional referral agency
                      or cause a referral agency to have regard to new matters prescribed by regulation;
               •      where the original application was code assessable, the change would not cause the
                      application to become impact assessable.
               3.3. Statutory Instruments – Planning Scheme
               The original application was lodged and assessed under the now superseded Noosa Plan 2020
               (Sept 2020). Pursuant to s81 of the Planning Act 2017, Council must consider the planning scheme
               in effect when the original development application was lodged, however Council may give weight
               to Noosa Plan 2020 as the planning scheme in effect at the time of the minor change application
               being lodged.
               The following codes from Noosa Plan 2020 are applicable to this development:
               •    Medium Density Residential Zone Code;
               •    Cooroy Local Plan Code;
               •    Dual Occupancy and Multiple Dwelling Code;
               •    Works Codes; and
               •    Regional Infrastructure Overlay Code (Water Supply Pipeline).




                                                                                                        Page 7 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 8

               Existing Condition 2
                      Approved Plans
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.          Rev.            Plan/Document Name                    Date

                        7283 – DA02       -               Location Plan and Notes, prepared 16/05/2024
                                                          by Blackburne Jackson

                        7283 – DA03       -               Site Plan – Level 1 & Level 2 16/05/2024
                                                          prepared by Blackburne Jackson

                        Amendments        The above plan is required to be amended to accommodate a 0.5
                                          metre wide landscape bed along the full length of the driveway
                                          (western side of driveway) from Pearl Street.

                        7283 – DA04       -               Floor Plan – Level 1 prepared by 16/05/2024
                                                          Blackburne Jackson

                        Amendments        The above plan is required to be amended to accommodate a 0.5
                                          metre wide landscape bed along the full length of the driveway
                                          (western side of driveway) from Pearl Street.

                        7283 – DA05       -               Floor plan - Level 2 prepared by 16/05/2024
                                                          Blackburne Jackson

                        7283 – DA06       -               Roof Plan - Level 2 prepared by 16/05/2024
                                                          Blackburne Jackson

                        7283 – DA07       -               Elevations - prepared by Blackburne 16/05/2024
                                                          Jackson
                                                          As annotated by Noosa Council.

                        7283 – DA08       -               Elevations - prepared by Blackburne 16/05/2024
                                                          Jackson

                        7283 – DA09       -               Sections - prepared by Blackburne 16/05/2024
                                                          Jackson

                        7283 – DA10       -               Finishes - prepared by Blackburne 16/05/2024
                                                          Jackson

                        7283 – DA17       -               Elevations – Boundary prepared by 16/05/2024
                                                          Blackburne Jackson

                        7283_L01-01_G                     Landscape Notes and Schedules         Sept 2023

                        7283_L03-01_G                     Landscape Planting Plan prepared Sept 2023
                                                          by Blackburne Jackson
                                                          As annotated by Noosa Council



                                                                                                   Page 8 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 9

                        Amendments        The above plan is required to be amended to accommodate a 0.5
                                          metre wide landscape bed along the full length of the driveway
                                          (western side of driveway) from Pearl Street.

                        7283_L07-01_G                     Landscape Details       prepared   by Sept 2023
                                                          Blackburne Jackson


               Applicant’s Request
               The applicant submits;
               The change to condition 2 is sought as some minor changes to the built form and the internal layout
               (1 bedroom added to each of Units 11 and 12) are proposed, and the plans reflect those changes.
               As set out in the Table below, the development fully complies with all the key parameters including
               building height and frontage setbacks to Pearl Street which are approved as part of
               MCU21/0117.01.
               The applicant has requested existing Condition 2 be amended and replaced with the following
               amended condition:
                      Approved Plans
               2.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.               Rev.        Plan/Document Name                    Date

                        DA01                    10         Cover    Page,    prepared        by 04-08-25
                                                           Blackburne Jackson

                        DA02                    10         Location Plan & Notes, prepared
                                                           by Blackburne Jackson                    04-08-25

                        DA03                    11         Site Plan – Level 1 & 2, prepared 14-08-25
                                                           by Blackburne Jackson

                        DA04                    11         Floor Plan – Level 1, prepared by 14-08-25
                                                           Blackburne Jackson

                        DA05                    10         Floor Plan – Level 2, prepared by 04-08-25
                                                           Blackburne Jackson

                        DA06                    10         Roof Plan, prepared by Blackburne 04-08-25
                                                           Jackson

                        DA07                    10         Elevations, prepared by Blackburne 04-08-25
                                                           Jackson

                        DA08                    10         Elevations, prepared by Blackburne 04-08-25
                                                           Jackson

                        DA09                    10         Sections, prepared by Blackburne 04/08/25
                                                           Jackson



                                                                                                    Page 9 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 10

                        DA14                    10        Perspectives,  prepared      by       04-08-25
                                                          Blackburne Jackson

                        DA15                    10        Perspectives,   prepared     by       04-08-25
                                                          Blackburne Jackson

                        L01-01_I                 I        Landscape Notes & Schedules, 08-08-25
                                                          prepared by Blackburne Jackson

                        L03-01_J                 J        Landscape      Planting    Plan, 14-08-25
                                                          prepared by Blackburne Jackson

                        L03-02_J                 J         Landscape      Planting     Plan, 14-08-25
                                                           prepared by Blackburne Jackson

                        L07-01_I                 I         Landscape Details, prepared by 08-08-25
                                                           Blackburne Jackson

                        L07-02_A                 A         Landscape Details, prepared by 08-08-25
                                                           Blackburne Jackson



               Assessment of Request
               Agree.
               The condition is required to be amended to reflect the requested changes and to includes the plan
               amendments from the original approval.
               Recommendation
               It is recommended existing Condition 2 be amended to read as follows:
                      Approved Plans
               2.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.               Rev.       Plan/Document Name                    Date

                        DA01                    10        Cover   Page,   prepared          by 04-08-25
                                                          Blackburne Jackson

                        DA02                    10        Location Plan & Notes, prepared
                                                          by Blackburne Jackson                    04-08-25

                        DA03                    11        Site Plan     –     Level 1 & 2, 14-08-25
                                                          prepared          by     Blackburne
                                                          Jackson

                        DA04                    13        Floor Plan – Level 1, prepared by 17-12-25
                                                          Blackburne Jackson
                                                          Annotated by Council




                                                                                                 Page 10 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 11

                        DA05                      10        Floor Plan – Level 2, prepared by 04-08-25
                                                            Blackburne Jackson

                        DA06                      10        Roof    Plan,   prepared       by 04-08-25
                                                            Blackburne Jackson

                        DA07                      10        Elevations,    prepared        by 04-08-25
                                                            Blackburne Jackson

                        DA08                      10        Elevations,    prepared        by 04-08-25
                                                            Blackburne Jackson

                        DA09                      10        Sections,     prepared         by 04/08/25
                                                            Blackburne Jackson

                        DA14                      10        Perspectives, prepared by           04-08-25
                                                            Blackburne Jackson

                        DA15                      10        Perspectives, prepared by           04-08-25
                                                            Blackburne Jackson

                        DA17                      06        Elevations - Boundary, prepared 04-08-25
                                                            by Blackburne Jackson

                        L01-01_I                   I        Landscape Notes & Schedules, 08-08-25
                                                            prepared by Blackburne Jackson

                        L03-01_J                   J        Landscape       Planting  Plan, 14-08-25
                                                            prepared         by Blackburne
                                                            Jackson

                        L03-02_J                   J        Landscape     Planting    Plan, 14-08-25
                                                            prepared by Blackburne Jackson

                        L07-01_I                   I        Landscape Details, prepared by 08-08-25
                                                            Blackburne Jackson

                        L07-02_A                  A         Landscape Details, prepared by 08-08-25
                                                            Blackburne Jackson




               Existing Condition 29


               29.    The development site must be landscaped. The works must be undertaken in accordance
                      with the Noosa Plan PSP 2 – Landscaping and generally in accordance with the approved
                      Landscaping Plans and in particular:
                      a)      A dense 2m minimum landscaped setback to the full length of the site’s frontage to
                              Pearl Street (excluding access, fence and bin enclosure).



                                                                                                  Page 11 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 12

                      b)      A dense 2.0 m minimum landscaped setback to the full length of the site’s frontage to
                              Elm Street.
                      c)      A dense 1.0 m minimum landscaped setback to all side boundaries (excluding
                              stormwater infrastructure).
                      d)      The provision of 3 new street trees in accordance with PSP 2 – Landscaping.
                      e)      All landscape works must be established and maintained in accordance with the
                              approved design for the life of the development, and in a manner that ensures healthy,
                              sustained and vigorous plant growth. All plant material must be allowed to grow to full
                              form and be refurbished when its life expectancy is reach.


               Applicant’s Request
               The applicant has requested existing Condition 29 be amended and replaced with the following
               amended condition:
               29.    The development site must be landscaped. The works must be undertaken in accordance
                      with the Noosa Plan PSP 2 – Landscaping and generally in accordance with the approved
                      Landscaping Plans and in particular:
                       a)           A dense 2m minimum landscaped setback to the full length of the site’s frontage
                              to Pearl Street (excluding access, fence and bin enclosure).
                       b)           A dense 2m minimum landscaped setback to the full length of the site’s frontage
                              to Elm Street.
                       c)           A dense 1m minimum landscaped setback to all side boundaries (excluding
                              stormwater infrastructure) except along the proposed driveway which adjoins Lot 1
                              RP153798 where a 0.5m wide landscape setback must be provided.
                       d)           The provision of 3 new street trees in accordance with PSP 2 – Landscaping.
                       e)           All landscape works must be established and maintained in accordance with the
                              approved design for the life of the development, and in a manner that ensures healthy,
                              sustained and vigorous plant growth. All plant material must be allowed to grow to full
                              form and be refurbished when its life expectancy is reached.
               Assessment of Request
               The requested amendment includes a clarification that the side boundary adjacent to the internal
               driveway includes a 0.5metre landscaped setback as required under the plan amendments.
               Recommendation
               Agree.
               It is recommended existing condition 29 be amended to read as follows:
               29.    The development site must be landscaped. The works must be undertaken in accordance
                      with the Noosa Plan PSP 2 – Landscaping and generally in accordance with the approved
                      Landscaping Plans and in particular:
                      a)    A dense 2m minimum landscaped setback to the full length of the site’s frontage to Pearl
                            Street (excluding access, fence and bin enclosure).
                      b)    A dense 2.0 m minimum landscaped setback to the full length of the site’s frontage to
                            Elm Street.
                      c)    A dense 1.0 m minimum landscaped setback to all side boundaries (excluding
                            stormwater infrastructure) except along the proposed driveway which adjoins Lot 1
                            RP153798 where a 0.5m wide landscape setback must be provided.
                      d)    The provision of 3 new street trees in accordance with PSP 2 – Landscaping.



                                                                                                      Page 12 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 13

                      e)    All landscape works must be established and maintained in accordance with the
                            approved design for the life of the development, and in a manner that ensures healthy,
                            sustained and vigorous plant growth. All plant material must be allowed to grow to full
                            form and be refurbished when its life expectancy is reach.



               Existing Condition 32
                      Car Parking
               32.    A minimum of 20 car parking spaces must be provided and marked on the site. The works
                      must include in particular:
                      a)      14 covered parking spaces within the total;
                      b)      Four visitor parking spaces within the total, which are clearly marked for that purpose
                              and accessible at all times for visitor use; and
                      c)      Dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
                              Parking Facilities.


               Applicant’s Request
               A change to Condition 32 is required to reflect the carparking required resulting from the increase
               in bedrooms proposed. Noting the carparking numbers fully comply with the Planning Scheme.
               The applicant has requested existing condition 32 be amended and replaced with the following
               amended condition:
                      Car Parking
               32.    A minimum of 20 car parking spaces must be provided and marked on the site. The works
                      must include in particular:
                      a)      16 covered parking spaces within the total;
                      b)      Four visitor parking spaces within the total, which are clearly marked for that purpose
                              and accessible at all times for visitor use; and
                      c)      Dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
                              Parking Facilities.
               Assessment of Request
               Agree. The condition is required to be amended to reflect the onsite carparking numbers which
               results from the additional bedrooms.
               Recommendation
               It is recommended existing Condition 32 be amended to read as follows:
                      Car Parking
               32.    A minimum of 20 car parking spaces must be provided and marked on the site. The works
                      must include in particular:
                      a)      14 16 covered parking spaces within the total;
                      b)      Four visitor parking spaces within the total, which are clearly marked for that purpose
                              and accessible at all times for visitor use; and
                      c)      Dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
                              Parking Facilities.


                                                                                                      Page 13 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 14

               Existing Conditions 34 and 35
                      Stormwater Drainage
               34.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge and be in accordance with the Queensland Urban Drainage Manual (QUDM). The
                      works must be undertaken in accordance with an Operational Works approval and include in
                      particular:
                      a)      The works generally as shown on concept plan 23098/SK10 Revision G as prepared
                              by Morgan Consulting Engineers,
                      b)      Collection and lawful discharge of stormwater to ensure that adjoining properties,
                              reserves and roads are protected from ponding or actionable nuisance from stormwater
                              as a result of any works undertaken.
                      c)      the site stormwater system is to accommodate stormwater from Lot 1 RP153798
                              external to the site, including registration of drainage easements over the site drainage
                              system in favour of Lot 1 RP153798
                      d)      the use of gravity stormwater drainage and not surcharge pits
               35.    A stormwater quality treatment system must be provided for the development. The works
                      must be undertaken in accordance with the Bioretention Technical Design Guidelines (Water
                      by Design, 2012), and must include in particular stormwater quality treatment devices of a
                      size and location generally in accordance with those shown in cross sections shown on
                      concept plan 23098/SK10 Revision G as prepared by Morgan Consulting Engineers.
               Applicant’s Request
               The applicant submits that Conditions 34 and 35 are required to be amended to support the
               updated plans required by Council and extensions of the ground level decks requested by the
               applicant over the stormwater swale at the rear of Units 6 & 8.
               The applicant has requested existing condition 34 and 35 be amended and replaced with the
               following amended condition:

               Stormwater Drainage
               34.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge and be in accordance with the Queensland Urban Drainage Manual (QUDM). The
                      works must be undertaken in accordance with an Operational Works approval and include in
                      particular:
                      a)      The works generally in accordance with the approved engineering operational works
                              plans as prepared by Morgan Consulting Engineers.
                      b)      Collection and lawful discharge of stormwater to ensure that adjoining properties,
                              reserves and roads are protected from ponding or actionable nuisance from stormwater
                              as a result of any works undertaken.
                      c)      The site stormwater system is to accommodate stormwater from Lot 1 RP153798
                              external to the site, including registration of drainage easements over the site drainage
                              system in favour of Lot 1 RP153798.
                      d)       the use of gravity stormwater drainage and not surcharge pits




                                                                                                       Page 14 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 15

               36.     A stormwater quality treatment system must be provided for the development. The works
                       must be undertaken in accordance with the Bioretention Technical Design Guidelines (Water
                       by Design, 2012), and must include in particular stormwater quality treatment devices of a
                       size and location generally in accordance with the approved engineering operational works
                       plans as prepared by Morgan Consulting Engineers.


               Assessment of Request
               The requested amendment was referred to development engineering for consideration.
               Development engineering advise;
               The proposed engineering related changes include:
                     1. A deck extension to the Unit 6 terrace spanning across the proposed stone pitched swale;
                     2. Replacement of the Unit 8 terrace with a deck spanning across the level spreader /
                        stormwater discharge location;
                     3. Re-configuration of the bio-retention basin resulting in an increase of the bio-retention
                        area from 9m² to 16m².
               A site inspection confirmed that construction has occurred at the site regarding the enlargement
               level spreader and bio retention area. The bio-retention basin results in an increase area from 9m²
               to 16m². It is unclear why the inconsistency between the approved plans and the constructed
               infrastructure has occurred however the works do not impact the functioning of the stormwater
               design approved for the development consistent with Council’s Planning Scheme Policy - SC6.7.6
               Stormwater Management.
               Plans relevant to the MCU have been amended to ensure maintenance of the bio retention area
               can occur via common property and as such Council support the proposed changes.


               Recommendation
               Agree. It is recommended existing conditions 34 and 35 be amended as follows.


               Stormwater Drainage
               34.     The site must be provided with a stormwater drainage system connecting to a lawful point of
                       discharge and be in accordance with the Queensland Urban Drainage Manual (QUDM). The
                       works must be undertaken in accordance with an Operational Works approval and include in
                       particular:
                       a)     The works generally as shown in accordance with on concept plan 23098/SK10
                              Revision G the approved engineering operational works plans as prepared by Morgan
                              Consulting Engineers.
                       b)     Collection and lawful discharge of stormwater to ensure that adjoining properties,
                              reserves and roads are protected from ponding or actionable nuisance from stormwater
                              as a result of any works undertaken.
                       c)     The site stormwater system is to accommodate stormwater from Lot 1 RP153798
                              external to the site, including registration of drainage easements over the site drainage
                              system in favour of Lot 1 RP153798.
                       d)      the use of gravity stormwater drainage and not surcharge pits


               35.     A stormwater quality treatment system must be provided for the development. The works
                       must be undertaken in accordance with the Bioretention Technical Design Guidelines (Water
                       by Design, 2012), and must include in particular stormwater quality treatment devices of a

                                                                                                       Page 15 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 16

                      size and location generally in accordance with those shown in cross sections shown on
                      concept plan 23098/SK10 Revision G with the approved engineering operational works
                      plans as prepared by Morgan Consulting Engineers.




                                                                                             Page 16 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 17

               Existing Condition 48 (OPW approval)
               APPROVED PLANS
               48.    Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                      Plan No.          Rev.                Plan/Document Name                    Date

                      7283_L01-01_G                         Landscape Notes and schedules         Sept 2023

                      7283_L03-01_G                         Landscape planting plan               Sept 2023


                      Amendments        The above plan is required to be amended to accommodate a 0.5
                                        metre wide landscape bed along the full length of the driveway
                                        (western side of driveway) from Pearl Street.

                      7283_L07-01_G                         Landscape Details                     Sept 2023

                      The following plans require amendment.

                      Plan No.           Rev.       Plan/Document Name                           Date

                      23098/SK10         G          Concept Site Levels and Drainage Plan        14/05/2024
                                         1. The drawing is marked as conceptual and includes a note
                      Amendments
                                            advising the drawing is not to be used for construction. Provide
                                            an amended plan that is suitable for Operational Works
                                            Construction for Council approval prior to the prestart meeting.
                                         2. Prior to the prestart meeting, provide an amended plan to Council
                                            for approval that includes the frontage works required in
                                            accordance with the MCU Conditions.
                                         3. Prior to the prestart meeting, provide updated engineering plans
                                            which specifically address the following:
                                               a.   A piped solution is proposed for Lot 1 SP153798. Due to the
                                                    proposed surface levels of the development driveway, when
                                                    events exceed the 2%AEP, or when blockage of the pipe inlet
                                                    occurs, flooding/ponding on the upstream lot will occur.
                                                    Revise the design to ensure that no ponding/flooding on the
                                                    upstream lot will occur in the 1%AEP event based on design
                                                    blockage allowance for any pipe system, consistent with
                                                    QUDM.
                                               b. Provide cross and long sections and hydrologic and hydraulic
                                                  calculations for the swales proposed in the following
                                                  locations:
                                                      i.    On the eastern boundary of the development site to
                                                            convey flows from outlet 2/1 to the LPD
                                                      ii.   From the driveway low-point to the bioretention basin
                                                     iii.   On the northern and eastern boundaries of Lot 1
                                                            SP153798 to convey runoff from the external
                                                            catchment to inlet 1/1

                                                                                                     Page 17 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 18

                                               c. Provide ILs for the structures on the proposed stormwater
                                                  line and confirm what type of structure is 1/1 (headwall or
                                                  field inlet)




               Applicant’s Request
               The applicant submits that;
               The Landscaping Plans have been amended to reflect the required 0.5m garden along the western
               boundary of the driveway and as a result the listed amendment can be deleted and the detailed
               engineering plans included in the Table of approved plans.
               The applicant has requested existing Condition 48 be amended and replaced with the following
               amended condition:
               APPROVED PLANS
               48.    Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                             Plan No.        Rev.            Plan/Document Name                     Date

                             L01-01_I         I     Landscape Notes & Schedules, prepared        08-08-25
                                                    by Blackburne Jackson

                             L03-01_J         J     Landscape Planting Plan, prepared by         14-08-25
                                                    Blackburne Jackson

                             L03-02_J         J     Landscape Planting Plan, prepared by         14-08-25
                                                    Blackburne Jackson

                             L07-01_I         I     Landscape    Details,    prepared     by     08-08-25
                                                    Blackburne Jackson

                            L07-02_A          A     Landscape    Details,    prepared     by     08-08-25
                                                    Blackburne Jackson

                            23098/C00         F     Cover Sheet and Drawing Index,                07.08.25
                                                    prepared  by Morgan   Consulting
                                                    Engineers

                            23098/C01         B     Bulk Earthworks Layout Plan, prepared         07.08.25
                                                    by Morgan Consulting Engineers

                            23098/C02         A     Bulk Earthworks Sections, prepared by         07.08.25
                                                    Morgan Consulting Engineers

                            23098/C03         B     Concept Erosion and Sediment Control          09.08.24
                                                    Plan – Pre Construction, prepared by
                                                    Morgan Consulting Engineers

                            23098/C04         B     Concept Erosion and Sediment Control          09.08.24
                                                    Plan – Pre Construction, prepared by
                                                    Morgan Consulting Engineers

                                                                                                    Page 18 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 19

                            23098/C05   B   Concept Erosion and Sediment Control      09.08.24
                                            Details, prepared by Morgan Consulting
                                            Engineers

                            23098/C10   I   Site Works and Drainage Plan Layout       19.08.25
                                            Plan, prepared by Morgan Consulting
                                            Engineers

                            23098/C11   H   Site Works and Drainage Plan – Sheet 1,   19.08.25
                                            prepared    by    Morgan    Consulting
                                            Engineers

                            23098/C12   H   Site Works and Drainage Plan – Sheet 2,   19.08.25
                                            prepared    by    Morgan    Consulting
                                            Engineers

                            23098/C13   G   Site Works and Drainage Details – Sheet   19.08.25
                                            1, prepared by Morgan Consulting
                                            Engineers

                            23098/C14   F   Site Works and Drainage Details – Sheet   19.08.25
                                            2, prepared by Morgan Consulting
                                            Engineers

                            23098/C15   C   Site Works and Drainage Details – Sheet   19.08.25
                                            3, prepared by Morgan Consulting
                                            Engineers

                            23098/C20   F   Stormwater Drainage Catchment Plan,       19.08.25
                                            prepared   by   Morgan    Consulting
                                            Engineers

                            23098/C21   F   Stormwater Drainage Long Sections,        19.08.25
                                            prepared   by   Morgan  Consulting
                                            Engineers

                            23098/C22   F   Stormwater    Drainage  Calculations,     19.08.25
                                            prepared   by    Morgan  Consulting
                                            Engineers

                            23098/C30   F   External Roadworks Plan, prepared by      19.08.25
                                            Morgan Consulting Engineers

                            23098/C40   B   Sewage Plan Plan, prepared by Morgan      09.08.24
                                            Consulting Engineers

                            23098/C50   B   Water Reticulation Plan, prepared by      09.08.24
                                            Morgan Consulting Engineers

                            23098/C51   A   Water Reticulation Details, prepared by   09.08.24
                                            Morgan Consulting Engineers

                            23098/C60   B   Pavement Jointing Plan, prepared by       07.08.25
                                            Morgan Consulting Engineers


                                                                                        Page 19 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 20

                            23098/C61      B     Pavement Jointing Details, prepared by        08.08.25
                                                 Morgan Consulting Engineers


               Assessment of Request
               Agree. The landscape plans have been amended to include the requested changes.
               During the assessment of the request it has come to Council’s attention that the list of approved
               plans include several engineering plans which are not relevant to Council’s assessment involving
               water / sewer infrastructure etc. Engineering plans not relevant to Council’s assessment have
               been removed for the endorsed approved plans for Operational works.
               Recommendation
               It is recommended existing Condition 48 be amended to read as follows:


                             Plan No.     Rev.              Plan/Document Name                     Date

                             L01-01_I       I    Landscape Notes & Schedules, prepared by       08-08-25
                                                 Blackburne Jackson

                             L03-01_J      J     Landscape Planting Plan, prepared by           14-08-25
                                                 Blackburne Jackson

                             L03-02_J      J     Landscape Planting Plan, prepared by           14-08-25
                                                 Blackburne Jackson

                             L07-01_I       I    Landscape Details, prepared by Blackburne      08-08-25
                                                 Jackson

                             L07-02_A      A     Landscape Details, prepared by Blackburne      08-08-25
                                                 Jackson

                            23098/C00      F     Cover Sheet and Drawing Index, prepared         07.08.25
                                                 by Morgan Consulting Engineers

                            23098/C01      B     Bulk Earthworks Layout Plan, prepared by        07.08.25
                                                 Morgan Consulting Engineers

                            23098/C02      A     Bulk Earthworks Sections, prepared by           07.08.25
                                                 Morgan Consulting Engineers

                            23098/C10       I    Site Works and Drainage Plan Layout Plan,       19.08.25
                                                 prepared by Morgan Consulting Engineers

                            23098/C11      H     Site Works and Drainage Plan – Sheet 1,         19.08.25
                                                 prepared by Morgan Consulting Engineers

                                                                                                 Page 20 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 21

                            23098/C12         H     Site Works and Drainage Plan – Sheet 2,        19.08.25
                                                    prepared by Morgan Consulting Engineers

                            23098/C13         G     Site Works and Drainage Details – Sheet 1,     19.08.25
                                                    prepared by Morgan Consulting Engineers

                            23098/C14         F     Site Works and Drainage Details – Sheet 2,     19.08.25
                                                    prepared by Morgan Consulting Engineers

                            23098/C15         C     Site Works and Drainage Details – Sheet 3,     19.08.25
                                                    prepared by Morgan Consulting Engineers

                            23098/C20         F     Stormwater Drainage Catchment Plan,            19.08.25
                                                    prepared by Morgan Consulting Engineers

                            23098/C21         F     Stormwater Drainage Long Sections,             19.08.25
                                                    prepared by Morgan Consulting Engineers

                            23098/C22         F     Stormwater     Drainage     Calculations,      19.08.25
                                                    prepared by Morgan Consulting Engineers

                            23098/C30         F     External Roadworks Plan, prepared by           19.08.25
                                                    Morgan Consulting Engineers

                            23098/C60         B     Pavement Jointing Plan, prepared         by    07.08.25
                                                    Morgan Consulting Engineers

                            23098/C61         B     Pavement Jointing Details, prepared by         08.08.25
                                                    Morgan Consulting Engineers




               Existing Condition 63 (OPW approval)
               63.    All works must be constructed and work procedure undertaken in accordance with:
                      a)      The approved plans/documents and conditions detailed in this Decision Notice;
                      b)      The relevant conditions of the higher order Material Change of Use approval viz.
                              MCU21/0117.01 to which this approval relates;
                      c)      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines;
                      d)      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.


               Applicant’s Request

                                                                                                   Page 21 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 22

               The applicant has requested existing Condition 63 be amended and replaced with the following
               amended condition:
               63.    All works must be constructed and work procedure undertaken in accordance with:
                      a)      The approved plans/documents and conditions detailed in this Decision Notice;
                      b)      The relevant conditions of the higher order Material Change of Use approval viz.
                              MCU21/0117.02 to which this approval relates;
                      c)      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines;
                      d)      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site..
               Assessment of Request
               Agree.
               The condition is required to be amended to reflect the current application number.
               Recommendation
               It is recommended existing condition 63 be amended to read as follows:


               63.    All works must be constructed and work procedure undertaken in accordance with:
                      a)      The approved plans/documents and conditions detailed in this Decision Notice;
                      b)      The relevant conditions of the higher order Material Change of Use approval viz.
                              MCU21/0117.01 MCU21/0117.02 to which this approval relates;
                      c)      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines;
                      d)      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.



               Existing Condition 97 (OPW approval)
                      Landscaping
               97.    The development site must be landscaped. The works must be undertaken in accordance
                      Noosa Plan PSP 2 – Landscaping and generally in accordance with the approved
                      Landscaping Plans and in particular:
                      a)      A dense 2m minimum landscaped setback to the full length of the site’s frontage to
                              Pearl Street (excluding access, fence and bin enclosure).
                      b)      A dense 2m minimum landscaped setback to the full length of the site’s frontage to Elm
                              Street.
                      c)      A dense 1m minimum landscaped setback to all side boundaries (excluding stormwater
                              infrastructure).
                      d)      Retention of all existing street trees.




                                                                                                     Page 22 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 23

               Applicant’s Request
               The applicant has requested existing condition 97 be amended and replaced with the following
               amended condition:
                      Landscaping
               97.    The development site must be landscaped. The works must be undertaken in accordance
                      Noosa Plan PSP 2 – Landscaping and generally in accordance with the approved
                      Landscaping Plans and in particular:
                      a)      A dense 2m minimum landscaped setback to the full length of the site’s frontage to
                              Pearl Street (excluding access, fence and bin enclosure).
                      b)      A dense 2m minimum landscaped setback to the full length of the site’s frontage to Elm
                              Street.
                      c)      A dense 1m minimum landscaped setback to all side boundaries (excluding stormwater
                              infrastructure) except along the proposed driveway which adjoins Lot 1 RP153798
                              where a 0.5m wide landscape setback must be provided.
                      d)      The provision of 3 new street trees in accordance with PSP 2 – Landscaping.
                      e)      All landscape works must be established and maintained in accordance with the
                              approved design for the life of the development, and in a manner that ensures healthy,
                              sustained and vigorous plant growth. All plant material must be allowed to grow to full
                              form and be refurbished when its life expectancy is reached.


               Assessment of Request
               The requested amendment includes a clarification that the side boundary adjacent to the internal
               driveway includes a 0.5metre landscaped setback as required under the plan amendments.
               Recommendation
               Agree.
               It is recommended existing Condition 97 be amended to read as follows:
                      Landscaping
               97.    The development site must be landscaped. The works must be undertaken in accordance
                      Noosa Plan PSP 2 – Landscaping and generally in accordance with the approved
                      Landscaping Plans and in particular:
                      a)      A dense 2m minimum landscaped setback to the full length of the site’s frontage to
                              Pearl Street (excluding access, fence and bin enclosure).
                      b)      A dense 2m minimum landscaped setback to the full length of the site’s frontage to Elm
                              Street.
                      c)      A dense 1m minimum landscaped setback to all side boundaries (excluding stormwater
                              infrastructure) except along the proposed driveway which adjoins Lot 1 RP153798
                              where a 0.5m wide landscape setback must be provided.
                      d)      Retention of all existing street trees. The provision of 3 new street trees in
                              accordance with PSP 2 – Landscaping.
                      e)      All landscape works must be established and maintained in accordance with the
                              approved design for the life of the development, and in a manner that ensures
                              healthy, sustained and vigorous plant growth. All plant material must be allowed
                              to grow to full form and be refurbished when its life expectancy is reached.



                                                                                                      Page 23 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 24

               Existing Part 9 - REFERENCE DOCUMENT

                   Plan No.            Rev.   Plan/Document Name                                Date

                   23098 - SBSMP/4     4      Site-Based Stormwater Management Plan 14/5/2024
                                              prepared by Morgan Consulting Engineers

               Applicant’s Request
               The applicant has requested the referenced Site Based Stormwater Management Plan can be
               removed because the submitted detailed engineering Operational works plans are requested to be
               included as part of the approved plans.

               Assessment of Request
               Agree. The amended Stormwater Management Plans have been recommended for inclusion as
               Approved plans within the Operational works permit.

               Recommendation

                   Plan No.            Rev.   Plan/Document Name                                Date

                   23098 - SBSMP/4     4      Site-Based Stormwater Management Plan 14/5/2024
                                              prepared by Morgan Consulting Engineers




               4.      CONSULTATION
               4.1. Referral Agencies
               Not applicable
               4.2. Internal Council Referrals
               The application was forwarded to the following internal Council officers for review and/or comment:
               •       Senior Development Engineer, Development Assessment


               5.      CONCLUSION & REASONS FOR DECISION
               The proposed development generally complies with the requirements of the planning scheme and
               does not raise any significant issues that cannot be addressed by reasonable and relevant
               conditions. The application is therefore recommended for approval.
               The report is provided in accordance with Section 83(9) of the Planning Act 2016.
               RECOMMENDATION
               With regard to Application No. MCU21/0117.02 to make a minor change to an existing approval
               situated at 5 Pearl St Cooroy Qld 456354 Elm St Cooroy Qld 4563 and described as Lot 2 RP
               64750, Council on 10 April 2026 decided to:
               A.      Approve the change - Development Permit for Material Change of Use – Multiple Dwelling
                       (12 Units)
               B.      Amend Conditions 2, 29, 32, 34 & 35 of the Development Permit for Material Change of Use
                       to read as follows:


                                                                                                   Page 24 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 25

                      Approved Plans
               2.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.               Rev.       Plan/Document Name                    Date

                        DA01                    10        Cover    Page,    prepared        by 04-08-25
                                                          Blackburne Jackson

                        DA02                    10        Location Plan & Notes, prepared 04-08-25
                                                          by Blackburne Jackson

                        DA03                    11        Site Plan – Level 1 & 2, prepared 14-08-25
                                                          by Blackburne Jackson

                        DA04                    13        Floor Plan – Level 1, prepared by 17-12-25
                                                          Blackburne Jackson
                                                          Annotated by Council

                        DA05                    10        Floor Plan – Level 2, prepared by 04-08-25
                                                          Blackburne Jackson

                        DA06                    10        Roof Plan, prepared by Blackburne 04-08-25
                                                          Jackson

                        DA07                    10        Elevations, prepared by Blackburne 04-08-25
                                                          Jackson

                        DA08                    10        Elevations, prepared by Blackburne 04-08-25
                                                          Jackson

                        DA09                    10        Sections, prepared by Blackburne 04/08/25
                                                          Jackson

                        DA14                    10        Perspectives,  prepared      by       04-08-25
                                                          Blackburne Jackson

                        DA15                    10        Perspectives,   prepared     by       04-08-25
                                                          Blackburne Jackson

                        DA17                    06        Elevations - Boundary, prepared by 04-08-25
                                                          Blackburne Jackson

                        L01-01_I                 I        Landscape Notes & Schedules, 08-08-25
                                                          prepared by Blackburne Jackson

                        L03-01_J                 J        Landscape      Planting    Plan, 14-08-25
                                                          prepared by Blackburne Jackson

                        L03-02_J                 J         Landscape      Planting     Plan, 14-08-25
                                                           prepared by Blackburne Jackson




                                                                                                 Page 25 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 26

                        L07-01_I                     I         Landscape Details, prepared by 08-08-25
                                                               Blackburne Jackson

                        L07-02_A                    A          Landscape Details, prepared by 08-08-25
                                                               Blackburne Jackson



                      Condition 29
               29.    The development site must be landscaped. The works must be undertaken in accordance
                      with the Noosa Plan PSP 2 – Landscaping and generally in accordance with the approved
                      Landscaping Plans and in particular:
                      a)    A dense 2m minimum landscaped setback to the full length of the site’s frontage to Pearl
                            Street (excluding access, fence and bin enclosure).
                      b)    A dense 2m minimum landscaped setback to the full length of the site’s frontage to Elm
                            Street.
                      c)    A dense 1m minimum landscaped setback to all side boundaries (excluding stormwater
                            infrastructure) except along the proposed driveway which adjoins Lot 1 RP153798 where
                            a 0.5m wide landscape setback must be provided.
                      d)    The provision of 3 new street trees in accordance with PSP 2 – Landscaping.
                      e)    All landscape works must be established and maintained in accordance with the
                            approved design for the life of the development, and in a manner that ensures healthy,
                            sustained and vigorous plant growth. All plant material must be allowed to grow to full
                            form and be refurbished when its life expectancy is reached.


                      Car Parking
               32.    A minimum of 20 car parking spaces must be provided and marked on the site. The works
                      must include in particular:
                      a)      16 covered parking spaces within the total;
                      b)      Four visitor parking spaces within the total, which are clearly marked for that purpose
                              and accessible at all times for visitor use; and
                      e)      Dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
                              Parking Facilities.


               Stormwater Drainage
               34.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge and be in accordance with the Queensland Urban Drainage Manual (QUDM). The
                      works must be undertaken in accordance with an Operational Works approval and include in
                      particular:
                      a)      The works generally in accordance with the approved engineering operational works
                              plans as prepared by Morgan Consulting Engineers.
                      b)      Collection and lawful discharge of stormwater to ensure that adjoining properties,
                              reserves and roads are protected from ponding or actionable nuisance from stormwater
                              as a result of any works undertaken.
                      c)      The site stormwater system is to accommodate stormwater from Lot 1 RP153798
                              external to the site, including registration of drainage easements over the site drainage
                              system in favour of Lot 1 RP153798.
                      d)       the use of gravity stormwater drainage and not surcharge pits

                                                                                                       Page 26 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 27

               35.    A stormwater quality treatment system must be provided for the development. The works
                      must be undertaken in accordance with the Bioretention Technical Design Guidelines (Water
                      by Design, 2012), and must include in particular stormwater quality treatment devices of a
                      size and location generally in accordance with the approved engineering operational works
                      plans as prepared by Morgan Consulting Engineers.


               RECOMMENDATION
               With regard to Application No. OPW21/0199.02, to make a minor change to an existing approval
               situated at 5 Pearl St Cooroy Qld 456354 Elm St Cooroy Qld 4563 described Lot 2 RP 64750, Lot
               2 RP 153798, Council on 10 April 2026 decided to:
               A.     Approve the change to Development Permit for Operational Works.- Roadwork, Drainage
                      work, Landscaping, Stormwater & Earthworks
               B      Amend Conditions 48,63 & 97of the Development Permit for Operational Works to read as
                      follows:


               APPROVED PLANS
               48.    Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                     Plan No.              Rev.              Plan/Document Name                    Date

                     L01-01_I                I    Landscape Notes & Schedules, prepared by       08-08-25
                                                  Blackburne Jackson

                     L03-01_J               J     Landscape Planting Plan, prepared by           14-08-25
                                                  Blackburne Jackson

                     L03-02_J               J     Landscape Planting Plan, prepared by           14-08-25
                                                  Blackburne Jackson

                     L07-01_I                I    Landscape Details, prepared by Blackburne      08-08-25
                                                  Jackson

                     L07-02_A               A     Landscape Details, prepared by Blackburne      08-08-25
                                                  Jackson

                     23098/C00              F     Cover Sheet and Drawing Index, prepared        07.08.25
                                                  by Morgan Consulting Engineers

                     23098/C01              B     Bulk Earthworks Layout Plan, prepared by       07.08.25
                                                  Morgan Consulting Engineers




                                                                                                 Page 27 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 28

                     23098/C02                A     Bulk Earthworks Sections, prepared by         07.08.25
                                                    Morgan Consulting Engineers

                     23098/C10                 I    Site Works and Drainage Plan Layout Plan,     19.08.25
                                                    prepared by Morgan Consulting Engineers

                     23098/C11                H     Site Works and Drainage Plan – Sheet 1,       19.08.25
                                                    prepared by Morgan Consulting Engineers

                     23098/C12                H     Site Works and Drainage Plan – Sheet 2,       19.08.25
                                                    prepared by Morgan Consulting Engineers

                     23098/C13                G     Site Works and Drainage Details – Sheet 1,    19.08.25
                                                    prepared by Morgan Consulting Engineers

                     23098/C14                F     Site Works and Drainage Details – Sheet 2,    19.08.25
                                                    prepared by Morgan Consulting Engineers

                     23098/C15                C     Site Works and Drainage Details – Sheet 3,    19.08.25
                                                    prepared by Morgan Consulting Engineers

                     23098/C20                F     Stormwater Drainage Catchment Plan,           19.08.25
                                                    prepared by Morgan Consulting Engineers

                     23098/C21                F     Stormwater Drainage Long Sections,            19.08.25
                                                    prepared by Morgan Consulting Engineers

                     23098/C22                F     Stormwater     Drainage     Calculations,     19.08.25
                                                    prepared by Morgan Consulting Engineers

                     23098/C30                F     External Roadworks Plan, prepared by          19.08.25
                                                    Morgan Consulting Engineers

                     23098/C60                B     Pavement Jointing Plan, prepared        by    07.08.25
                                                    Morgan Consulting Engineers

                     23098/C61                B     Pavement Jointing Details, prepared by        08.08.25
                                                    Morgan Consulting Engineers



               63.    All works must be constructed and work procedure undertaken in accordance with:
                      a)      The approved plans/documents and conditions detailed in this Decision Notice;
                      b)      The relevant conditions of the higher order Material Change of Use approval viz.
                              MCU21/0117.02 to which this approval relates;


                                                                                                   Page 28 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Page 29

                      c)      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines;
                      d)      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site..


                      Landscaping
               97.    The development site must be landscaped. The works must be undertaken in accordance
                      Noosa Plan PSP 2 – Landscaping and generally in accordance with the approved
                      Landscaping Plans and in particular:
                      a)      A dense 2m minimum landscaped setback to the full length of the site’s frontage to
                              Pearl Street (excluding access, fence and bin enclosure).
                      b)      A dense 2m minimum landscaped setback to the full length of the site’s frontage to Elm
                              Street.
                      c)      A dense 1m minimum landscaped setback to all side boundaries (excluding stormwater
                              infrastructure) except along the proposed driveway which adjoins Lot 1 RP153798
                              where a 0.5m wide landscape setback must be provided.
                      d)      The provision of 3 new street trees in accordance with PSP 2 – Landscaping.
                      e)      All landscape works must be established and maintained in accordance with the
                              approved design for the life of the development, and in a manner that ensures healthy,
                              sustained and vigorous plant growth. All plant material must be allowed to grow to full
                              form and be refurbished when its life expectancy is reached.


               C.        Delete Part 9 Reference Documents and insert, Not applicable.




                                                                                                      Page 29 of 29



Document Set ID: 24138568
Version: 7, Version Date: 17/04/2026

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Report MCU21 0117 02 (As Published).pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.